Amazing Liebherr HS 8130

Поделиться
HTML-код
  • Опубликовано: 3 окт 2024
  • Lago di Luzzone

Комментарии • 24

  • @davidwalker7383
    @davidwalker7383 Год назад +2

    Are they panning for gold?

  • @conek2
    @conek2 10 месяцев назад +1

    Rumor has it that they are still there filling that barge.

  • @lembriggs1075
    @lembriggs1075 3 года назад

    Wow! Now that is one good crane operator. So smooth and quick!

  • @tomt9543
    @tomt9543 3 года назад +2

    Looks like by the time the clamshell made it to the surface there water would have washed the majority of the mud out of it!

  • @jserra17
    @jserra17 Год назад

    Hard to understand why they are dredging so deep. Removing silt from a reservoir above a hydro plant? Gold dredging? Removing heavy metals or PCB contamination.

  • @robertswift8708
    @robertswift8708 Год назад +2

    3 years later the first barge is full.

  • @herbratamoeljo5076
    @herbratamoeljo5076 5 лет назад +1

    Amazing, how the rope managed its twisting and rotating of bucket up to more than 180 deg?

  • @ShannonFreng
    @ShannonFreng 6 месяцев назад

    Rivetting!

  • @scottpecora371
    @scottpecora371 4 года назад +1

    I hadn't thought about the silt from a reservoir, but this looks like Alaskan Pan handle area. My other thought is deep water gold dredging. Because it seems to me they aren't moving enough material to make it worth it's while if that's a reservoir being silt dredged. But I could possibly see going for deep water dredging because all the gold in those surrounding mountains is going to end up in the bottom of that fjord, if that's what it is. you're still going to have to move a lot of over burden. but if you can get down to the right level that would be some very virgin territory.? Or am I way off?

    • @CAT973D1
      @CAT973D1  4 года назад +1

      /www.liebherr.com/de/che/aktuelles/storys/hydroseilbagger-tessin/hydroseilbagger-tessin.html
      that was 150 - 200 meters ....

    • @ShannonFreng
      @ShannonFreng 6 месяцев назад

      @@CAT973D1This website is defunct.

  • @tutekohe1361
    @tutekohe1361 6 лет назад +7

    That is extremely deep dredging! I presume it is removing silt from a hydro dam or reservoir.

    • @abalada
      @abalada 4 года назад +1

      There is also a video which shows how they get this beast up there and with technical information. The working depth is 150 - 200 m.
      ruclips.net/video/S182uqsBIpo/видео.html

  • @arquivodefotos5404
    @arquivodefotos5404 2 года назад

    É preciso mais que isso para entrar num contrato do futuro na S.A. 6-7 .
    Os custos e rendimento tecnicos desta máquina são insuficientes para atender as exigências dos contratos.

  • @gordonmccoy4537
    @gordonmccoy4537 6 лет назад +2

    Very NICE...! Where...? Gordon

    • @CAT973D1
      @CAT973D1  6 лет назад

      www.liebherr.com/de/che/gesch%C3%A4ftsbericht/magazin/hydroseilbagger-tessin.html

  • @beavis8167
    @beavis8167 Год назад

    Dam how deep is that water???

  • @scottschumaker6816
    @scottschumaker6816 2 года назад +1

    You should never dig over your drive sprockets puts weight on track pins not on track

  • @buschul
    @buschul Год назад

    No hydraulic excavator can do that.

  • @arquivodefotos5404
    @arquivodefotos5404 2 года назад

    Sua balsa ainda não serve para entrar na era da mineração do novo milênio.

  • @peanutbutter2597
    @peanutbutter2597 4 года назад

    Cool ? They can't be dregging a shipping lane so are the harvesting mud

  • @fwstoangel6654
    @fwstoangel6654 3 года назад

    Hat der keine Freiläufe??

  • @Nitramrec
    @Nitramrec 5 лет назад +2

    Absolutely boring work!