Tower Cranes Marriott HQ

Поделиться
HTML-код
  • Опубликовано: 11 дек 2024

Комментарии • 21

  • @alistairmacrae4870
    @alistairmacrae4870 2 года назад +1

    Not wishing to be a spoil sport, the guys with the hammers, if one of these hammers were to drop? The crane driver is something to behold.

  • @joenewman6939
    @joenewman6939 5 лет назад +3

    My hat goes out to you guys great job crane operator persition my friend

  • @flick22601
    @flick22601 5 лет назад +8

    I've seen thousands of these cranes in my life but, this is the first time I've seen how they're erected. How large is the concrete base and how long must it cure before they assemble the crane? Thanks for posting.

    • @JohnZWetmore
      @JohnZWetmore  5 лет назад +3

      I don't know the exact dimensions, but it is a pretty massive slab several feet thick. There is a photo in this blog post that shows the four mounting points for the north tower protruding from the middle of the slab. (Click on the photo for a larger version.) pedestrianadvocate.blogspot.com/2019/08/construction-in-bethesda-tower-cranes.html

    • @JohnZWetmore
      @JohnZWetmore  5 лет назад +5

      On another site they were pouring the foundation today (Wednesday) for a tower crane that will be erected Saturday. So they only needed a few days for the concrete to cure, even though it might take a bit longer to reach full strength.

  • @AM-dn4lk
    @AM-dn4lk Год назад +1

    So how did they assemble the other crane which lifted the components for this crane?

    • @JohnZWetmore
      @JohnZWetmore  Год назад +1

      They use a "small" crane to assemble the big crane, which assembles the tower crane. The rigging crew starts very early in the morning.

    • @avreve
      @avreve Месяц назад

      @@JohnZWetmoreand how do they assemble the small crane

    • @JohnZWetmore
      @JohnZWetmore  Месяц назад

      The smallest crane does not need to be assembled on site. It drives up ready to go.

  • @miguelainaga7658
    @miguelainaga7658 Год назад +1

    Todos mis respetos para esas personas,yo jamas me subiria a esas alturas

  • @bertferri-5685
    @bertferri-5685 Год назад +8

    Huge respect to these riggers. I get vertigo on a step stool reaching for the cereal box on the top shelf!😊

  • @ถุงเงินสามทองกล่ํา

    ก่อสร้างไรครับ

  • @XusenTurdaliev-u2o
    @XusenTurdaliev-u2o 2 месяца назад +1

    😮👍

  • @Ifantoys
    @Ifantoys Год назад

    Sungguh sangat luarbiasa...,dan saya merasa hormat kepada para pekerjanya yang sangat pandai sekali,salam dari Indonesia 🇮🇩🇮🇩🙏🙏

  • @gerardochacon1743
    @gerardochacon1743 Год назад +1

    Kiero montar una torre grua autoestable de espamex j 47 ns

  • @lrmuanpuia9929
    @lrmuanpuia9929 Год назад +1

    Fulll sport😮😮

  • @philcollins2289
    @philcollins2289 Год назад

    rien de compliqué 👏🇨🇵🖐️

  • @IsmaelVao
    @IsmaelVao 10 месяцев назад

    👏👏👏👍👍

  • @David-cv1vh
    @David-cv1vh 7 месяцев назад +2

    Great

  • @marcneville42
    @marcneville42 Год назад

    Los trabajadores: a sus cojones estan muy grande.