Hydroelectric Projects in Himachal Pradesh Important MCQ | हिमाचल प्रदेश की जलविद्युत परियोजनाएं ।
HTML-код
- Опубликовано: 7 окт 2024
- #HPAS #HPSSC #HPPSC #Hydroelectric_project_in_himachal_pradesh
important mcq about Hydroelectric project in hp
Hydroelectric project important mcq in hindi
Girinagar Hydel Project
Situated on the river Giri of the Sirmour District, Girinagar Hydel project has an installed capacity of 60 MW, with 2 units of 30 MW each. This project, which is run-off-the-river scheme comes under HPSEB and is operational for 29 years.
This project completed in 1966 by state government.
Binwa Hydel Project
The project has an installed capacity of 6 MW comprising 2 units of 3 MW each., located near Baijnath in District Kangra. The project is situated 25 km from Palampur and 14 km from Baijnath is constructed at an elevation of 1515 meters above sea level. This project constitutes a 62-meter-long tunnel that connects trench weirs in Banu Khad and Prahal Khud.
Sanjay Vidyut Pariyojna
Located in the Kinnaur district, on the river Bhaba is a completely underground project with an installed capacity of 120 MW, comprising 3 units each of 40 MW. The uniqueness of this project lies in its underground switchyard, a feature that no other hydel project in Asia can brag about. Completed in 1989-90, the estimated cost was about 167 crore rupees. The total length of tunnels including those secured in after completing the project is 12 km.
Bassi Hydroelectric Project
Bassi project (66 MW) is an extension of Beas Power House (Mandi District) constituting 4 units of 16.5 MW each. It utilizes the tail water of Shannon Power House of Joginder Nagar project.
Larji Hydroelectric ProjectEdit
Larji hydroelectric project is on river Beas in Kullu district with an installed capacity of 126 MW.In 2014 14 Engineers died due to releasing its waters. The project was completed in September 2007.
Andhra Hydel Project
Commissioned during the year 1987-88, the project has 3 units of 5.5 MW which makes it 16.5 MW of installed capacity. It is located in Rohru tehsil of Shimla district. The cost of the project was estimated to be around 9.74 crores, transmitting to the state grid via the Nogli power house near Rampur.
Rongtong Hydel Project.
Rongtong is a 2 MW project that is located in the Lahaul-Spiti district on Rongtong Nullaha, a tributary of Spiti river. Located at an elevation of 3,600 metres in a snow adhered region, this was the first hydel project executed for the socio-economic upliftment of the tribals of this area. It is one of the highest in the world. The snow fed water runnel tapped at an elevation of 3,788 m is diverted through 2,825 m long channel and 259 m long tunnel into an open reservoir with a capacity of 14,000 cubic m. Renovated by APE Power Pvt. Ltd., APE Power also renovate RUKTI (4 × 375 KW) Hydro Electric project.
Baner and Neugal Project
With the combined installed capacity of 12 MW the projects are situated on Baner and Neugal streams respectively in Kangra District. Both of the streams emerge from Dhauladhar and join Beas in the form of tributaries in south. Is is in 2 districts the power house is in shimla and the dam is in nathpa which is in Kinnaur district.
Nathpa Jhakri Project
One of the major project on the Sutlej river is the Nathpa Jhakri Dam which generates nearly 1500 MW of electricity. The project is funded by World Bank. its construction cost is around 8000 crores.
Sainj Hydroelectric Project
Installed Capacity 100 MW. [2×50 MW]. It is situated in Kullu district.
Bhakra Dam
The Bhakra Dam has the first Dam to have come up on the Satluj river, it is one of the highest gravity dams in the world and has an Installed capacity of 1325 MW. The dam holds excess waters during the monsoon and provides a regulated release during the year . It also prevents damage due to monsoon floods. The dam provides irrigation to 10 million acres (40,000 km²) of fields in Punjab, Haryana, and Rajasthan. Bhakra Dam is established on 1954.
Larji hydroelectric project =126 Mw Largest hydroelectric project established by Himachal Pradesh Government
Q 14- larjii =126 mw = kullu
Thankuu so much sir
Heartiest thanks !
Hp related current news bhi kra do pharmacist exam k liye...plzz it's request
Bair suil me bhi kaam kar chuka hu sir g aapne sahi bola 180 mgawat bilji pada karta h
Queation -3 Russ k sahyog se ...Sanjay jal Vidyut Pariyojna chl rhi hai 👍
लारजी कुल्लू में व्यास river
Kon si h mam larji ya karcham
Largi (kullu)
Parwati jal Vidyut priyojna , Kullu
Giri pryojna sbase phle Himachal government ka dwara bnayi gyi or or larji sbse bdi 126mw
Larji vidut priyojna ,kuluu
14/14
Parvati, Kullu
larji kulu me he vyas nadi pr
Giri priyojana
Thanks sir
Larji hydel project in kullu executed by HPSEB by HP GOVT
Q6 ka 23000mw h or ab tk 10500mw ka dohan ho chuka hai 37.73%
Parvati kullu
Parvti kullu 2051mw
Sotlug river
Parvati and yh kullu me h
Shong tong 450mw
Pdf milega aap ki videos ka video mein jyada tym waste hota hai
Largi कुल्लू
Largi
Parvati
Weldan
Karsham hai HP ki private kinnor mai is it right sir pls answer?
The 1000 MW Karcham-Wangtoo Hydro-electric Project is located in Himachal Pradesh and is built on BOO basis. This is the India’s largest Private Hydropower station. It is envisaged as run-of-the-river project and is constructed on River Satluj in the District Kinnaur
In 2015 Jaypee Group sold out Karcham Wangtoo Project to JSW Group
Larzi kullu
Ruus sajay gandhi Mai support krra hai
पार्वती परियोजना
कुल्लू में है और व्यास नदी पर बनी है 2051 MW की है
Nhi larji h jo himachal srkaar ne bnaayi h
Larji
Parwati kullu 2000 MV ki
2051 mw
Larrji
Nathpa jhakri project
Rong tong
sanjay parujana
Larji