Simex ART - The Asphalt Repair Technology

Поделиться
HTML-код
  • Опубликовано: 20 окт 2024
  • Simex decided to develop a technology that can be used for the restoration of road surfaces, with a depth varying between 5 and 7 cm.
    A cutting-edge technology that would not require milled material to be removed or virgin HMA (Hot Mix Asphalt) to be added, but which could use only the existing material available on site.
    A technology that would not totally disrupt traffic flow and that would ensure immediate road drivability after its restoration.
    It also needed to ensure it would last for a reasonable amount of time, to allow local authorities to plan road maintenance, with significant benefits in terms of road user safety.

Комментарии •