Srinagar Kargil Leh Rail Line Update: कब चलेगी ट्रेन?🔥कितना हुआ काम 🤔 Bilaspur Manali Leh Rail Line

Поделиться
HTML-код
  • Опубликовано: 6 окт 2024
  • Srinagar Kargil Leh Rail Line Update: कब चलेगी ट्रेन?🔥कितना हुआ काम 🤔 Bilaspur Manali Leh Rail Line
    #srinagar #kargil #leh #railproject #bhanupli #bilaspur #kargil #mandi #barmana #usbrlproject #usbrl
    #srinagar #srinagarcity #srinagarupdates #lehnews #laddakh #kargilnews #usbrlproject #punjabnews #punjab #himachalpradesh #himachalpradeshnews
    ••••••••••••••••••••••••••••••••••••••••
    🤩🤩🤩🤩🤩🤩🤩🤩🤩
    गोवा से मुंबई की ओर यात्रा चोर! संभलकर | Kochuveli - Bhavnagar Express Journey in General Class
    Click Here to Watch:- • गोवा से मुंबई की ओर या...
    •••••••••••••••••••••••••••••••••••••••
    Bhanupli Leh Line
    The Bhanupli-Leh line is an under-construction electrified railway track connecting Bhanupli, Punjab,[2] to Leh, Ladakh.[3][4][5] Once complete, the 489 km (304 mi) long, 1,676 mm (5 ft 6 in) wide gauge all-weather track is stipulated to reduce travel time from New Delhi to Leh to 10 hours. The railway is to pass through seismic zone IV and V at an elevation of 600 m (2,000 ft) to 5,360 m (17,590 ft) above sea level.
    The line, with a total length of 489 km (304 mi), including the 13 km (8.1 mi) Leh-Sasherthang rail link, will cost ₹99,000 crore (~US$12.4 billion). This includes ₹62,0000 crore (~US$7.75 billion) for 62 tunnels totaling 270 km (170 mi) in length, 114 major bridand 90 minor bridges.
    Construction Phase
    The project requires the acquisition of 1,100 ha (11 km2) of land, of which 26% is forest land, at a cost of ₹11,500 crore (~US$8.5 billion). 150 km (93 mi) of approach roads will be constructed. included in the project at the request of the Indian military
    PROGRESS
    The initial construction phase is focused on connecting the existing Bhanupli railway station in the Rupnagar district of Punjab to Barmana in the Bilaspur district of Himachal Pradesh. It has a total track length of 63.1 km (39.2 mi), 20 tunnels totaling 25 km (16 mi), 24 bridges totaling 6 km (3.7 mi), and 2 viaducts totaling 2 km (1.2 mi).
    There are five main stations in this phase: one in Punjab, at Thural; and four in Himachal Pradesh, at Dharot, Jagatkhana, Bilaspur, and Barmana.
    Extensions
    1. Leh-Srinagar rail line, 480 km (300 mi), Rs55,896 project, awaiting the "strategic national project" status & approval.
    1.1. Leh-Kargil rail line, 210 km (130 mi).
    1.2. Kargil-Srinagar rail line, 225 km (140 mi).
    2. Leh-Pathankot line, 664 km (413 mi), Rs70,308 crore project which is scrapped and declared unfeasible. However, it can be revived by declaring it as "strategic national project".
    #bbbrailproject #bbb #bhanupalibilaspurleh
    BBB Railway Project,
    Bhanupali Bilaspur Railway Line,
    bilaspur leh railway line,
    usbrl project update,
    bhanupali bilaspur beri railway line,
    bhanupali leh railway line,
    bhanupali bilaspur railway line update,
    bhanupali bilaspur leh railway line,
    bhanupli-leh-bilaspur railway line latest news,
    bilaspur manali leh railway line update,
    bilaspur manali leh railway line,
    srinagar kargil leh rail line,
    srinagar leh railway line,
    leh railway line project,
    leh manali railway line,
    srinagar kargil leh railway line,
    usbrl project,
    t15 tunnel,
    leh bilaspur railway line,
    kargil leh rail line,
    #latestupdate #railline #newvideo
    tunnel t1 usbrl update,
    tunnel t1 usbrl,
    tunnel t1 update,
    t1 tunnel usbrl update,
    usbrl project tunnel t1,
    usbrl tunnel t1,
    usbrl tunnel t1 update,
    #indianrailways
    reasi railway station,
    bakkal railway station,
    sumber railway station,
    usbrl project j&k,
    usbrl project update,
    anji khad bridge update,
    anji khad bridge,
    jammu tawi vande bharat express,
    delhi to kashmir vande bharat express,
    kashmir vande bharat,
    chenab bridge update,
    chenab bridge latest update,
    chenab bridge,
    katra banihal rail link update,
    katra banihal rail project update,
    katra banihal rail project,
    katra banihal railway line,
    udhampur srinagar railway project,
    jammu srinagar vande bharat express,
    delhi to srinagar by train vande bharat, express
    srinagar vande bharat,
    bakkal railway station,
    dugga railway station,
    sawalkote railway station,
    usbrl project update,
    usbrl vande bharat,
    reasi railway station update,
    jammu to srinagar,
    usbrl project,
    anji khad bridge,
    jammu tawi vande bharat express,
    delhi to kashmir vande bharat express,
    kashmir vande bharat,
    chenab bridge update,
    chenab bridge latest update,
    chenab bridge,
    katra banihal rail link update,
    katra banihal rail project update,
    katra banihal rail project,
    katra banihal railway line,
    jammu srinagar vande bharat express,
    delhi to srinagar by train vande bharat, express
    srinagar vande bharat,
    .
    #raillovergulam
    ❣️❣️❣️❣️❣️❣️❣️
    Thanks forwatching
    If you enjoy The video!
    Don't Forget Like & Subscribe
    Comment for more
    © Rail Lover Gulam

Комментарии • 13