Nutec Home Build - Building the roof

Поделиться
HTML-код
  • Опубликовано: 4 фев 2025

Комментарии • 33

  • @elimdutoit9526
    @elimdutoit9526 2 года назад +1

    Very nice!!!

  • @andrethiart17
    @andrethiart17  10 месяцев назад +1

    The best way to regulate the temperatures is by the insulation you use, it is best to use at least 100mm or thicker, we have also installed an aircon that can cool and heat for extra comfort

  • @shirmza5071
    @shirmza5071 2 года назад +1

    Looks great neatly done

    • @andrethiart17
      @andrethiart17  2 года назад

      we will have 2 videos in a week soon but with an Q&A session that should not be missed, i expand on lessons learned......

  • @ngj874
    @ngj874 11 месяцев назад

    Which area do you cover? We are looking at building a nutec home in simons town, Cape Town

  • @jasonireland7893
    @jasonireland7893 Год назад

    Hi. How are the frames bolted to the concrete slab.

    • @andrethiart17
      @andrethiart17  10 месяцев назад +1

      as an afterthought it would have been better to have the bolts embedded in the centre of drying concrete blocks, once dried bottom wood of frame gets marked to fit and holes drilled to allow completed frame to fit over and bolted on

  • @warrenadams3448
    @warrenadams3448 11 месяцев назад

    Is nutec house very hot in summer and very cold in winter

    • @Luqman899
      @Luqman899 9 месяцев назад +1

      It must be insulated properly otherwise it will be

  • @carolinejeanallincarolj
    @carolinejeanallincarolj Год назад

    Hi Andre it's looking beautiful, still looking for land, it's so expensive here, I will not let go of my little home, it's going to be fabulous when it's done, I would love a bay window, in mine too, it's so english please

  • @everydaysamiracle
    @everydaysamiracle Год назад

    How does the inside layoit look?

    • @andrethiart17
      @andrethiart17  10 месяцев назад

      Busy with a recap video how it looked like before till completion and lessons learned

  • @shamgaming8002
    @shamgaming8002 Год назад

    Everite Nutec boards? Wendy planks?

    • @andrethiart17
      @andrethiart17  10 месяцев назад

      Nutec Planks there is different suppliers for the Nutec, I seen a few places where wood planks if not properly maintained every year rots away

  • @carolinejeanallincarolj
    @carolinejeanallincarolj Год назад +1

    Looks beautiful, how long would it take for a 1 bed cottage and how much Andre?

    • @andrethiart17
      @andrethiart17  10 месяцев назад

      It took the brick layers 2 days to do the base and wall reinforcements, better option than poles or bricks for me, left to cure for a few days then did the floor concrete left to cure, walls up in a day, build completed in a week, finishes and electrical and plumbing to overlap, should be able to have everything done in 3 - 4 weeks if equipment, labor, plum and elect has been properly managed, and which finishes is needed

  • @andriesmaritz2055
    @andriesmaritz2055 2 года назад

    Have you build a house in Hermanus area, I know someone there who wants to have a look at your work and discus pricing, etc. with you.
    Are all your materials SABS approved. I looked at your video on the wooden framework and am concerned about the wood used as it does not look too good. Is the wood treated and approved for dry rot, termites, water rot, etc ? Thanks & vriendelike groete.

    • @Luqman899
      @Luqman899 9 месяцев назад

      i can tell that the wood is treated pine which is typically used for house framing. however they did a poor job in this video, particularly around the doors and windows

  • @ElishaPienaar
    @ElishaPienaar Год назад

    Like this

  • @ReneDames
    @ReneDames 11 месяцев назад

    Andrè please I need help. Had contractor that build me rooms for my staff and left me sort of in lurch. I am using their staff to finish. I can not find the weber fibre reinforced for eps base coat to finish outside.

    • @andrethiart17
      @andrethiart17  10 месяцев назад

      Have you tried Build It, Builders Warehouse or Brights?

  • @buddymuhammed1568
    @buddymuhammed1568 2 года назад

    Is there a way to pay off

    • @andrethiart17
      @andrethiart17  2 года назад

      most companies require at least a 50 - 60 percent upfront payment part payment when at roof height and balance on completion

  • @carolinejeanallincarolj
    @carolinejeanallincarolj Год назад

    Wha😊ts this cottage then, a one bedroom or studio

    • @andrethiart17
      @andrethiart17  10 месяцев назад

      can even be called a bachelors flat, it is a open plan, bathroom is closed off but there is a small kitchen and bedroom. We just call it a studio to make it easier for the kids

  • @buddymuhammed1568
    @buddymuhammed1568 2 года назад

    I'm very interested

    • @andrethiart17
      @andrethiart17  2 года назад

      I will give more feedback over the next 2 weeks on who to use for the build and lessons learned

  • @Potstickers241
    @Potstickers241 2 года назад

    Do you need government permission to add an extension to your home ?

    • @remolakay7682
      @remolakay7682 2 года назад

      Could you please answer this question I'm also interested in building an addition to my house

    • @andrethiart17
      @andrethiart17  10 месяцев назад

      plans needs to be drawn up and send in for approval

  • @mornecasper7692
    @mornecasper7692 Год назад

    Hi

  • @xolisangingi7515
    @xolisangingi7515 2 года назад

    I need you gyz