Dock Installation With a Platform
HTML-код
- Опубликовано: 18 окт 2024
- This is a dock installation on bottom plates from start to finish. This install took 9 minutes. Note*** A first time install will take longer because you have to build all the framework. This is showing the installation after the first year.