Sir, To fill out oee sheet for a part with extensive operations, such as a flange, involving blanking, piercing, flattening, etc., for example, if there are seven operations to take the part to its final state: 1. **Operation 1:** Blanking tool 2. **Operation 2:** Piercing tool 3. **Operation 3:** Flattening tool (Continue this pattern for operations 4 to 7, specifying the tools or processes used in each step.
how you calculated Std cycle time ?
whether it is in seconds /minutes?
By Time - Study.. It can be in any unit
Sir,
To fill out oee sheet for a part with extensive operations, such as a flange, involving blanking, piercing, flattening, etc., for example, if there are seven operations to take the part to its final state:
1. **Operation 1:** Blanking tool
2. **Operation 2:** Piercing tool
3. **Operation 3:** Flattening tool
(Continue this pattern for operations 4 to 7, specifying the tools or processes used in each step.
Production to be entered separately for each stage tool
and what if i want production in daily report as well as in product wise report is it possible ?
@@aytindia
Sir L row m kya liya h aapna, vo samjh nhi aaya
ek baar dobara dekho
Sir hide hai L coulm
sir wire and cable ka formet sir
Sir ye excell sheet kaise banaye?
Pl check : - bzxqj.courses.store/472145?Dother%26Dtutor-course-referral%26Dcourse-overview-webapp
Interested in this Excel sheet
Daily Rejection Rework Sheet, COPQ and Red Bin Analysis - Download All Formats : tinyurl.com/2rb5h4ap
can i get this xls sheet
Pl Checkk : bzxqj.courses.store/234727?Dother%26Dtutor-course-referral%26Dcourse-overview-webapp
Dear sir please give this sheet
Pl check : bzxqj.courses.store/234727?Dother%26Dtutor-course-referral%26Dcourse-overview-webapp