BAMTEC® - fastest rebar solution for renewable energy industry. Save time, deliver on time - is key

Поделиться
HTML-код
  • Опубликовано: 10 сен 2024
  • The exclusive partner of BAMTEC® for the British Isles, Hy-Ten Reinforcement, is supplying the reinforcement steel for the SeAH Wind’s, giant £300m, 40-metre-tall offshore turbine base factory at Teesside’s Freeport have received planning approval.
    The giant facility - the largest of its kind in the world, at over 800 m in length - presents a range of design and construction challenges including its scale, low energy design and an accelerated programme.
    It will offer 1.13million sq ft of high-quality factory space for the production of monopiles up to 120 m in length, 15.5 m in diameter and weighing 3,000tons which are used to support offshore wind turbines.
    In this video it is easy to see why BAMTEC® is used. For this small part of this big project, 100 tons (80 tons of BAMTEC®) were laid in 3.5 days with a maximum of 6 workers. If it had been reinforced with loose bars, it would have taken about 2 weeks.
    Until the overall completion of this factory, anticipated for 2024, several thousands of ton of BAMTEC® will be installed.
    BAMTEC supplier: HY-TEN
    www.hy-ten.co.uk
    More infos: www.bamtec.com
    Questions: mj@bamtec.ch

Комментарии •