  • The base construction is key to our EQ-Piling technology, weighing 306 tonnes and standing 11m tall with a 7.67m diameter. It houses 8 hydraulic cylinders and 16 buffer cylinders.
    IQIP timelapse shows the base being placed on an SPMT modular transporter and moved to the quay at our Sliedrecht site. This base supports the EQ-Piling water tank, which, by falling onto buffer cylinders, significantly reduces noise levels. Read more iqip.com/intro...
    EQ-Piling Technology iqip.com/produ...