Post Cementation and Core Build-Up Using LuxaCore Z Dual

Поделиться
HTML-код
  • Опубликовано: 1 окт 2024
  • with Dr. Leandro Hilgert and Raissa Antunes

Комментарии • 2

  • @zaicev20
    @zaicev20 2 года назад +1

    Wouldn't it be better to pre-cut the pin to the appropriate height, because then, when expressed, it undergoes vibration from the cut with the turbine?…excuse me for english

  • @mohammedmeniam2057
    @mohammedmeniam2057 2 года назад

    👏