Brother superb and excellent explanation thankyou very much, one doubt please present at any changes or variations in this method i.e development charges and security deposit
Good information bro & my doubt ACD CHARGES evaru pay cheyali commercial meter madhi. ! Nen shop ki rent icha 5K ACD CHARGES pay cheayli ani current meter slip lo shop rent thanaki vachindhi madhi shop ki 2Kw meter .! Mare ACD CHARGES evaru pay cheyali.?
Ok vela meter meda load change chesna taravata ene rojulaku update ahi ta di I mean na meter meda first 2.3 kw chupistundi kani nenu ha meter meda load change chesna i mean divide chesna vera meter meda kani aahe meter meda inka 2.3 kw chupistundi kadha ani roju padutundi
Hi anna, maa meter ki contracted load 1.67 ani undhi, bill tiyyakamundh meter lo 1.57 MD ani undhi. But bill lo MD recorded lo 2.0 ani occhindi anna. Emaina problem aa anna ala osthe Edit: anna fppca enti Anna elec bill lo, almost every month 60-100 amount ostundhi
I have a new tarrif order for the year 2023-24. Could not understand slab rate for General Purpose Category. I will send you the tarrif document, if u can give yr email ID. I just need to understand it for connection to temples. Please help.
Sir memu April lo AC ni thisukunam,may lo 1.91kw ,june lo 1.54kw. ,July lo 1.25kw ani vachindhi. Maku inka amount pay chyamani recpt ami yevaledhu.oka vella recpet esty , extra charges amiyina vestara sir
Hi 1. 1.9 kw ante miku 2 kilowatt ki development charge vestaru 2. Present mi meter entha kilo watt undi 3. Example 1 kilo watt meter unte 4. Migilina 1 kilo watt ki development charge vestaru
Anna nenu poultr farm lo ,complaint ki vella ,vaallu single phase meter ki elactrical brooders 4 set chesaru , meter single phase meter , load padi service wire, nutral wire burn avthundi , em cheyyali cheppandi anna plzz solutions
బ్రో నేను అద్దెకి ఉంటున్నా నా మీటర్ నాకు సపరేట్ గా ఉంది. నా కరెంటు బిల్లు మీద Contracted Load : 2.00kw అని ఉంది. నేను 1.5 టన్ AC తీసుకుందాం అని అనుకుంటున్నా , లోడ్ పెంచుకోవాల లేక 2kw సరిపోతుందా దయచేసి ఎవరికైనా తెలిస్తే రిప్లే ఇవ్వండి...
అపార్ట్ మెంట్స్ కి ఉన్నా transformar wires మీద కాకి గాని,ఉడత గాని పడితే Plates లో ఉంటే fan గాని inveter గాని ac గాని friedge గాని whasing machine గాని tv గాని computer గాని more వస్తువులు పడిపోతున్నాయి. వీటికి రక్షణ ఎలా ఎన్ని విధాలుగా రక్షణ ఇవ్వగలము. ఏమైనా చెయ్యవసి వస్తే వాటి గురించి పూర్తిగా చెప్పండి?
Maaku DC AMT+GST Ani 1616 vesaaru maaku ac geyser yemi levu e charges pay cheyyadam valla monthly bil yeppudu vache kanty yekkuva vastada koncham cheppu bro untit charges yekkuva padatayo yeno Ani bhayanga undi
@@VamsiElectricalWorksinTelugu anna ma polam wire pette fuse lu vuntaie ga avi 100A fuse lu vadinamu okko phase ki okko fuse avi baga heat avuthunnaie endhuku
Hi bro Current bill thaggadam peragaadam mana usage mida adarapadi untundi 1. 1 kilo watt meter mida 2 kilo watt load vadakudadhu penalty padutundi 2. Ade 2 kilo watt meter mida 1 kilo watt load vadukovachhu no problem
అన్న మా లైన్ మెన్ మాకు ఏవిధమైన పేపర్ ఇవ్వలేదు, అతని డివైస్ లో మా మీటర్ నంబర్ కొట్టి అది మాకు పంపాడు, అందులో కేస్ టైప్ : అడిషనల్ లోడ్ అని ఉండి, టోటల్ అమౌంట్ 1868 అని ఉంది, డౌలప్ మెంట్ చార్జెస్ అని అందులో రాయలేదు. ఈ అమౌంట్ కట్టాల మేము? మా మీటరు .24 ఉంది ,
Anna maku letter em evaledhu but direct ga bill vachindhi enti ani adigite elpher ni over load ani cheppadu anna 3kw use chestunnaru ani over load ayindhi Ani chepparu memu 6900 pay chaiyamnnadu nijamena Anna process
@@behumble...7059 meru first chadavandi sarigga ,ye vastuvu enta consumption chestadi ani . me intlo unnatlu preti inti ki ac undadu , govt load calculation per hour kaadu per minute calculate chesi exess load kinda vestunnaru . per minute ekkadaina 3kv load padutunda domestic lo ? minimum common sense undali . oka tv, led bulbs, refridgrator, heater , washing machine ive priti intlo unde vastuvlu di ni pai 3kv load anadani ki nilivu dopdi antaru . electricty bills lo anni charges tiskuntaru with heavy taxes aina avi takkua paddai transformar kosam , paata dead aina transformars ni repair chesi british kalam nundi naduputunnaru , daily 3 sarlu power potadi, low voltage malli , konchem gali vacchina power cut . idi nilivu dopidi pedda , maddhiya targati vall ki shapam .
Give the reply please for this I have just paid development charges and security deposit just they upgrade from 1kw to 3kw and another service number from 1kw to 5kw it will coming on next raised bill, any changes in slab rates bro please answer me
I also studied electrical engineering , 3kv ante pedda girni kaani commercial electricl equipments undali . Heater paina 3kv ante adi oka ganta ki 3kv varku consuption chayaoochu ani artham . Preti load oka ganta samiyam lo yenta consume chesta do adi raasi untundi ..
3:23 కులాల కాలనీలు మతాల కాలనీలలో ఆపని చేయరు నెల నెలా కరంట్ బిల్ కట్టే వారెకే కరంట్ వైర్లు కట్చేస్టారు
Thanks anna
RUclips real use Elanti videos valla vundhi
Brother superb and excellent explanation thankyou very much, one doubt please present at any changes or variations in this method i.e development charges and security deposit
Good information bro & my doubt ACD CHARGES evaru pay cheyali commercial meter madhi. ! Nen shop ki rent icha 5K ACD CHARGES pay cheayli ani current meter slip lo shop rent thanaki vachindhi madhi shop ki 2Kw meter .! Mare ACD CHARGES evaru pay cheyali.?
Small information, bill amount almost same ae na 1-3 kv update chesaka leka bill slab change avtada?
Good explanation brother
Anna meru videos andukani cheyidam ledu. Me videos chala baguntai👍
Hi bro
Health bagoledu
Video's vastayee wait cheyandi
Good impermetion tanks annaya.
Bro security diposit amount owner peru meeda permanent ga deposit roopamlo untunda
Hi bro
Untundi
@@VamsiElectricalWorksinTelugu thankyou
Hi bro ma current bill meeda development charges 4500 vesyaru bill vochi 1200 vochindi
Good information Annayya
Thanks for clarifying anna.
bro 1616 devolapment charges kattalani slip eacharu ... money kattina tarvatha power eappatilane vadithe malli devolpment charge kattali ani slip vosthundha eala continue ga kaduthune vundala
Hi bro
Alaga undadhu
Okasari pay Chestey saripotundi
Hi bro ma mitter load 0.18kw undhi development charges mathram 1616 vachindhi.
Kw increase chesukunte manchidha present unnadhe manchidha maku AC Greaser amilevu.
maku development charges ekkuva vachinatlu anipistundhi chudu bro..
Hi bro
Meter kilo watt penchukondi
@@VamsiElectricalWorksinTelugu ok bro thanks for reply
Mee seva ko 2kv ki penchamani application pettenu vaallu etuvanti raised ivvaledhu eppudu maaku fine vesaru memu evarini adagali bro
Hi bro maadi contract load 2 kw undhi kaani vaalu check chesi meedhi load ekkuva undhi 2 kw ki pay cheymatunaaru memu inka 1 kw penchukuntey 3 kw avthadi kada 2 kw endhuku penchukomannaru
Ok vela meter meda load change chesna taravata ene rojulaku update ahi ta di I mean na meter meda first 2.3 kw chupistundi kani nenu ha meter meda load change chesna i mean divide chesna vera meter meda kani aahe meter meda inka 2.3 kw chupistundi kadha ani roju padutundi
Hi bro
Next month bill lo add avutundi
Good informeshon
Hi anna, maa meter ki contracted load 1.67 ani undhi, bill tiyyakamundh meter lo 1.57 MD ani undhi. But bill lo MD recorded lo 2.0 ani occhindi anna. Emaina problem aa anna ala osthe
Edit: anna fppca enti Anna elec bill lo, almost every month 60-100 amount ostundhi
Hi bro
emi kadhu
okasari e video chudandi
fppca charges
link : ruclips.net/video/Xnzh3AJpQuA/видео.html
Sir
Will you pl explain about electrical duty
I have a new tarrif order for the year 2023-24. Could not understand slab rate for General Purpose Category. I will send you the tarrif document, if u can give yr email ID. I just need to understand it for connection to temples. Please help.
Vamsi bro development charges pay in online facility is there are not bro please give answer
Hi bro
No
Sir memu April lo AC ni thisukunam,may lo 1.91kw ,june lo 1.54kw. ,July lo 1.25kw ani vachindhi. Maku inka amount pay chyamani recpt ami yevaledhu.oka vella recpet esty , extra charges amiyina vestara sir
Hi
1. 1.9 kw ante miku 2 kilowatt ki development charge vestaru
2. Present mi meter entha kilo watt undi
3. Example 1 kilo watt meter unte
4. Migilina 1 kilo watt ki development charge vestaru
Madhi 1kw sir, maku inka reception evaledhu. Aapudu estaru , three months nudi Akuva kw use hestunam Kadha? Extra charges amiyana
Pay cheyamantara chepandi please
Fines vesthar anta bro, ma frd vallaki vesaru anta, upgrade cheyandi max.
25hp antha minimum charge vasathaiy anna
25hp we are not using how much charges will come
Reply anna
ACD charges?
Short fall charges enduku vasthai explain
Anna nenu poultr farm lo ,complaint ki vella ,vaallu single phase meter ki elactrical brooders 4 set chesaru , meter single phase meter , load padi service wire, nutral wire burn avthundi , em cheyyali cheppandi anna plzz solutions
Hi bro
3 phase ki up grade avvandi
Bro meter load kante ekkuva load vadite meter kalipotundikada mari alatappudu development charges undadu kada clearga cheppu bro
Hi bro
1 kilo watt petti
2 kilo watt 3 kilo watt use cheyakudadu
Ikw to 3kw perigina unit price same vuntunda domestic ani rate penchi vostunda bill cheppaledu ??
same untundi
బ్రో నేను అద్దెకి ఉంటున్నా నా మీటర్ నాకు సపరేట్ గా ఉంది. నా కరెంటు బిల్లు మీద Contracted Load : 2.00kw అని ఉంది. నేను 1.5 టన్ AC తీసుకుందాం అని అనుకుంటున్నా , లోడ్ పెంచుకోవాల లేక 2kw సరిపోతుందా దయచేసి ఎవరికైనా తెలిస్తే రిప్లే ఇవ్వండి...
Hi bro
2 kilowatt saripotundi
@@VamsiElectricalWorksinTelugu thank you broo..😊😊
Rent ki unna vallu development charges kattala leka owner kattala development charge chepandi anna
Hi
Owners kattali
Hai anna. 1kw meter tho intlo chinna machines like paper plates machine run cheyocha
Hi bro
Machine wattage entha
Inka theskole anna planning. But 1kw meter medha run cheskovacha inti dhagara
Bro, rented house lo vuntam, kw increase cheskovalante adi owners kadathara leka tenants aa?
Hi bro
Owner kadatharu
Development charges owerns pay chayala rent vallu pay chayali anna
Hi
owners pay cheyyali
7 కేటగిరి గురించి చెప్పండి
3 kw meter tesukuntey akuava charges padutaya unit ki
Ala padavu mana usage batti untundi
Anna metre lo wire melt aindhi any charges untaya Anna reply please
Hi bro
Untayee okasari lineman ki complaint cheyandi
Leda
Mi area sub station lo complaint ivvachu
Hi Dude, how to pay development fee, means cash or other mode,,,
Hi bro
Mee seva
Cash
@@VamsiElectricalWorksinTelugu Thank you for your kind response
Bhayya 1kw nunchi 3kw load penchadaniki entha charge chestaru
Hi bro
5 thousand avutundi
Sir 2 kilowatt meter ki current bill ekkuva generate avuthunda
Hi
Ledu mana usage batti bill vastundi
Bro extraload paditi meterkalipotundikada mari elatelustundi e
Hi bro
Single phase meter mida 3 kilo watt varaku use cheyyachu
No problem
అపార్ట్ మెంట్స్ కి ఉన్నా transformar wires మీద కాకి గాని,ఉడత గాని పడితే
Plates లో ఉంటే fan గాని inveter గాని ac గాని friedge గాని whasing machine గాని tv గాని computer గాని more వస్తువులు పడిపోతున్నాయి. వీటికి రక్షణ ఎలా ఎన్ని విధాలుగా రక్షణ ఇవ్వగలము. ఏమైనా చెయ్యవసి వస్తే వాటి గురించి పూర్తిగా చెప్పండి?
Hi bro
oka video chesta 👍
Hi bro, present manaki yenni kilowatt allow undhi ani current bill lo thelusthundha?
Hi bro
Present
Single phase 2 kilowatt
There phase 5 kilowatt
@@VamsiElectricalWorksinTelugu Hi bro, maadhi apspdcl, " contracted load : 3 " ani undhi bill lo, does it mean it is of 3 KW.
Memu kuda 1kw to 2kw ki update chesaam..kaani oka doubt Anna, every year renewal chesukovala!...
Hi bro
Avasaram ledu
Maaku DC AMT+GST Ani 1616 vesaaru maaku ac geyser yemi levu e charges pay cheyyadam valla monthly bil yeppudu vache kanty yekkuva vastada koncham cheppu bro untit charges yekkuva padatayo yeno Ani bhayanga undi
Hi
Mi load entha kilo watt undi
Bro 1kw meterki 3kwload vadite development charge padutundi ok pay chesinatarvata meter replace chestada leka radiometer 3kwki change chestada
Hi bro
Meter replace cheyyaru
Ade meter untundi
Thank u
Development charges Online payment cheyyochaa sir
Ledu Electrical bill center kattali
@@VamsiElectricalWorksinTelugu sir, notice yem cheptundante yearly once katte tax ani cheptundi. Tax online payment cheyyochaa andi.
1kv unna meeter ni 2kv or 3kv ga change cheste power bill variation untundi haa
Hi bro
Untundi
Anna 7hp 3 phase motor entha current tisukuntundi? Ah motor ki fuse protection kosam entha rating vunna MCCB use cheyali
Hi bro
7 hp 3 phase motor 12 amps tisukuntundi
Mccb 20 amps tisukondi
@@VamsiElectricalWorksinTelugu anna ma polam wire pette fuse lu vuntaie ga avi 100A fuse lu vadinamu okko phase ki okko fuse avi baga heat avuthunnaie endhuku
2k meter echaru house constation ెఅవుతు౦దని ఈ మీటరు ెఎప్పటి కి వు౦చు కు౦టే కరెంట్ bill ఎక్కువ వస్తు౦దా brother
Hi
Present commercial meter ni
House construction purti ayena tharuvatha
domestic ki marchukondi
Thanks anna❤️
Yearly yenni times pay cheyali
One time single payment
3kv amount pay cheysaka new meter vaystara sir
Change cheyyaru
Aa same maa entiki vachhi elaa adigaru tharvatha 6700kattamani notice pamparu
Kattera mari
1kw to 2kw change cheskovali ante meter kuda change cheskovalsivastunda
Kadhu
Adey meter paina lo load penchukovachu
Bro one doubt ippudu 1kv meter vundi ippudu 3kv ki apply chesthe meter marusthara same pathade vuntada
Hi bro
Meter change cheyyaru
Aa meter mida kilo watt add avutundi
ANNA 400W KI METRE THEESUKONI 1KW Vadinatlithe Antha Amount Pay Cheyali.....
0.5 kilowatt meter vuntunda bro
Hi bro
Undadu
Bother yela kattalo cheppaledhu meru..? Ma apartment ki emo Development charges kattandi annaru kani bill iyyaledhu separate ga....
Hi bro
Mi area current office lo kattandi saripotundi
Kw penchukunte unit rate peruguthundha leka alage vuntundha..??
Hi
Alage untundi
Development charges avaru pay chayali owners r renters reply plz
Hi
Owners
OK sir tq
Kani memu valaki cheptunte Kansan respond kavatam ledu
Meme pay chayali antunaru
@@VamsiElectricalWorksinTelugu tq so much sir reply estaru anukoledu
Bro 1kw nunchi 2kw ki penchukunte current bill yekkuva avutunda same vuntunda bro plzz rply
Hi bro
Same untundi
Bro 1kw nunchi 2kw ki marchaka current bill taggutunda ac konukkunnam bro recent ga 2kw ki change cheste current bill taggutunda plzz rply bro
Hi bro
Current bill thaggadam peragaadam mana usage mida adarapadi untundi
1. 1 kilo watt meter mida 2 kilo watt load vadakudadhu penalty padutundi
2. Ade 2 kilo watt meter mida 1 kilo watt load vadukovachhu no problem
Good video
Bro online lo apply cheyocha 1kw upgradation ki from 0.25Kw
Hi bro
Mee seva lo apply cheyandi
Nice
అన్న మా లైన్ మెన్ మాకు ఏవిధమైన పేపర్ ఇవ్వలేదు, అతని డివైస్ లో మా మీటర్ నంబర్ కొట్టి అది మాకు పంపాడు, అందులో కేస్ టైప్ : అడిషనల్ లోడ్ అని ఉండి, టోటల్ అమౌంట్ 1868 అని ఉంది, డౌలప్ మెంట్ చార్జెస్ అని అందులో రాయలేదు. ఈ అమౌంట్ కట్టాల మేము? మా మీటరు .24 ఉంది ,
Same problem bro
Bro 0.5KW aa vundhi meter, 1.5ton ac vunte entha penchukovali load
Hi bro
2 kw chesukondi
0.26 kw undhi...ippudu 2kw tiskomantunnaru....tiskovala ?
Hi bro
Tisukondi
Bro 2kw geyser ki 3kw load tisukovala Leda 2kw saripotunda pls reply thnx...
Hi bro
Geyser alage lights fans untayee kadha
3 kw tisukondi
Anna maku letter em evaledhu but direct ga bill vachindhi enti ani adigite elpher ni over load ani cheppadu anna 3kw use chestunnaru ani over load ayindhi Ani chepparu memu 6900 pay chaiyamnnadu nijamena Anna process
Hi
Mi meter commercial leka domestic aa
Anna please koncham explain chaiyava process ento ardam kavadam ledhu
1 kw month a laykapothay year ka
Aa energy meter paina manam roju use chesey load
Meter name change gurchi video
బ్రదర్ మా మీటర్ లోడ్ 1340.వాడుతున్నలోడ్ 1950.లోడ్ పెంచుకోవాలా.ఎంత పెంచుకోవాలి.మనీ ఎంతవుతుంది.చెప్పండి బ్రో.
Hi bro
1kilo watt penchandi
Domestic ayite 2000
Commercial ayite 4000 avutundi
@@VamsiElectricalWorksinTelugu థాంక్స్ యూ బ్రో
Nenu electrical engineering chesa . Excess load yem ledu .. 3kv load padali ante intlo pedda girni leda commercial electrical equipments undali . Oka 3kv gyser ante oka ganta ki 3kv varku consuption chayacchu ani artham .ala intlo unna anni electrical equipments ni calculate cheste 1kv kuda undadu load . Preti equipment oka ganta ki yenta load tiskuntundo adi raasi untundi . Prajalni piccholani chesi apspdcl dabbulu dochukuntundi , oka sari employees salaries chudandi lakshal lo unnai malli recently govt prc icchi salaries ni penchindi .
@@behumble...7059 meru first chadavandi sarigga ,ye vastuvu enta consumption chestadi ani . me intlo unnatlu preti inti ki ac undadu , govt load calculation per hour kaadu per minute calculate chesi exess load kinda vestunnaru . per minute ekkadaina 3kv load padutunda domestic lo ? minimum common sense undali . oka tv, led bulbs, refridgrator, heater , washing machine ive priti intlo unde vastuvlu di ni pai 3kv load anadani ki nilivu dopdi antaru . electricty bills lo anni charges tiskuntaru with heavy taxes aina avi takkua paddai transformar kosam , paata dead aina transformars ni repair chesi british kalam nundi naduputunnaru , daily 3 sarlu power potadi, low voltage malli , konchem gali vacchina power cut . idi nilivu dopidi pedda , maddhiya targati vall ki shapam .
ok mari miru cheppindhi super mari mana intlo entha meter vundali 3kv na 2kv na 1kv load na
@@asam6923kw ra babu kV kadu😂😂😂malli electrical engineer
@@srisairampraveenganisetti typing mistake adi 😁 aina Knowledge unola ki artham aipotundi , low knowledge unola ki tvaraga artham kaadu le .
@@asam6923 typing mistake Ani covering aaa?🤣 kV ki kw ki chala teda vundi ra babu🤣. Typing mistake antaaa
Brother if I upgrade from 1kw to 3kw is there any slab changes or same for 1kw to 3kw?
Hi
same slab rates
Yes , the bill also increases. I am already suffering. Apspdcl and govt kummak ayi janalani luti chestunnaru adugute 1000 technical samadhanalu chepputaru kaani dabbu ekkve tiskuntaru kaani okka paisa kuda taggadu .
Give the reply please for this I have just paid development charges and security deposit just they upgrade from 1kw to 3kw and another service number from 1kw to 5kw it will coming on next raised bill, any changes in slab rates bro please answer me
Bro mana metre 1kilo, 2kilo limit akkada untadi
Hi bro
Bill lo
Category 1 or category 2 untundi
Alage load
1 kw or 2 kw ani untundi
@@VamsiElectricalWorksinTelugu thq brother just I have seen
Sir 2 ac 2 fridge, geezer, washing machine dishwasher ki 3 kw saripotunda? 3 phase ki maaku possibility ledu ,so em cheyalo cheptaara?
Hi bro
3 kilo watt saripotundi
Kani
At at time anni on cheyakandi
@@VamsiElectricalWorksinTelugu thank you sir
హాయ్ బ్రదర్ వన్ కె.వి నుంచి త్రీ కేవీ కి చేంజ్ చేసిన తర్వాత యూనిట్ కాస్ట్ ఎక్కువ ఉంటుందా లేదా సేమే ఉంటుందా
Hi bro
Same untundi
Load 4 kw vundhi but meter reading 2.3 kw chupistundi emaina problem
No problem
Endhuku Change chayali bro,
Ala chesthe slab rates emaina marathaya
Hi bro
Ledu
Bro 14 kw vachidi adi sadhyama
Answer please bro
సార్ మా మీటర్ పోయింది 2కేటగిరి మాకు మీటర్ కావాలి అంటే ఏమి చేయాలి
Hi bro
Malli apply cheyyachu no problem
మీటర్ కిలో వాట్ పెంచితే బిల్లు పెరుగుతుందా
Peragadhu
Process chepandi sir.
KAKINADA ❤️❤️
Bro maaku 12000 development charges vesaru,min development charges entha veyali
Hi bro
Midi energy meter single phase aa leda three phase aa
And commercial aa leda domestic aa
Same problem..1kw load undi ippudu...notice vachindi..em chayali. .
Will slab rates changes if we move from 1kw to 3kw
Hi bro
Change cheyandi
@@VamsiElectricalWorksinTelugu slab rates change avutaya oka vela 1kw to 3kw change cheste? Domestic illu meter maadi
@@tweeety2724entha aindhi
Brother all 3 lights and 2 fans and 1 refrigerator 1 glyzer off lo unna 2.19KW chupistundi why..
It is meter capacity
Additional load yem ledu kavali ani apspdcl valle public ni piccholu chesi dabbulu luti chestunnaru ..
I also studied electrical engineering , 3kv ante pedda girni kaani commercial electricl equipments undali . Heater paina 3kv ante adi oka ganta ki 3kv varku consuption chayaoochu ani artham . Preti load oka ganta samiyam lo yenta consume chesta do adi raasi untundi ..