A step-by-step installation guide for the Warmup DCM-PRO System

Поделиться
HTML-код
  • Опубликовано: 28 сен 2024
  • Follow Us For More
    🔔 Instagram: www.instagram....
    🔔 Facebook: / warmupuk
    🔔 LinkedIn: / warmup-plc
    💡 In This Video
    This video is a step-by-step guide for a fast and easy installation of the Warmup DCM-PRO heated decoupling system.
    1. Prepare floor surface, if installing directly on the subfloor sweep away any dust and ensure surface is clear and dry. Optional: installing insulation boards on the subfloor will improve performance.
    2. Install perimeter strip around the perimeter of the room. Cut mat to size, peel off the backing in one corner and tack in place, remove backing completely and press down once properly aligned.
    3. Test the resistance of the heater ensuring it is within the correct resistance band range.
    4. Install the heating cable at the chosen spacing, minimum 60mm. Maintain a perimeter spacing of half of the chosen cable spacing.
    5. Channel a groove in the mat and subfloor for the cold tail & termination joints, enabling them to fit flush with the top of the mat.
    6. Install the floor sensor centrally between two runs of the heater. Test the resistance of the heating cable after installation and check against the previous value to ensure no damage has occurred.
    7. The chosen floor covering can now be laid onto the system. For tiles, cover the system directly with tile adhesive and tile over.
    8. Alternatively, self-levelling compound can be poured directly onto the system and then covered with the floor finish of choice. The heater, including its joints, must be wholly within the adhesive or self-levelling compound and not exposed.
    9. Finally, test the resistance of the heating cable against previous values to ensure no damage has occurred. The DCM-PRO System can now be connected to the chosen thermostat.
    Learn more about the product here: www.warmup.co.u...
    #warmup #warmupplc #dcm #dcmpro #underfloorheating #ufh

Комментарии • 2

  • @choochie4
    @choochie4 2 года назад

    Can you give details of the screws used at 2:13 for screwing down the insulation boards as this is not mentioned in the DCM-PRO Installation manual .

  • @jvh6061
    @jvh6061 Год назад

    there is no 24/7 helpline. they need to change that. it's frustrating.it's upsetting