Dr. Diabolical's Cliffhanger Construction Update

Поделиться
HTML-код
  • Опубликовано: 11 сен 2024
  • Make sure to SUBSCRIBE for more Texas theme park-related videos just like this one coming out EVERY SINGLE WEEK!!
    ---------------------------------------------------------------------------------------------------------------------------------------------------------------
    Instagram: @ThemeParkUpdateYT
    ---------------------------------------------------------------------------------------------------------------------------------------------------------------
    CREDITS
    Video:
    I Keep Watermarks On All Videos I Use
    Music (Chronological Order)
    I Don't Own Any Music Played In The Background Of This Video
    ---------------------------------------------------------------------------------------------------------------------------------------------------------------
    Camera Equipment:
    Main Camera | iPhone 11pro
    GoPro | GoPro Hero 3+
    Glasses | OHO Sunshine Camera Glasses

Комментарии • 26

  • @kitej1
    @kitej1 2 года назад +2

    Now this coaster is becoming a reality and not just a plan, It’s crazy how massive this beast of a coaster it is. Once she is complete I’m ready for test runs and rides. So hyped and thank you for sharing when I can’t visit the park.

  • @elevatoralarmcoasterandarc1214
    @elevatoralarmcoasterandarc1214 2 года назад +2

    The highest point has been topped off!

  • @F7PRO37
    @F7PRO37 2 года назад +2

    It’s a race between magic mountains raptor and dr diabolical which will be completed first

    • @troyvsc
      @troyvsc 2 года назад +1

      If i was a betting man I would bet on SFFT's coaster. SFMM seems to have delaying issues with their coasters.

    • @darthvader5532
      @darthvader5532 2 года назад

      @@troyvsc right, since Flight Of Courage is being assembled "backwards" the track pieces that need to be assembled aren't done yet. The ride was designed to be constructed from the leading que towards the back turn around. They can assemble this way, but it would mean closing Riddler for several weeks due to the crane having to sit on its entry plaza.
      By building the turnaround section first, they can keep the crane inside the construction zone without closing more rides. Once the last few pieces of track are delivered, they can get that turnaround section assembled and full assembly will be done in about 5 weeks.

    • @weedle4736
      @weedle4736 2 года назад

      the fact that MM has been clearing the land for WWFOC since 2020 just shows how slow they are. Even a newly announced Dive coaster has already completed the lift and drop.

  • @theguywholikesturtlez
    @theguywholikesturtlez 2 года назад +2

    Heading to fiesta this Saturday. Think it'll be busy?

    • @ThemeParkUpdate
      @ThemeParkUpdate  2 года назад +2

      It shouldn't be. It'll be relatively cold and this is a pretty dead part of the year

    • @theguywholikesturtlez
      @theguywholikesturtlez 2 года назад

      @@ThemeParkUpdate I tried going today around 2 15 but fiesta closed early. Gonna try to go tomorrow if it's open it shouldn't be raining or as cold

  • @FroszyHd
    @FroszyHd 2 года назад

    Let's gooooo

  • @StrangeSwag
    @StrangeSwag 2 года назад

    Great to see the progress!
    also great operations last weekend on the Iron Rattler! the team before you was on single train ops and the line was getting very long! also the queue loved your joke about their tiktok followers not being worth getting kicked out of the park lol

    • @ThemeParkUpdate
      @ThemeParkUpdate  2 года назад +1

      Ayyy thank you! Yeah single train ops always suck. I don't think anyone like them, not us, not y'all, not maintenance. But whenever it happens it basically a choice of either the ride is closed, or we run 1 train. Usually though with iron rattle, they want it with 2 trains as much as possible so if there’s an issue with the other train, they’ll do everything in their power to get it back on midway through the day. But that’s not us ride operators decision. It wasn’t me getting up there and wanting to run 2 trains, i just had good timing lol

    • @StrangeSwag
      @StrangeSwag 2 года назад

      @@ThemeParkUpdate yeah i was in line hearing a woman directing the operations initially then they said they were adding a second train! i was super happy to hear that, then by the time i got to the station (from the bottom of the line) i think you had just started operating for the day!
      it was a great day and Diabolical is coming along super fast!

  • @joshharris3282
    @joshharris3282 2 года назад

    Great video, awesome footage !!

  • @darrylellis4809
    @darrylellis4809 2 года назад +1

    This coaster looks good but I am assuming you haven’t seen Yukon striker witch absolutely dwarfs this in size and comparison. I really wish SFFT went a bit taller and just made it a even 200 feet.

    • @ThemeParkUpdate
      @ThemeParkUpdate  2 года назад

      Nah I definitely know of that ride. I followed the construction for it and have ridden all the other dives in north america

    • @darrylellis4809
      @darrylellis4809 2 года назад

      @@ThemeParkUpdate Oh ok cool that’s what’s up but in my opinion I think they could have done a bit better as far as the stats are concerned. Iam sure nobody wouldn’t have been against it being at bit taller or longer. Just like you I have been on every dive machine as well especially Youkon Strker to me this just comes of a little underwhelming.

    • @ThemeParkUpdate
      @ThemeParkUpdate  2 года назад

      @@darrylellis4809 yeah but like....money.

    • @darrylellis4809
      @darrylellis4809 2 года назад

      @@ThemeParkUpdate I am sure it wouldn’t have been that much to add a extra 50 feet of track but this is six flags we are talking about. Lol King of cheap investments

    • @ThemeParkUpdate
      @ThemeParkUpdate  2 года назад

      @@darrylellis4809 50 feet would've changed the layout as they would need to add height to every element on the ride. With that, it’d most likely be upward of 5 million extra, not taking into account the fact that they don't have the space. This ride was already over 15 million so likeee... It's not six flags being cheap, just them being smart :)

  • @rescue84
    @rescue84 2 года назад +1

    When do you think it will be done?

    • @Fllackito
      @Fllackito 2 года назад +1

      by march 11 - 20

  • @livebaitlarry5783
    @livebaitlarry5783 2 года назад

    im going tomorrow and im gonna wait across the street until its done so i can be first to ride. i have the flash pass already. i bought it for 25 usd. online. a question. did they use rct 3 to design this?

    • @ThemeParkUpdate
      @ThemeParkUpdate  2 года назад

      😂😂💀

    • @darthvader5532
      @darthvader5532 2 года назад

      No bud, they use a more complex software program for the design process. You sound really excited to ride it though, that's good, it'll be open in a few more months.