How to wire a timer switch into a DIN rail distribution board (South Africa)

Поделиться
HTML-код
  • Опубликовано: 2 фев 2025

Комментарии • 20

  • @probhatbala2525
    @probhatbala2525 Месяц назад

    Very nice explain

  • @ernestcele2071
    @ernestcele2071 Год назад

    Excellent video, great help. Thank you 😊

  • @obioraobi1942
    @obioraobi1942 Год назад +2

    2:58
    I can't find the video to learn how to connect the normally open and normally closed timer 😢

  • @henryrossouw930
    @henryrossouw930 4 месяца назад

    Thanks a lot for this video. I have the same timer as the second one you connected. I suppose I can use it for my geyser, cause it states 21A Resistive and 10A Inductive or am I wrong.I really enjoy your videos and subscribed ages ago. Greetings from Wellington , Western Cape

  • @davidbrits2432
    @davidbrits2432 Год назад

    Ok how would you wire one of these geyser timers in with a Load Control relay between geyser and stove?

  • @elliotndlovu556
    @elliotndlovu556 2 года назад +1

    Very helpful

  • @bonganiedwardmthethwa6455
    @bonganiedwardmthethwa6455 2 года назад

    Hi, thank you for the excellent video. I just need to know if, can I use one time to run two geysers?

  • @robinhlatshwayo1591
    @robinhlatshwayo1591 Год назад

    Can you use the 1.5mm cable for stove also as long as you have put it to its on circuit breaker?

  • @steveenslin3842
    @steveenslin3842 3 года назад

    Hi. If I run a second DB board i a lapa from the home DB I am doing it from a 25 Amp breaker in house main DB to 60amp 5 breaker DB in Lapa. But I think this is not correct as my jacuzzi 32 amp breaker trips and gets hot when 4kw heater kicks in. What coule be reason for overheating. When i disconnect the heater there is no heat to the breaker and it runs fine

  • @MrRooskiRu
    @MrRooskiRu Год назад

    I want to install a timer that stops all mains power to the system during the day, but allows at night. My solar produces enough electricity during the day, but I want to set this to SUB priority and switch to mains from 10pm to 5am so I can run the geyser on mains at 4am and on sun during the day.

  • @geniusmarcsays2434
    @geniusmarcsays2434 7 месяцев назад

    when you say 4 mm, are you saying the diameter or area? like 4 mm square?

    • @ecologicaltime
      @ecologicaltime  7 месяцев назад

      usually when you order wire we just say the number not squared but yes technically its squared.

  • @geniusmarcsays2434
    @geniusmarcsays2434 7 месяцев назад

    NC normally closed means after the time delay ends this connection will turn off cause it becomes open
    and NO gets connected after time delay ends

  • @nathimngadi764
    @nathimngadi764 2 года назад

    💚💙💜♥️💙🍻

  • @derrickmorris4801
    @derrickmorris4801 2 года назад

    How do u put it on bypass

  • @senzocele7036
    @senzocele7036 2 года назад

    How to connect more than 1 circuit breaker on timer

  • @tshupetsomonedi
    @tshupetsomonedi 2 года назад

    Can you show how to wire a timer on a double pole breaker? 🥴🥴 I bought a timer now I don't know how to install it.