Thank you for sharing the know how of step by step construction of footers I can't wait for the next vlog for the tie beam. Lot's kudos for you keep up the good work.
Wow that was a lot of hard work good thing thing you had a lot of workers around unlike here In US and that’s nice you give everyone the opportunity to work while helping you as well will follow you on your next video God bless 🙏😃❤️🤙🌺
More power Engineer! Laking tulong po nito lalo na sa amin mga graduating students na hindi naka ojt. Online ojt nalang po ako through your youtube channel. More vlogs pa po.❤️
now i know how our construction man build our house in philippines. 👍👍 im just saying, dont misunderstood. but i saw here in singapore is not the way like that. wala kasi ako alam sa mga ganyan, nakita ko lang dito sa singapore how they built thier houses. halimbawa sukat ng bahay ay 10meter ang haba at lawak, ganun ang kalawak ang huhukayin nila. tpos ung ilalim puro bakal. kapag na assemble na nila ang mga bakal ( poste at sahig ) tsaka na nila bubuhusan ng semento. kung gano kalawak ang bahay ganun kalawak buhusan ng semento. malalim ang hukay nia 6meters. kaya matibay ang mga bahay dito. kaso magastos sa bakal at semento at graba. tons talaga ang buhos. pasensya na kung magulo mapliwang ko 😁😁😁 at habang binubuo ang bahay naka assemble na rin ang mga wiring ng kuryente.
para di maputikan, ang footing ay nilalatag muna sa : 2"-3" gravel or 3" lean concrete base. Yung column pedestal naman at kinukulong porma pag matigas na footings. Syempre pag matubig, e i dewater muna hukay.
Para san po yung 135° bend sa anilyo now ko lang po kasi yin nakita tol sa lahat ng bahay nanginawa mo tol napaka anagas hehe bagong kaaalaman nanaman hehe di ko din alam yung combined footing lodi ka talaga tol
Informative episode Engineer. Learning more. Do we need a Civil Engineer to design the foundation only? We've the building structure already in Philippines. God bless !
In Phils for 1-2 storey dwellings a olan may just be drawn by an Architect provided they comply with the min reqmt of local Bldg Code. However, it is best to engage a civil) structural engineer as well.
Engineer alin po ang masmaganda ang may degrees ang anilyo o yung wala bakit po kailangan na may degrees pa. Sa second floor po na roof top ay slab kailangan po ba na dalawa ang tie beam. Saka may dati na po ako bahay balak ko patayo sa likod required paba stback kung firewall lang aprobahan kaya para sa bldg permit.. Maraming salamat po god bless
Good day boss, question po. Nag hhukay na po kami ng footing para sa 2 storey residential. Pero nkaka 1 meter plang sa hukay adobe/bedrock na agad. Itutuloy pa ba namin hukay? Kse 1.5m requirement. Pero mag dadag din kami ng tambak na 0.5m sa flooring kse medyo mababa at para tumaas sa natural grid line. Salamat po
Ang type of footing ay dini design ng structural engr at ighinuguhit sa plano. Hindi decided ng contruction engr/ contractor. So ang pinakikita dito ay paano ini execute ang construction ayon sa plano.
dapat alamin mo muna ano layout ng mga poste para malaman ang size. kadalasan pare pareho ang size ng exterior column for architectural reason at nagbabago lang ang no. o size ng bakal depende sa load na dadalhin. Ang interior columns mas malaki ang load kaya mas malaki o marami ang bakal. Kung 2 floors lang, pwede na yung required min size ng column ayon sa bldg official o architect.
Good day Engr.! Ask ko lng Kung ano po mauuna gawin sa pagpapagawa ng bahay..? Medyo malin kasi ung lote nabili. Patambakan po ba or pwedi rin tambakan pagkatapos maghukay ng mga poste?
Engr. Ilang poste Po 5x5 sqm 2 storey house. Kapag 16mm po Ang bakal sa poste ano Po maximum distance. May napanood Po kasi Ako apat lang na poste sa 5x5 2 storey house.
Hello po Sir! Tanong ko po kung ilang storey yung ni-cconstruct po natin sa video po na ito bakit po 6-16mm ang naging design po ng ating poste Sir? Thank you po! 😊
sabi daw eh humihina ang tibay ng semento kapag derekta sa lupa,,,kase daw eh sinisipsip ng lupa ang tubig na pinanghalo sa semento...totoo po ba to???
Sir good day! Tanong po about sa poste. Ang aming bahay ngayon na bungalo e may 6 na poste. Nagbabalak po kami palagyan ng 2nd to 3rd floor. Ang problema po e 4 na bakal lang ang nakikita ko sa bawat poste kasi meron posya abang. Paano po kaya ito?
one digs deeper than the planned level of footing for 2 reasons: 1) To remove the undesirable soil underneath ( e.g. clay, silt, organic matrl) and replace them with soil of better properties, and 2) To adjust the particular footing to a lower level having greater bearing capacity
Where are all my comments. You deleted all. Please keep my comments for reference. To see whatever I said is correct. Keep your post more interesting with my comments, for learning, improvements and cost savings.
Engineer Ronald, tumatanggap po ba kayo ng residential construction projects sa Antipolo? if yes, how can we reach out to you po? can we ask for your email address or mobile phone number? thank you
I can’t wait for what’s next! ! I’m following this vlog!
Thanks for watching 😊😁😁✌️
Nakakaexcite ang mga susunod n vlogs Engr! Keep us posted ok?
Thanks for watching 😊👍
Im so facinated by your job engineer.God bless you.
Thank you po😊
Salamat po sa pagturo ❤
Lagi kong panonoorin at aabangan mga videos mo
Wow ganda pagkagawa...galing
Thanks for watching
Wow! Its starting now
Watching from Florida! . Eto na talaga, step by step building a house!
Thanks for sharing 🥰🙏
Thanks for watching 😊👍
Wow dami ding work bago matapos, pero good job. Thanks for sharing.
Thanks for watching 😊👍
Please share
Thank you again for going back and putting closed caption in English. You’re the man!
Galing naman po nito Engr! Exciting ang nga susunod n mangyayare.keep up the good work! 👏👏👏
Thank you for sharing the know how of step by step construction of footers I can't wait for the next vlog for the tie beam. Lot's kudos for you keep up the good work.
😍 Salamat po sa video na ito Engineer, share ko po ito. Supporting your channel here in USA 🇺🇸
Thanks for watching 😊👍
Dami ko nakuha na info dito Engr! Salamat for keeping us updated 👍 God Bless your channel🙏🏻
Thanks for watching 😊👍
Wow that was a lot of hard work good thing thing you had a lot of workers around unlike here In US and that’s nice you give everyone the opportunity to work while helping you as well will follow you on your next video God bless 🙏😃❤️🤙🌺
Thanks for watching 😊👍 po
Watching it again, 🥰🙏😘
More power Engineer! Laking tulong po nito lalo na sa amin mga graduating students na hindi naka ojt. Online ojt nalang po ako through your youtube channel. More vlogs pa po.❤️
Thanks for watching 😊 good luck 😊 sayo
Very inspiring.. need more ideas for my projects
Subscribe kona dahil naging bahagi ka ng bahay serye ni Jessica ang pambansng potche🙏🙏
Sir yung parilya hnd ba kayo gumagawa ng concrete spacer bago buhusan?🤔🤔
Awesome how you get things done by hand that in 🇺🇸 we would use machinery
Thanks for watching 😊👍 Sir Michael
Well do it manually here
magandang araw enginner,..nkapatong po ba un paglagay nyo ng tiebeam sa pundasyon?..🙂
now i know how our construction man build our house in philippines. 👍👍
im just saying, dont misunderstood. but i saw here in singapore is not the way like that.
wala kasi ako alam sa mga ganyan, nakita ko lang dito sa singapore how they built thier houses. halimbawa sukat ng bahay ay 10meter ang haba at lawak, ganun ang kalawak ang huhukayin nila. tpos ung ilalim puro bakal. kapag na assemble na nila ang mga bakal ( poste at sahig ) tsaka na nila bubuhusan ng semento. kung gano kalawak ang bahay ganun kalawak buhusan ng semento.
malalim ang hukay nia 6meters. kaya matibay ang mga bahay dito. kaso magastos sa bakal at semento at graba. tons talaga ang buhos. pasensya na kung magulo mapliwang ko 😁😁😁
at habang binubuo ang bahay naka assemble na rin ang mga wiring ng kuryente.
Thanks for watching 😊👍
Thanks for sharing
Dapat may cover yong footing at rebars ng poste para di maputikan.
para di maputikan, ang footing ay nilalatag muna sa : 2"-3" gravel or 3" lean concrete base. Yung column pedestal naman at kinukulong porma pag matigas na footings. Syempre pag matubig, e i dewater muna hukay.
‘Love your vlogs, sir! I’d like to watch a series in building 2 Floors apartment building. Thanks!!!
Para san po yung 135° bend sa anilyo now ko lang po kasi yin nakita tol sa lahat ng bahay nanginawa mo tol napaka anagas hehe bagong kaaalaman nanaman hehe di ko din alam yung combined footing lodi ka talaga tol
There are many reasons but one of the most important reason is to resist seismic movement.
ano pong laki ng poste?
MARAMING SALAMAT
Please watch the first video 😊 nandun po sukat and laki ng poste 😊
Does a combine footing provide more strength and more earthquake stability to the structure? Then single footings
Informative episode Engineer. Learning more. Do we need a Civil Engineer to design the foundation only? We've the building structure already in Philippines. God bless !
Thanks for watching 😊👍 Sir
In Phils for 1-2 storey dwellings a olan may just be drawn by an Architect provided they comply with the min reqmt of local Bldg Code. However, it is best to engage a civil) structural engineer as well.
Can I ask, we don't need to use vibrator after concrete pouring?
salamat sir sa mga tips at info mu. kailangan koto para sa ipapatayu kung bldg. Hm po kya per square meters yung commercial residential sir?
Thanks for watching 😊 depends po sa location at area ng plano nyong ipatayo
sir Ronald yung house construction series mo & yung gawa serye ni BNT Jessica Absalon ang lagi ko ina abangan 😊
Thanks for watching 😊👍
Engineer alin po ang masmaganda ang may degrees ang anilyo o yung wala bakit po kailangan na may degrees pa. Sa second floor po na roof top ay slab kailangan po ba na dalawa ang tie beam. Saka may dati na po ako bahay balak ko patayo sa likod required paba stback kung firewall lang aprobahan kaya para sa bldg permit.. Maraming salamat po god bless
Kailangan sa footing yung short span nasa ilalim ang bakal engr ang long span sa ibabaw ty
Good day boss, question po. Nag hhukay na po kami ng footing para sa 2 storey residential. Pero nkaka 1 meter plang sa hukay adobe/bedrock na agad. Itutuloy pa ba namin hukay? Kse 1.5m requirement. Pero mag dadag din kami ng tambak na 0.5m sa flooring kse medyo mababa at para tumaas sa natural grid line. Salamat po
Engr. Ano pong size ng stirrups niyo po sa tie beam at ano po ang finished concrete size, salamat
Ang type of footing ay dini design ng structural engr at ighinuguhit sa plano. Hindi decided ng contruction engr/ contractor. So ang pinakikita dito ay paano ini execute ang construction ayon sa plano.
Pagawa ako bahay sayo engr dito sa davao city
Thanks for watching 😊
Engineer ano po ang size ng poste kapag may 2nd floor ang gagawing bahay?
dapat alamin mo muna ano layout ng mga poste para malaman ang size. kadalasan pare pareho ang size ng exterior column for architectural reason at nagbabago lang ang no. o size ng bakal depende sa load na dadalhin. Ang interior columns mas malaki ang load kaya mas malaki o marami ang bakal. Kung 2 floors lang, pwede na yung required min size ng column ayon sa bldg official o architect.
😱😍😅🐕
Magandang araw po Sir,magtatanong lang po ako Sir,halimbawa po ang bahay ay 2 storey sya.tapos slub po ang bubong.
Thanks for watching 😊 okay nan po yun 2 storey with deck
Sir, tanong lang po kung ano po yung mas mauna dapat? Magpapatambak ng lupa or mag hukay muna? Thank u po. New subscriber here.
Thanks for watching 😊👍 hukay muna po, magposte then mag wall saka magtambak po, please watch our other videos regarding Construction thanks again 😊
Sir paano ang combined footing kapag meron na naunang footing at poste, bale may itatabi kameng bagong poste after 5years.
Engr. ano pong size ng lateral ties niyo po at ano ang finished concrete size ng column, salamat
Engr.alin ang mas makatipid bakal o kahoy .salamat po
Thanks for watching 😊👍 bakal
Boss ano po ang mix ratio po g buhos
hi sir good day po! pwede po mag pa spec ng poste / beam / and slab/ sa 4m x 10m 2 storey house with roof deck! thanks more power and god bless you!
Engr. ilang cm po ang pagitan ng bawat poste po for 2 storey with 800x1400cm na sukat ng lupa?salamat engr.
Good day Engr.! Ask ko lng Kung ano po mauuna gawin sa pagpapagawa ng bahay..? Medyo malin kasi ung lote nabili. Patambakan po ba or pwedi rin tambakan pagkatapos maghukay ng mga poste?
Unahin po muna poste, then tambak po
Engr. Ilang poste Po 5x5 sqm 2 storey house. Kapag 16mm po Ang bakal sa poste ano Po maximum distance. May napanood Po kasi Ako apat lang na poste sa 5x5 2 storey house.
Engr ask ko lang po kailan pede tamabakan ang footing after po buhusan ng concreto? salamat po
Salamat po sa panonood 👍, 2 to 3days okay lng po
New subscriber po🙂Sir ano po ba ang height ng footing para sa 4storey house at mga bakal po na gagamitin sa footing at poste.
Sir pwede ba wall footing instead of tie beam . Then after chb tie beam
Thanks for watching, yes pwede naman po, wag lang dun sa sobrang lambot n lupa
Ano po ang tamang sukat ng footing.laki ng poste at mga biga po nya?sana po ay mabigyan nyo po ako ng idea.sa mga katanungan ko po.salamat po
Normally pag ganyan 1.5 meters to 2meters lalim ng mga footings depends po yan kung malambot ang soil sa lugar nyo
At yung size po ng bakal sa footing.at poste at biga po.
bakit po walang top bar ang footing eh may moment reaction din ang top part ng footing?
Hi Sir baka need nyo draftsman 😊 Kahit sideline lang Thank you 😊🙏
Kuya gaano ba kalaki Ang poste para sa 2nd floor standard na laki pls
Depends po sa layo ng poste sa bawat isa at load na dadalhin po
Thank Engineer . Curious lang po, bakit po combined footing ang ginawa?
Thanks for watching 😊👍 Sir, pag magkadikit ang poste combined footing n ang gingawa
mga ce, ano pong purpose ng gravel bedding sa ilalim ng parilya?
Doon po sa first video ang explanation sir
Is this 2 storey residential building?
Engineer Kong bungalow ang bay anong laki ng bakal sa poste
Bakit po di nakagitna sa footing Ang poste? Ano dahilan bakit Ganon po Ang pag kagawa? Yan po ba Ang isolated na tinatawag? Salamat po
okay lang po ba yan kahit walang hulma ang pag buhos sa footing?
Yes po, sukat na po yun
Sir tanong lang po ako kung ok lng ba na 10mm at 12mm lng gagamitin s tiebeam at poste ng bahay na bunggalow sir
Thanks for watching 😊👍
Yes pwede
Salamat sir
Hello po Sir! Tanong ko po kung ilang storey yung ni-cconstruct po natin sa video po na ito bakit po 6-16mm ang naging design po ng ating poste Sir? Thank you po! 😊
3 storey with roof deck
Tanong ko lng po sir
Ano po dapat gawin kung ung poste po sa 2nd floor eh maiksi po .. ...
Salamat po sir
Thanks for watching 😊👍
Pwedeng dagdagan po kung ok naman ang mga bakal nya sa loob
Sir sa bonggalo lng po ano dapat sukat ng lalim ng poste
Thanks for watching, kung malambot soil more than 2 Feet para safe
Salamat sir
Magandang araw Engr. Tanong ko lang magkano bigay mo skilled at labor mo pag arawan?
Thanks for watching 😊👍 Sir
Sugon po sa galing ng workers, me 400, 500, 550, 600, 700 750 thanks
Oks. Thanks for responding sir. Looking forward sa nex vlogs mo until completion ng project. 🙂
@@markbryandegracia762 please share the video
Sir ilang lalim po dapat ang poste ng pagpapatayo nv bahay? Salamat po
Thanks for watching 😊👍 Sir,. Depends po kung ilang storey yung house, dun po naka base yung lalim ng mga poste
ilan po ang sukat ng anilyo?
Gaaano po kalalim yun at ang timpla ng cement?
Thanks for watching 1.5m po lalim
Thank you po
Engineer new subscriber po Ako. Tanong kolang po bakit po Hindi po kayo nag lagay nang base board para sa footing?
matigas po yung lupa.. yung na poa ng ginamit naming pamporma
@@THEHOWSOFCONSTRUCTION engineer 2nd question po needed pa po bang mag lagay nang vapor barrier sa mga footing po?
Pwede Po ba 12mm 6pcs 3toris
no
sir, if 12x12 ang column ko ano dapat ang sa beam?
depends po sa load nyo ng 2nd floor po
sabi daw eh humihina ang tibay ng semento kapag derekta sa lupa,,,kase daw eh sinisipsip ng lupa ang tubig na pinanghalo sa semento...totoo po ba to???
Konti lng po nasisipsip, pero kung matígas n po buhos matibay na po yun, depends po sa situation din thanks 😊
Sir, ilang araw pwede tambakan after buhusan ang footing?
Thanks for watching 😊👍
3 days po pwede n
@@THEHOWSOFCONSTRUCTION salamat sir always watching po!
In what Province do you build houses?
Depends on project Sir, where's your province?
@@THEHOWSOFCONSTRUCTION Mabalacat Pampanga
Is that a house or a resort po?
Sir good day!
Tanong po about sa poste.
Ang aming bahay ngayon na bungalo e may 6 na poste.
Nagbabalak po kami palagyan ng 2nd to 3rd floor.
Ang problema po e 4 na bakal lang ang nakikita ko sa bawat poste kasi meron posya abang.
Paano po kaya ito?
Thanks for watching 😊👍, kung 16mm, medyo okay pa, pero kung 12mm, negative po yun... At gaano po b ang area ng house? Ty
@@THEHOWSOFCONSTRUCTION dko po sure kung 16 or 12mm yung bakal.
Yung size po bahay e approx 33 sq m.
Plano ko na po kasi palagyan ng 2nd floor yung bahay.
Pki pm n lng po me
Pki pa check po muna mga steel bars at dimensions ng poste
Why dig so deep if concrete isn’t going to fill the depth of the dig?
one digs deeper than the planned level of footing for 2 reasons: 1) To remove the undesirable soil underneath ( e.g. clay, silt, organic matrl) and replace them with soil of better properties, and 2) To adjust the particular footing to a lower level having greater bearing capacity
wala man lang formworks o shuttering
Where are all my comments.
You deleted all.
Please keep my comments for reference.
To see whatever I said is correct.
Keep your post more interesting with my comments, for learning, improvements and cost savings.
Thank you so much Sir, this is nice, we really appreciate it... God Bless you Sir
Tu po again
Engineer Ronald, tumatanggap po ba kayo ng residential construction projects sa Antipolo? if yes, how can we reach out to you po? can we ask for your email address or mobile phone number? thank you