FRENER REIFER ON SITE IONA Skydome, D

Поделиться
HTML-код
  • Опубликовано: 12 сен 2024
  • FRENER & REIFER was responsible for the technical development, design-engineering, fabrication and installation of the glass skydome for Meyer Werft.
    FRENER & REIFER Scope of work:
    • 970 m² steel/glass roof with an elliptical 41 x 29 m footprint
    • A mesh construction using hollow rectangular profiles
    • 340 double-glazing Panels
    • 170 of which are in differing Formats
    • Max. edge length of the double-glazing Panels 3 m
    • The roof weighs 105 tons
    • The Roof was lifted onto the ship in a single maneuver

Комментарии •