Building With Quality, Time and Cost
HTML-код
- Опубликовано: 22 ноя 2021
- Learn how to build your own home and save thousands of dollars.
www.howtobuildyourownhome.com
We will walk you through the process with videos and checklists so you can feel confident as you build your new home.
Facebook Group
/ 367334194377670
One of the BEST General Contractor in Southwest Utah
www.kelschconstruction.com
Real Estate in Utah
www.isellutahhomes.com Хобби
Pure GOLD!
I have since added to that with more drilled-down clarity.
Quality
• Art in Creation
• Systems and Sequences
• Communication
Time
• Hits Critical Paths
• Days to Complete in Contract or Proven Record
• Time Value of Money
Cost
• Detailed Line-item Invoicing/Estimating
• Change Order Process Internal and External
• Prompt Invoicing
Another great video, thanks Keith.
Very grateful for your confirmation of what I've always believed! I've spent many years doing fairly high production framing, and every time I felt pushed to just "get it done", it always comes back to bite me! I would constantly preach that if people would just be a little more patient, and THINK that it would pay off in the long run.... 🙄 That, and poor communication are my two biggest peeves. 😉
Great comment. Thanks. I will keep it up.
great info. always get something useful out of your videos.
Thanks. I will keep it up.
Nice video👍👍👍
Thank you 👍
That concrete work is really really good!
Thanks for your insight and perspective!
I will keep it up. Thanks
Great video. Thank you.
Unfortunately, quality is something almost unheard of in these days...
It is nice to see that somebody still take great pride in their work. I salute you, sir!
Thanks or the comment.
One of my sayings is," cheap is expensive."
That's a good saying.
Your student that's building a 4 plex in San Diego, did she get an FHA construction loan? If so, they allowed her to do it as an owner builder? Did she have to do anything else?
No, she was mostly cash with a smaller investor.
6 to 9 months ? hats insanely quick-how do you do it ??
Scheduling. The more you do it, the tighter the schedule you can make. For example, I had a major 7-way inspection on the same day insulators started. Not recommended but I passed all inspections and the insulators were clear to keep going.
Please post link to self course
Go to howtobuildyourownhome.com. Click on courses. We have a new site launching in Jan of 2022.
You dont use Zip sheeting,how come?
The added cost is not justified. A synthetic vapor barrier is not hard to install and is actually a better savings.