JLA Site: 2nd Floor Started; Exchange Site: 2nd Floor Posted. Late June Updates.
HTML-код
- Опубликовано: 7 фев 2025
- The former Joe Louis Arena Site has started the second floor of the first structure under construction. The Site will have two high rises: an apartment building & office tower. And The Exchange has posted the second (15th) floor, working from the top down.