HYBRID SOLAR SYSTEM WORKING IN TAMIL | HYBRID INVERTER | SUBSIDY | ULT SOLAR | SIGMA PCU | EEE TAMIL

Поделиться
HTML-код
  • Опубликовано: 11 дек 2024

Комментарии • 5

  • @kavinsekar.p2988
    @kavinsekar.p2988 4 дня назад

    Useful

  • @karuppasamysamy1447
    @karuppasamysamy1447 Месяц назад

    🎉 Super sir 🎉🎉

  • @INDIA-r2n
    @INDIA-r2n Месяц назад +1

    🎉🎉🎉🎉

  • @sakthivelthangaraj
    @sakthivelthangaraj 18 часов назад

    Well explained, sir. I’m using a UTL Gamma Plus 1 kW, 12 V inverter and an Exide 12 V battery, along with waree 400 W*2 black 24 V solar panels without a net meter. As a result, my electricity bill has reduced from 1300 to 650. However, I feel that some production is wasted since I don’t use the load during the solar production period, which is from 7:00 AM to 5:00 PM. So, I kindly request your advice on whether applying a solar meter will help me reduce my bill and how to install a net meter for a hybrid system. Also, I would like to know the net meter charge for my billing cycle based in Tamil Nadu for the requirements mentioned above.

  • @sakthivelthangaraj
    @sakthivelthangaraj 29 дней назад +1

    Sir how to apply subsidy for hybrid solar.please make one video as soon possible