Well explained, sir. I’m using a UTL Gamma Plus 1 kW, 12 V inverter and an Exide 12 V battery, along with waree 400 W*2 black 24 V solar panels without a net meter. As a result, my electricity bill has reduced from 1300 to 650. However, I feel that some production is wasted since I don’t use the load during the solar production period, which is from 7:00 AM to 5:00 PM. So, I kindly request your advice on whether applying a solar meter will help me reduce my bill and how to install a net meter for a hybrid system. Also, I would like to know the net meter charge for my billing cycle based in Tamil Nadu for the requirements mentioned above.
Useful
🎉 Super sir 🎉🎉
🎉🎉🎉🎉
Well explained, sir. I’m using a UTL Gamma Plus 1 kW, 12 V inverter and an Exide 12 V battery, along with waree 400 W*2 black 24 V solar panels without a net meter. As a result, my electricity bill has reduced from 1300 to 650. However, I feel that some production is wasted since I don’t use the load during the solar production period, which is from 7:00 AM to 5:00 PM. So, I kindly request your advice on whether applying a solar meter will help me reduce my bill and how to install a net meter for a hybrid system. Also, I would like to know the net meter charge for my billing cycle based in Tamil Nadu for the requirements mentioned above.
Sir how to apply subsidy for hybrid solar.please make one video as soon possible