Network Rail Freight Escape Episode 2

Поделиться
HTML-код
  • Опубликовано: 4 янв 2025

Комментарии • 17

  • @ThermoMan
    @ThermoMan Год назад +1

    “Jess knows this place like the back of her hand”. Jess wears a blue hard hat so she clearly doesn’t go trackside very often!

  • @mickboakes7023
    @mickboakes7023 Год назад

    Brilliant series.Good to see the unbelievable scale of these operations. We all take everything for granted these days.

  • @Olleetheowl
    @Olleetheowl Год назад +3

    You have got to have achieved the record for the amount of “Industry speak” “Buzzwords “ inside a short film 😀

    • @aljohnstone3523
      @aljohnstone3523 Год назад +1

      This has to be a video that only internal management would get excited about. I bet they had a presentation event to watch it and all pat each other on the back.

  • @darrenrussell9720
    @darrenrussell9720 Год назад

    Good series thank you. Do you have plans on producing a video about silica sand coming out of Middleton Towers (which is used in glass production). Understand its between 1,500 to 2,000 tonnes per day six days a week.

  • @leslie.ingley7573
    @leslie.ingley7573 Год назад +1

    You should of used Daniel from Asheville as your front man he love trains and as the come into he’s yard in London

  • @Hxrry-mcr
    @Hxrry-mcr Год назад +1

    Could you do the freight escape at Liverpool Biomass

  • @marktucker208
    @marktucker208 Год назад

    I wish they’d let me get a job on the railway, I’ve got no skills tho

  • @cannadineboxill-harris2983
    @cannadineboxill-harris2983 Год назад +1

    I needed to know why don’t dig a tunnel and do an extension for the main line Train so that they can extend the new abandoned underground stations.
    Why couldn’t they use the part D78 Stock train doors on the sides and also restructure the front face of the A60 and A62 stock and that includes the class 313, class 314 and class 315 remix and make them all together and also redesign them an overhead line and also make them into Five cars per units and also having three Disabled Toilets on those Five cars per units A60 and A62 stock trains and also convert the A60 and A62 stock trains into a Scania N112, Volvo TD102KF, Volvo B10M, Gardner 6LXB, Gardner 6LXC and Gardner 8LXB Diesel Engines and also put the Loud 7-Speed Voith Gearboxes even Loud 8-Speed Leyland Hydra cyclic Gearboxes in the A60 and A62 stock, class 313, class 314, and class 315 and also modernise the A60 and A62 stock and make it into an 11 car per unit so it could have fewer doors, more tables, computers and mobile phone chargers.
    A Stock Train and 8 Disabled Toilets on those A stock trains. why couldn’t we refurbish and modernise the waterloo and city line Triple-Track train tunnel and make it bigger and extend it to the bank station, making it into a Triple-Track Railway Line so those 4 European countries such as Germany, Italy, Poland And Sweden to convert the waterloo and city line Triple-Track Train tunnel into a High-Speed train?
    The Third Euro tunnel Triple-Track Train line to make it 11 times better for passengers so they could go from A to B. then put the modernised 11 car per unit A Stock and put them on a bigger modernised waterloo and city line Triple-Track train tunnel so it could go to bank station to those 4 European countries such as Germany, Italy, Poland And Sweden. The modernised refurbished 11 cars per unit A stock could be a High Speed The Third Triple-Track Euro Tunnel Train So it is promising and 37 times a lot more possible to do this kind of project that is OK for London Germany, Italy, Poland And Sweden.
    oh by the way, could they also tunnel the Triple-Track Railway Line so it will stop from Buckinghamshire, Hertfordshire and Essex so that the Passengers will go to Germany, Italy, Poland and Sweden and also extend the Triple-Track Railway Line from Bank to Buckinghamshire, Hertfordshire and Essex Stations so that more people from there could go to Germany, Italy, Poland And Sweden Easily.
    Why couldn't they extend the Piccadilly line and also build brand-new underground train stations so it could go even further right up to Clapton, Wood Street and also make another brand new tunnel train station in Chingford could they extend the DLR?
    All of the classes 150, 155, 154, 117, 114, 105, and 106, will be replaced by all of the Scania N112, Volvo TD102KF, Volvo B10M, Gardner 6LXB, Gardner 6LXC and Gardner 8LXB Diesel Five carriages three disabled toilets are air conditioning trains including Highams Park for extended roots which is the Piccadilly line and the DLR trains.
    Could you also convert all of the 1973 stock trains into an air-conditioned maximum speed 78 km/hours (48 MPH) re-refurbished and make it into a 8 cars per unit if that will be alright, and also extend all of the Piccadilly train stations to make more space for all of the extended 8 car per unit 1973 stock air condition trains and can you also build another Mayflower and Tornado Steam Locomotive Companies and they can order Every 17 Octagon and Hexagon shape LNER diagram unique minor no.13 and unique small no.11 Boilers from those Countries such as Greece, Italy, Poland, and Sweden, can they make Mayflower and Tornado Steam Locomotive speeds by up to 117MPH so you can try and test it on the Original Mainline so it will be much more safer for the Passengers to enjoy the 117MPH speed Limit only for HS2 and Channel Tunnel mainline services, if they needed 16 Carriages Per units can they use those class 55’s, class 44’s, class 40’s and class 43HST Diesel Locomotive’s right at the Back of those 18 Carriages Per Units so they can take over at the Back to let those Mayflower and Tornado Steam Locomotive’s have a rest for those interesting Journeys Please!!, oh can you make all of those Coal Boxes’s 16 Tonnes for all of the 117MPH Mayflower and Tornado Steam Locomotive’s so the Companies will Understand us PASSENGER’S!! so please make sure that the Builders can do as they are Told!! And please do something about these very important Professional ideas Please Prime Minister of England, the Prime Minister of Sweden, the Prime Minister of Germany, the Prime Minister of Italy, the Prime Minister of Poland and that Includes the Mayor of London.

    • @GIOGS
      @GIOGS Год назад +1

      What are you on about?

    • @paulnolan1352
      @paulnolan1352 Год назад +1

      Crazy, you are plain crazy.

    • @bfapple
      @bfapple Год назад

      Up there with the very best of RUclips comments.
      Also great to see some of my DB Cargo colleagues on this video.

  • @wasted-blaster.
    @wasted-blaster. Год назад +2

    Why is the presenter track side wearing trainers? He clearly didn't follow the task risk control sheets.

    • @grah84mck
      @grah84mck Год назад +5

      Safety trainers. U get them in all works now. Sorry to burst the bubble.

  • @aljohnstone3523
    @aljohnstone3523 Год назад

    This is the most corporate video I've seen in a long time, and its really bad.
    It doesn't explain anything, It's as vague with answers as the government are.
    "We've taken 30,000 tons of carbon off the road."
    I want to know how many trucks that is, not tons.

    • @cedarcam
      @cedarcam Год назад

      And they make no mention of how many tons of carbon the locomotives put out, sure it is less than road transport but by how much. Over all the world is not reducing for example how much is it increasing importing more coal thousands of miles to make the steel possibly 30,000 tons.