Humongous 200ft super load arrives on site | Intel Ohio One

Поделиться
HTML-код
  • Опубликовано: 8 сен 2024
  • The latest Ohio super load arrives onsite at Intel's construction site. This air separation unit (ASU) weighs 916,000 pounds and the transport rigs and trailers were 280-plus feet in length.
    It joins two other ASUs in the lay-down yard with another one expected to arrive soon.
    More info about Ohio Super Loads:
    www.transporta...

Комментарии • 6