EV Charging Points required for new construction projects: The new Part S

Поделиться
HTML-код
  • Опубликовано: 11 сен 2024

Комментарии • 4

  • @danielhodgkinson7937
    @danielhodgkinson7937 2 года назад +3

    This is a fantastic RUclips Channel to keep up with the latest Building Regs! Subscribed without hesitation

  • @cycaine
    @cycaine Год назад

    by charge points I am assuming your referring to Level 2 What if Level 3 is applied?

  • @peterbaker1932
    @peterbaker1932 2 года назад

    What is meant by cable routing, also if you have two associated parking areas to one dwelling, how many chatting points, are required.

    • @chitpaul
      @chitpaul Год назад

      Think cable routes are for future additional vehicle charging point.. looking ahead.