    Hii Ray. I am happy to share with you that I have been passed my PMP in my 1st attempt today

    • @PMPwithRay
      @PMPwithRay  2 года назад

      Hello Chandan, Many many congratulations for achieving this milestone in your career! It is all because of your hard work & dedication...enjoy the achievement! Welcome to the club...
      Please share my RUclips channel and my 330-Q Udemy mock within your network & peer group! That's the only way I can reach out to more potential PMP aspirants like you!...and help them achieve success... if you had taken my UDEMY course and found it helpful, it would be wonderful if you can provide a 5/5 rating & write a nice review for it…honestly, it would mean the world to me 😊
      Wish you all the best in your career ahead...which I am sure will scale new heights now with PMP!!!
      I am really happy that I was a part of your journey for PMP... 😊
      All the best, stay well...
      Best,
      Ray

  • @monicadenise6274
    @monicadenise6274 4 года назад +6

    Excellent!! I can finally see the light at the end of the tunnel, thank you very much for sharing!!

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad you enjoyed it...thanks for watching & commenting!

  • @hendrycharles.a8979
    @hendrycharles.a8979 4 года назад +1

    Hi Ray,
    I passed PMP exam last week, I happen to see your vidoes two months back, the solving of situational questions is a masterpiece of yours!. I have seen all of your videos. thank you very much.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi Hendry. Big big congratulations for this wonderful achievement! I am happy for your success! :)

  • @monicahali969
    @monicahali969 3 года назад +1

    Your videos were indeed helpful, cleared my pmp in the first attempt.. within 45 days..

    • @PMPwithRay
      @PMPwithRay  3 года назад +1

      Hi Monica,
      Many many congratulations for achieving this milestone in your career! It is all because of your hard work & dedication...enjoy the achievement! Welcome to the club...
      Please refer to my RUclips channel, website (pmpwithray.com) and my 200-Q Udemy mock within your network & peer group! That's the only way I can reach out to more potential PMP aspirants like you!...and help them achieve success...
      Wish you all the best in your career ahead...which I am sure will scale new heights now with PMP!!!
      I am really happy that I was a part of your journey for PMP....
      All the best, stay well...
      Best,
      Ray

  • @ganteo
    @ganteo 4 года назад +3

    Thanks Ray! Appreciate your video and help. I was struggling with situational questions, but your advice helped greatly. I also did your 200 Qs from Udemy. I passed my PMP exam last week from 1st attempt. Thanks again and good luck!

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Thank you Azamat. Big congratulations! Pls leave a review on my Udemy course if you have liked it. Would mean a lot to me!

  • @kiranmashere2456
    @kiranmashere2456 3 года назад +1

    Hello ray
    Thanks for you tube channel today I cleared PMP exam with all AT

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Hi Kiran,
      Many many congratulations for achieving this milestone in your career! It is all because of your hard work & dedication...enjoy the achievement! Welcome to the club...
      Please refer to my RUclips channel, website (pmpwithray.com) and my 330-Q Udemy mock within your network & peer group! That's the only way I can reach out to more potential PMP aspirants like you!...and help them achieve success...It would be wonderful if you can provide a 5/5 rating & write a nice review for my Udemy course…of course if you have taken it & you feel it was worth it 😊
      Wish you all the best in your career ahead...which I am sure will scale new heights now with PMP!!!
      I am really happy that I was a part of your journey for PMP... 😊
      All the best, stay well...
      Best,
      Ray

  • @sumitmitra9144
    @sumitmitra9144 2 года назад +1

    Fantastic approach.. very articulate . Very methodical . Very logical

  • @chandankushwaha9510
    @chandankushwaha9510 2 года назад +1

    Thanks a lot your videos helps a lot to paas my exam .

    • @PMPwithRay
      @PMPwithRay  2 года назад

      Glad to hear that Chandan. Many congrats!

  • @Ammy-bc6bh
    @Ammy-bc6bh 3 года назад +1

    Thanks to share such a good technique to find out the correct answer. I will come back when i pass my exam. Thanks

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Thank you for watching & commenting!

  • @babusjohn
    @babusjohn Год назад +1

    Pls continue posting videos on this topic for remaining knowledge areas...its very useful...Thank you very much Ray

    • @PMPwithRay
      @PMPwithRay  Год назад

      Thank you Shanmugam for watching and commenting!

  • @ketkeedhare
    @ketkeedhare 2 года назад +1

    Quite helpful for understanding as well as applying to situations, thanks.

    • @PMPwithRay
      @PMPwithRay  2 года назад

      Glad it was helpful! Thank you for watching & commenting :)

  • @mouneshaddad7546
    @mouneshaddad7546 4 года назад +2

    Subscribed today and this is the 3rd video I’ve watched so far! It’s simply awesome! My exam is on December 21st! I’ll do my best...

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      All the best for your PMP Exam Mounes! Thank you for watching & commenting :)

    • @emadkhateeb5668
      @emadkhateeb5668 3 года назад

      Good luck please keep us informed, I like his videos as well.
      your exam must be today

    • @mouneshaddad7546
      @mouneshaddad7546 3 года назад

      @@emadkhateeb5668 Thank you for your kind encouraging words.. Actually I’ve delayed my exam till March due to my work requirements.. wish you all the best..

  • @TheEduCater
    @TheEduCater 4 года назад +1

    Insightful, helpful

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad it was helpful! Thanks for watching & commenting :)

  • @rbragausa
    @rbragausa 4 года назад +1

    I recently failed my exam, because I didn´t watch your video before. You´re amazing Ray! Please keep up with this good work.

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      I am sorry to hear that you were not able to clear the exam in your first attempt. But, don't worry...it is a difficult exam and we all agree to that. Watch my video on "Why people FAIL in the PMP Exam" to get a better understanding of your gaps and course correct accordingly.

  • @digitalravi
    @digitalravi 3 года назад +1

    Dear Ray, All your work are excellent - Thanks.
    Question#4 says "During the development phase of the project"
    with these words, I assumed that project is in execution phase and not in initiation phase and therefore opted Risk Register.
    Not sure, whether myself or question needs correction.

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Hello, 'development' phase means initiation. When something is 'developing'....it's getting initiated right?

    • @digitalravi
      @digitalravi 3 года назад +1

      @@PMPwithRay Thanks Ray

  • @ibrahimbabagana2020
    @ibrahimbabagana2020 4 года назад

    Please keep on making videos like this. You are a super hero. Indian tutors are the best in the world and other planets

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Thank you for your wonderful comment Ibrahim :)

  • @PMPwithRay
    @PMPwithRay  4 года назад

    Want to know how I passed my PMP Exam on the first attempt? Read my journey here: bit.ly/2Qsi9rs
    Ultimate Guide to solve situational questions in the PMP Exam: bit.ly/2QrCz3O

  • @joanasimoesc
    @joanasimoesc 11 месяцев назад

    Ray, another excellent and very helpful video from yours! I am watching all your videos for my PMP preparation study. I was lucky to find your youtube channel! Thank you very much :)

    • @PMPwithRay
      @PMPwithRay  11 месяцев назад

      Glad it was helpful! Thank you for watching and commenting!

  • @j96220
    @j96220 4 года назад +1

    Thank you for adjusting the font. These videos are very helpful to my study plan.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad you like them Jacqueline! Thanks for your comment.

  • @Neags
    @Neags 4 года назад +1

    Hi, I disagree with the wording and the answer in question 4 - it mentions during the development phase. Which I understand is the execution phase (i.e. Developing deliverables), it also mentions ('may' violate PII = i.e. Risk) which could mean risk register or charter. Can you clarify how you have linked it between initiation and planning? Thanks

    • @PMPwithRay
      @PMPwithRay  4 года назад

      There is nothing called 'developing deliverables' in PMBOK. Also, there is a difference between 'reviewing' and 'updating'. Hence Risk Register is not correct.

  • @revsjournal3110
    @revsjournal3110 4 года назад +2

    With reference to question number 3, you mentioned that we have to "document change request" and then proceed to analyze the impact on baseline..
    But what I understand is that we need to analyse the impact on baselines first coz, we need to check if the change can be managed by the PM or it need to go through the CCB.
    There are certain changes where there is an exception such as
    1) Before the baselines get updated, PM has full authority to make a change
    2) If it does not impact the baselines, then the PM can proceed to make the change
    In both the scenarios, we need to analyse first before we document the change request.. isn't it?
    Can you please clarify as to why you mention it otherwise? I have gone through the other video too and I am still confused

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi. Thank you for asking your doubt. Unfortunately, your understanding of ICC flow is not correct...may I know from were you got this understanding? Definitely not PMBOK or any standard text book? Are you using your own experience of doing projects to develop the flow? I need to know this before I clarify your doubt.

    • @revsjournal3110
      @revsjournal3110 4 года назад +1

      @@PMPwithRay : I learnt it in training and few mock test told me it was wrong

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Yes, I guessed it. See, for PMP, always think of answers in PMBOK way. I have explained the same in my videos as well. Don't bring external frameworks in your consideration, otherwise you will always end up choosing wrong answers...

  • @sangameshmannapur1063
    @sangameshmannapur1063 4 года назад +1

    Thank you for the crisp & clean explanation.

  • @babusjohn
    @babusjohn Год назад +1

    Superb Ray... very simple and clear. Great teacher you are. Keep up the good work. I am already watching an another authors udemy class where i have a bit issues with understanding his english as he is a native speaker. But your teaching is awesome and can be understood by anyone. If i would have seen your videos before i would have bought your course early. However I am gonna buy your udemy course soon

    • @PMPwithRay
      @PMPwithRay  Год назад

      You are welcome! I wish you all the very best for your pmp certification journey!

  • @pradeeplavania1772
    @pradeeplavania1772 4 года назад +1

    Fantastic, I'm about to appear in the test within three weeks from now. I realize how it easy to understand the criticality of the test by your UT session. I'm unfortunate to know about your UT so late. Thanks & Regads

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad it was helpful! I will come up with more videos soon! Thank you for watching & commenting! :)

  • @btagra
    @btagra 4 года назад +3

    Ray - This is Superb. I admire the way you've approached & listed down logical sequence to approach situational questions. Very unique and novel. keep up the good work

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      Hello! Thank you for watching & commenting. All the best for your PMP!

  • @nishithsheth7390
    @nishithsheth7390 3 года назад +1

    It is good if you make individual chapter video of the PMBOK guide. Till now I am very happy with the work you are doing. This is just the request if possible.

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Hello. Thank you for your suggestion. I will definitely keep it as my future video ideas.

  • @zealvert
    @zealvert 4 года назад +1

    Hello Ray. I have some doubts in question 2 of Integration management. According to me option D seems to be the right answer in the given scenario:
    Let's assume that the project manager approaches the Finance dept. directly, which is a usual exercise in real-life situations. But since answer C also states "...delay the project", it becomes invalid because the sponsor wants to close the project early; and the project manager cannot ignore the sponsor's early closure request, as long as the request is within the boundaries of business ethics (or unless the scenario would suggest that an early closure of the project is not viable).
    With answer C appearing invalid (based on what I just explained), the only valid choice the project manager is left with, is answer D.

    • @PMPwithRay
      @PMPwithRay  4 года назад +2

      Hi Zeal, option D is incorrect because it is not portraying the servant leadership & collaborative attitude of the PM. The sponsor is not the 'boss' of the project. You can always challenge the sponsor's request with the correct datapoints.

    • @sathish5722
      @sathish5722 3 года назад

      I believe in this situation there is no impact to the project baselines due to the delay. It seems only some paperwork pending with the vendor. So no problem to wait for the vendor to sort out the problem with the invoice and then formally close the project.

  • @ggchats1394
    @ggchats1394 4 года назад +1

    Hi Ray,
    Please clarify the answer for the second question.
    You are saying , correct answer is option 3, but in that it was mentioning -the delay the project closure till the issue is solved.
    Is it correct?

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Yes, that's correct. In this case, delaying the project closure does not impact your customer. For him, the project is already done. But, you need to sort this issue out with your supplier before you close the project formally...

  • @datamindz
    @datamindz 3 года назад +1

    4th video I am watching and I am really learning a lot and growing in confidence

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad it was helpful! Thank you for watching & commenting :)

  • @kurtmcmichael2045
    @kurtmcmichael2045 4 года назад +1

    Always learning. Just had my PMP application approved today.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Best of luck Kurt! All the best for your exam!

  • @srividhyabalaji3677
    @srividhyabalaji3677 Год назад +1

    Yes. Iam enjoying your sessions.

    • @PMPwithRay
      @PMPwithRay  Год назад

      Thank you for watching & commenting!

  • @paveljuly4835
    @paveljuly4835 4 года назад +1

    Hi, Ray. What app or site you recommend to practice in situational questions? Which from many of them are most similar to real exam?

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      Hi Pavel...The only questions I have found which replicate the difficulty level of PMP exam are the 200 set questions from PMI. I have one video on how to access those. Have a look. You can try PrepCast simulators as well...I heard they are good...

  • @odetteallen5744
    @odetteallen5744 3 года назад +1

    Hi --- very helpful!!! Thank you for the question and answer exercise. Please continue to share this format.

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Hi Odette.
      I am very happy to know that you are finding my RUclips videos helpful. I wish you all the very best for your PMP prep! Keep an eye on my RUclips channel for more upcoming tutorial videos (as per the new format of the PMP exam in 2021) and please share them within your network & peer group who are also preparing for the PMP exam…
      Take care,

  • @nazrulquader1533
    @nazrulquader1533 4 года назад +2

    The strategies are outstanding. But how we can do those analysis with in time frame , I guess in 1 min. Thank You Ray!

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      Hi Nazrul. You can do that by practice, practice and practice. The more questions you solve using this framework, the more natural it will become for you and the lesser time it will take!

  • @fryett67
    @fryett67 4 года назад +1

    Another excellent, informative video. I find your explanations clear and helpful.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad it was helpful! Thanks for your comment :)

  • @teresacowherd7113
    @teresacowherd7113 3 года назад +1

    Very good. Thank you so much. Your problem solving tips are extremely beneficial!

    • @PMPwithRay
      @PMPwithRay  3 года назад

      So glad to hear that Teresa. Please share with your peers.

  • @flaviaferlito8561
    @flaviaferlito8561 4 года назад +1

    HI ray, it is really useful!!however, I was confused when you talked about development project phase and in the question analysis it looks like it meant project initiating phase! I thought it meant executing, is this language / wording stated somewhere in PMBOK?or is that a common uderstanding?

    • @PMPwithRay
      @PMPwithRay  3 года назад +1

      Hello Flavia, it's a common understanding that anything 'developmental' means 'early stages' which links to initiation...

    • @flaviaferlito8561
      @flaviaferlito8561 3 года назад +1

      @@PMPwithRay thanks!

  • @walubadmus
    @walubadmus Год назад +1

    It's very informative. Thanks

    • @PMPwithRay
      @PMPwithRay  Год назад

      Glad it was helpful! Thank you for watching & commenting.

  • @srinivascheekati2660
    @srinivascheekati2660 4 года назад +1

    Very informative strategy step by step solving. Thanks Ray.

  • @Rozpc69
    @Rozpc69 4 года назад +2

    I'm totally enjoying your sessions. They are very clear...they actually have me very excited to continue with what I thought at first to be a very daunting task. Thank you and thank you 👍

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi Rosalind. Thank you for your wonderful comment! I am happy that you find the videos helpful for your PMP prep...:)

  • @akashawast
    @akashawast 3 года назад +1

    Question 2: option d seems a better choice than c. A project manager cant sit idle for vendor to re-submit claims and who knows how long will it gonna take. Its like you have everything done but still SPI will be less than 1 and so much to answer for this delay. On a lighter side - I would love to delay for resubmission than joining a new project.. Just for fun :-)

    • @akashawast
      @akashawast 3 года назад +1

      Thanks a lot for sharing these tips... change management flow chart.. It helped me like anything.

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Thank you for sharing your inputs! appreciate it :)

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad you found the video useful :)

  • @AshishThakur-gh9rr
    @AshishThakur-gh9rr Год назад +1

    thanku sir ,i enjoyed the way i connect the situation ,,, plse make more videos on situational based question ..thanking you

    • @PMPwithRay
      @PMPwithRay  Год назад

      Sure I will, stay tuned for more videos and Thank you Ashish for watching and commenting!

  • @neyazulhq
    @neyazulhq 3 года назад +1

    Thanks bro Ray for such knowledge sharing....

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad it was helpful! Thanks for watching & commenting!

  • @akpandaraanthony6261
    @akpandaraanthony6261 2 года назад +1

    Good expecting more

    • @PMPwithRay
      @PMPwithRay  2 года назад

      Sure 😊 Thank you for watching & commenting :)

  • @Babaconcon
    @Babaconcon 3 года назад +1

    Great explaination, Ray !

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad it was helpful! Thank you for watching & commenting :)

  • @diwoapp3611
    @diwoapp3611 3 года назад +1

    In question 4 you eliminated option B (risk register) because it is probably not yet done. In question 5, shouldn't the option B also be eliminated for the same reason, instead of your argument of not being inclusive? Am I right to think about it this way?

    • @PMPwithRay
      @PMPwithRay  3 года назад

      No. For Q4, risk register is primarily eliminated because you will not find PII guidelines in risk register....for Q5 it is eliminated because it's not a professional PM approach (blaming & fault finding)...

  • @LJMAndre
    @LJMAndre 4 года назад +1

    Hello Ray,
    Thanks for the video. Situational questions are not easy for me. Your strategy is really helping me in addressing them. Can we have more videos like this?

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi Andre, thanks for watching! I will surely come up with more videos on situational questions...

  • @bharatchaudhari7444
    @bharatchaudhari7444 3 года назад +1

    Thanks for making this knowledgeable video.

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Thank you Bharat. Keep watching and share with other PMP aspirants.All the best.

  • @harpreetkaur-ff3vn
    @harpreetkaur-ff3vn 4 года назад +1

    Great Help .. Kudos

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Thank you for watching & commenting! :) All the best for your PMP.

  • @Hope_Doing_Good
    @Hope_Doing_Good 3 года назад

    Excellent work Ray...
    Your d best Ever👍

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Thanks a lot for watching & commenting :)

  • @FranzEduardoValdiviaMarquina
    @FranzEduardoValdiviaMarquina 4 года назад +1

    Hello. Thanks for the content of this video. It is useful for me. Please keep creating this kind of content. Have a nice day!

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad it was helpful Franz! Thank you for watching & commenting!

  • @obioraezika4466
    @obioraezika4466 3 года назад +1

    Great content Ray!
    You're doing well

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad I could help! Thank you for your comment :)

  • @dulley4717
    @dulley4717 4 года назад +1

    👏🏻👏🏻👏🏻👏🏻 great videos!!!

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad you like them Dul! Thank you for watching & commenting!

  • @baradakbiswal7221
    @baradakbiswal7221 4 года назад +1

    Dear Ray bhai If it is possible , kindly update ITTOs for other rest chapters @ Knowledge areas as like Integration Management, Schedule Management, Scope Management ...

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi Barada. I will try my best :) Stay tuned! Thanks for watching...

  • @whiteowl8594
    @whiteowl8594 4 года назад +1

    Please continue...your videos are super helpful!!!

    • @whiteowl8594
      @whiteowl8594 4 года назад +1

      Hey can you do one about manage quality vs control quality?...I am getting those wrong in the simulators..:(

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Thank you for watching & your comment! Stay safe...

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Sure. I will keep that in mind for my future videos.

  • @dev9591
    @dev9591 Год назад

    Hello Ray, great videos could u also create such videos for the rest of the knowledge areas

    • @PMPwithRay
      @PMPwithRay  Год назад

      Will look forward to it. Thank you for watching and commenting!

  • @roumikk
    @roumikk 4 года назад +1

    Really good information. This technique is helping me immensely. Please do a video on project or pharse closing.

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      Hi Roumikk, thanks for watching & commenting. A video on Scope Management situational questions coming out on Sunday. Stay tuned!

  • @jennifersusman5743
    @jennifersusman5743 4 года назад +1

    Loving the videos! All very very helpful!!!

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad you like them! Thanks for watching & commenting.

  • @WaterSeason571
    @WaterSeason571 4 года назад +2

    Best all over the RUclips. When to get the Scope Management Situational Questions.

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      Hi Bahauddin! Thanks for watching and for your lovely comment! Will come up with the Scope Management video in this playlist soon...already shooting it :)

    • @WaterSeason571
      @WaterSeason571 4 года назад +1

      Thanks Ray

    • @PMPwithRay
      @PMPwithRay  4 года назад

      You are welcome. Stay tuned for more videos in the coming weeks!

  • @mangaivelu
    @mangaivelu 4 года назад +1

    Hi, I have a doubt about question 4. The option "Statement of work" does not mean the agreements and contracts? As the agreement is one of the inputs to develop the charter. Can you clear me, why we need not consider choice 4 is wrong, please?

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi...statement of work is a PLANNING output....(Fig 12-1, Pg260)...Agreements are EXECUTION outputs...hence they are not same...

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Page# is for PMBOK Ed. 6

    • @mangaivelu
      @mangaivelu 4 года назад +2

      @@PMPwithRay "Development phase of a project" means the project is under the initiation phase only. Also, the PII is a governance issue, the project charter is the right answer. Now I understood. Thank you so much.

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      Nice one! All the best...

  • @konfigurhandbags2522
    @konfigurhandbags2522 3 года назад +1

    Great video

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad it was helpful! Thanks for watching & commenting!

  • @bursamboy26
    @bursamboy26 4 года назад +1

    On question number 1. Shouldn’t A be the answer? You cannot handover a project to operation without formal acceptance of the deliverable.
    For answer to be D. I think the correct explanation is that the phrase “completed an application development” means you have already secured a formal acceptance. And the reason you keep getting requests is that you haven’t formally handed over to operations.
    Would love to hear your thoughts?

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hello. 'Handover' of a project is a process and not a 1-time thing. Handover involves closing all the pending items of the project as well...the second part as you explained is another way of looking at it.

    • @pcx047
      @pcx047 3 года назад

      @@PMPwithRay Hello Ray Thanks for your educational videos. On this question I am also of the view that option A should be right choice. As without Formal Acceptance of the deliverables by the customer ,project hand over can't happen. Please suggest on this 🙏

  • @ktayler77
    @ktayler77 3 года назад +1

    @pmpwithray how do I get the sheet on the ideal project manager framework

    • @PMPwithRay
      @PMPwithRay  3 года назад +1

      Hello, please watch the first video on the playlist to understand the ideal project manager framework: ruclips.net/video/6acSWefCyes/видео.html

  • @mohdharoon7061
    @mohdharoon7061 4 года назад +1

    Mr Ray,
    Is this topic included in new format of PMP exam as PMI introduced.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi Haroon...Situational questions will continue to be an integral part of PMP exam even in it's new format...thanks for watching!

  • @SailuIVA
    @SailuIVA 4 года назад +1

    you helping us lot Ray.... i am trying to attempt in Sept

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Thank you for watching & commenting! :)

  • @zainabanih593
    @zainabanih593 4 года назад +1

    Enjoying them greatly

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi Zainab. Thank you for watching & commenting! All the best for your PMP exam :)

  • @lethaberry2561
    @lethaberry2561 8 месяцев назад

    Hi Ray your video was very helpful!! Thanks so much!!

    • @PMPwithRay
      @PMPwithRay  8 месяцев назад

      Glad it was helpful!

  • @vp__786
    @vp__786 4 года назад +1

    Nicely explained. Thank You.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad it was helpful! Thanks for watching! :)

  • @bitwamet
    @bitwamet 4 года назад +1

    Can u add videos like this to ur practice questions on udemy

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi Nawaz, thanks for the suggestion. I would definitely consider that...

  • @puneettiwari1188
    @puneettiwari1188 4 года назад +1

    Got all answers correct.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Super! You are ready for your exam! ;)

  • @KrishnaKumar-et6mq
    @KrishnaKumar-et6mq 4 года назад +1

    I am absolutely enjoying your session - so well explained and i learning more i see every video you have created - Thank You Ray

    • @PMPwithRay
      @PMPwithRay  4 года назад

      You are very welcome! Thank you for watching & commenting

  • @tvshrao2179
    @tvshrao2179 4 года назад +1

    For Question 1 it was not mentioned the customer acceptance of project. How customer will accept project with issues. How to conclude it is option 4.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hello. I have explained why it is option 4 in the video itself. Do you find anything which dosen't make sense to you?

  • @anass918
    @anass918 2 года назад +1

    Hi, great video

  • @nagarajanvn7655
    @nagarajanvn7655 3 года назад +1

    very useful

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad it was helpful! Thank you for watching & commenting :)

  • @chethanachandran8172
    @chethanachandran8172 4 года назад

    In question4: Hi Ray, wanted to understand - The Project Charter once done and approved will not be changed so how do we review it again? it is not a iterative process.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Hi Chethana. Thank you for watching & commenting. reviewing here means referring to the charter. So, what you are essentially doing it is scanning the same for any mentions of PII terms & conditions. And yes, project charters do get revised if a formal ICC process documents it.

  • @khadycm4939
    @khadycm4939 3 года назад +1

    Verte helpful thank you 😊

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad it was helpful! Thank you...

  • @danielessiet4063
    @danielessiet4063 2 года назад +1

    Sir do you have a PDF version of an ideal project manager?

    • @PMPwithRay
      @PMPwithRay  2 года назад

      No. Please take a screenshot of the video.

    • @danielessiet4063
      @danielessiet4063 2 года назад

      Please consider adding it as a bonus for users of your mock stimulator. I am almost through with the practice tests. They are really tough! I mean tasking.

  • @mohdjawed80
    @mohdjawed80 4 года назад +1

    Good 1, I learn something new things today..

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Thanks for watching Jawed! :-)

  • @mohamedhabeebulla1180
    @mohamedhabeebulla1180 4 года назад +1

    Hi Ray, I appreciate if you could post some more Situational question solving.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Yes Mohammed. One is coming up this Sunday (Scope management). Stay tuned!

  • @kennyolusoga525
    @kennyolusoga525 4 года назад +1

    Very helpful!

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Glad you think so! Thanks for watching & commenting!

  • @mohdabbasrizvi7382
    @mohdabbasrizvi7382 4 года назад +1

    Thanku for the video,also ِwaiting for yiur playlist.

    • @PMPwithRay
      @PMPwithRay  4 года назад

      Will upload soon Zaid! Keep watching....:)

  • @1979carlosdaniel
    @1979carlosdaniel 4 года назад +1

    Muchas Gracias, Excelente Video..

    • @PMPwithRay
      @PMPwithRay  4 года назад

      De nada querido :) Thank you for watching & commenting!

  • @sanketpawar685
    @sanketpawar685 4 года назад +1

    In question number 4, it says during the development of the project. This made me confuse that it might be execution phase and I deleted exactly two right options at the first. How to get over such confusion?

    • @PMPwithRay
      @PMPwithRay  4 года назад

      The project is in development in the initiation phase only Sanket. Can you explain what made you think that development of a project happens during execution as well?

    • @sanketpawar685
      @sanketpawar685 4 года назад +1

      Development work of the deliverables or actual work of on product's development.

    • @PMPwithRay
      @PMPwithRay  4 года назад +2

      Development of project scope and business case. Whenever you see the term 'development' in actual PMP exam, take it in context of Initiation or Planning (unless stated otherwise)

    • @sanketpawar685
      @sanketpawar685 4 года назад

      Thanks

  • @gnanrajv
    @gnanrajv 4 года назад +1

    Great

  • @anjalikulshrestha1989
    @anjalikulshrestha1989 3 года назад +1

    Thanks...

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Hi Anjali
      Thanks for watching.

  • @danielessiet4063
    @danielessiet4063 2 года назад +1

    I need the behaviour framework PDF.

    • @PMPwithRay
      @PMPwithRay  2 года назад

      No. Please take a screenshot of the video.

  • @ashibhargava
    @ashibhargava 3 года назад +1

    helpful

    • @PMPwithRay
      @PMPwithRay  3 года назад

      Glad it was helpful! Thank you for watching & commenting :)

  • @j96220
    @j96220 4 года назад +1

    The print us unreadable. How can I clearly read the information? Thank you.

    • @PMPwithRay
      @PMPwithRay  4 года назад +1

      Sorry for that Jacqueline. Can you pls view it in your desktop or laptop? I will increase the font size next video onwards. Thanks for watching & commenting!

  • @Dcffin
    @Dcffin 3 года назад +1

    thank you :)

    • @PMPwithRay
      @PMPwithRay  3 года назад +1

      I am so glad you liked it Keep watching.

    • @Dcffin
      @Dcffin 3 года назад +1

      @@PMPwithRay Thank you Nilotpal, planning to appear for exam in June time and your videos gives a quick synapsis and overall understanding of key aspects in PMP. Before jumping into PMBOK and other study materials its helpful to learn the key things from your videos. thanks again for your time and for all the study materials. Will surely get in touch soon :)

    • @PMPwithRay
      @PMPwithRay  3 года назад

      All the best with your prep!