HOW NOT TO BACKFILL A NEW FOUNDATION!!

Поделиться
HTML-код
  • Опубликовано: 18 июн 2023
  • In today’s video, We backfill and hook up a new twin home.
    Visit our website: www.gmoutdoorservices.com
    To Grow your business click one of the two links below👇🏼
    gmoutdoorservices.myshopify.com/
    go.getjobber.com/gmoutdoor
  • РазвлеченияРазвлечения

Комментарии • 19

  • @mikkoliehu6466
    @mikkoliehu6466 3 месяца назад +1

    We have engon rototilt couplers every digging machines here... and levelling buckets... no need skid steer ...

  • @Yeti573
    @Yeti573 Год назад

    Why the block foundation over a concrete foundation? Curious...

  • @northeasterndirtandpropert7974

    Beautiful ground,easy on machines too.

  • @Raydubbs90
    @Raydubbs90 Год назад +3

    What kind of buckets are those? Those the normal 1 use or is there others with teeths

    • @Chris7171711
      @Chris7171711 Год назад

      They are Sand buckets. Majority of contractors use them up in MN because of the soil type and less of a need for tooth buckets

  • @danlarkin460
    @danlarkin460 Год назад

    Kabuta best machines out there turn the key

  • @brianmatthew2357
    @brianmatthew2357 Год назад +3

    Hey Garret, i love your video’s and support your channel 100% but this video you dont have any appearance of a compactor or any compaction, why is that? And did you run footing drain pipe and where are the roof drain pipes? Maybe I’m missing something being from CT but im just curious! Keep up the great content brother! 👍🏼

    • @GarrettWilliams2017
      @GarrettWilliams2017  Год назад +2

      This site is bottomless sand so the city doesn’t require any tile around the foundation. For compaction little is needed since it’s all good sand & majority of the inside is virgin ground. We do compact the edges with a jumpin jack with caution cuz these block foundations are rather fragile

    • @onjofilms
      @onjofilms Год назад

      @@GarrettWilliams2017 That's why you should backfill after the floor is installed.

    • @Jake25755
      @Jake25755 Год назад +2

      how would one backfill after the floor is poured??

    • @TheAefril
      @TheAefril 6 месяцев назад

      ​@@Jake25755He is talking about Backfilling after the slab is poured on the external perimeter only. The internal back fill will support the slab over the top, forming the internal floor.

  • @joshuathompson4802
    @joshuathompson4802 Год назад +1

    hey garret I was just wondering why u use those buckets over the conventional ones
    Thanks love the videos

  • @Jack-1212
    @Jack-1212 Год назад +1

    No compaction?

  • @evergreen7889
    @evergreen7889 Год назад +1

    Bobcat e145 how is it

    • @GarrettWilliams2017
      @GarrettWilliams2017  Год назад +1

      1800 hours been great!

    • @evergreen7889
      @evergreen7889 Год назад +1

      @@GarrettWilliams2017 we have a daewoo 175.. looking to get a machine that’s tad smaller yet can clear, dig basements, do demo and put in some storm drain.. I’m assuming a bobcat is a doosan ?

    • @GarrettWilliams2017
      @GarrettWilliams2017  Год назад

      @@evergreen7889 yes. We do all that with our 145.

  • @martyjohnson5453
    @martyjohnson5453 Год назад +1

    What was the bid for this?