Hey man this was so helpfull thank you so mucho I really appreciate it , I don´t know what I had done if I wouldn´t have finded out your channel Keep it up :)
Hi. Thanks for sharing this video. Great! I have a question about ARENA: is it possible to use different times in the same resource? For example, I have 3 types of trucks arriving at the same time and they have to be weighed on the same scale. Truck A is weighed in 03 minutes, truck B is weighed in 05 minutes and truck C is weighed in 7 minutes. After weighing, they are released and the process is closed. So, how to build this model in ARENA? Could you help me? Thank you in advance.
Hello. I have been watching your videos and I was wondering if you could help me with a model I am working on. I want to simulate a production line that has different products. First, it should produce 2 batches of 50 dolls. Once the dolls are finished it should proceed to 3 batches of 10 trucks and at the end 4 batches of 5 balls. It should be produced in that orden strictly, so its kind of a production order. I was thinking i should use variables arrays but I am not sure how the create module can manage that. Thanks for your help
Thank you sir
I've been using this video for multiple projects.
c'est tres utile.
Thank you for this, very informative and helped a lot
can we use Pickstation instead of the Decide module?
Hey man this was so helpfull thank you so mucho I really appreciate it , I don´t know what I had done if I wouldn´t have finded out your channel Keep it up :)
I wonder if you are willing to answer questions about arena sumulation
thank you very much ...I have a doctor doesn't make anything sens like you in using Arena
thank you very much teacher. you're very funny
Hi. Thanks for sharing this video. Great!
I have a question about ARENA: is it possible to use different times in the same resource? For example, I have 3 types of trucks arriving at the same time and they have to be weighed on the same scale. Truck A is weighed in 03 minutes, truck B is weighed in 05 minutes and truck C is weighed in 7 minutes. After weighing, they are released and the process is closed. So, how to build this model in ARENA? Could you help me? Thank you in advance.
much arena
such wow
hey, which version of Arena is that? mine just have basic process. Do i have to buy it to have both advanced process and transfer?
Go to File>Template Panel> Attach and select your desired template
Hello. I have been watching your videos and I was wondering if you could help me with a model I am working on. I want to simulate a production line that has different products. First, it should produce 2 batches of 50 dolls. Once the dolls are finished it should proceed to 3 batches of 10 trucks and at the end 4 batches of 5 balls. It should be produced in that orden strictly, so its kind of a production order. I was thinking i should use variables arrays but I am not sure how the create module can manage that. Thanks for your help
can you do a rotunda?
Hey buddy, could you send me the model as doe extension , appreciate it