ZEMAN's "SBA2 Conti+" - The largest and most efficient Steel Beam Assembler

Поделиться
HTML-код
  • Опубликовано: 30 янв 2025

Комментарии • 32

  • @DBADruid
    @DBADruid 2 месяца назад

    When the complete joint welding feature be ready ? This machine can only fillet weld at the moment

  • @cindyree1615
    @cindyree1615 5 лет назад

    How do you do blasting work? before welding or after?

  • @stevebroi4425
    @stevebroi4425 Год назад

    Also as to a question asked in comments how about a grab tac blast bot then a full weld blast bot leaving only the finished job to be blasted when final coating is required to save time money on multiple blasting or small factory weld up shipped to a blasters coaters factory

  • @ralphaverill2001
    @ralphaverill2001 5 лет назад +5

    I saw one person on the floor and two in the mezzanine. Years ago the floor would have been crowded with workers making the same products. Automation is where most of the manufacturing jobs went; not overseas.
    I'm not complaining. I made a pretty good living late in my career (electrician) installing automated systems in a world-class Fortune 500 paper manufacturing facility and a large factory bakery that produced several nationally known brands of bread products.
    I worked in a medium-sized plastics factory in the early 1970's. Most of the people who worked in that factory then would be unemployable today.
    Once gone, the jobs are never coming back, no matter what a yellow-haired politician says.
    I'm retired now, but I'm glad I got to live in a time when people made stuff.

    • @nineiron1897
      @nineiron1897 2 года назад

      "Automation is where most of the manufacturing jobs went; not overseas" tell that to my family who owned one of the largest aftermarket electrical auto part companies'(alternators, starters, coils solenoids ECT) in the country. Now it's all made in China, not by robots either. CLUELESS !!!

    • @ralphaverill2001
      @ralphaverill2001 2 года назад

      @@nineiron1897 There's lots and lots of robots in China. Clueless? I'm a retired electrician who spent his last years building and installing multimillion dollar automated manufacturing/packagingn systems for a Fortune 500 manufacturing company. It's all automated.

  • @sandygrullon1027
    @sandygrullon1027 9 месяцев назад

    Los orificios de las placas se pueden hacer con plasma?

    • @luisbadilloglez.3311
      @luisbadilloglez.3311 2 месяца назад +1

      Si. Relación 1:1 respecto al espesor de la placa y hasta 19 mm norma JIS

    • @sandygrullon1027
      @sandygrullon1027 2 месяца назад

      @luisbadilloglez.3311 gracias por su respuesta.

  • @PeterSelie8
    @PeterSelie8 6 лет назад

    I wonder how the pieces of I-sections seen at 0:36 and 5:30 are processed. Are they picked up from the flange?

    • @pjvanvliet3129
      @pjvanvliet3129 6 лет назад

      yes. It basically sees the flange as a plate.

    • @antonmursid3505
      @antonmursid3505 2 года назад

      Antonmursid🙏🙏🙏🙏🙏💝✌🙌👌👋🇮🇩🇮🇩🇮🇩🇮🇩💝✌🙌👌👋

  • @stevebroi4425
    @stevebroi4425 Год назад

    Not bad but how about the pieces Grab/ hold bot also tac weld then the weld bot doing full weld why the tac bot has moved further up the beam then while the full bot is finishing the tac bot is preparing for the other face or pieces to be scanned in. You can't do weld faster but you can speed up the stations and job flow.

  • @mariadores2260
    @mariadores2260 Год назад

    Gostaria de saber como comprar está empresa com este mesmo equipamentos deste mesmo jeito

  • @colbychenette9027
    @colbychenette9027 5 лет назад +1

    That guy didn’t lock the dogs when he picked it up with the overhead crane.

  • @minhluannguyen1499
    @minhluannguyen1499 7 лет назад +1

    We need to invest in this technology. Can you provide us?

    • @ZEMANMaschinenbau
      @ZEMANMaschinenbau  4 года назад

      Contact us for more details on info@zebau.com or on our homepage www.zebau.com/en/contact

  • @luisbadilloglez.3311
    @luisbadilloglez.3311 Месяц назад

    Sehr gut! 5 mde

  • @maxscott3349
    @maxscott3349 5 месяцев назад

    It can have my job any day of the week

  • @evstatievangel4693
    @evstatievangel4693 3 года назад

    Здравейте колеги това е zukunf заваряването и поточна заваръчни линия пройзводство zeman machines 2021

  • @gordesmihaela4635
    @gordesmihaela4635 3 года назад +1

    25 mil euro ? Am i wrong ?

    • @DBADruid
      @DBADruid 2 месяца назад

      1.8 millions USD

  • @williamhuang5329
    @williamhuang5329 3 года назад

    Hanzhen harmonic drive gear , robot joint gear reducer, over 30 years experience

  • @vpvg2010
    @vpvg2010 2 года назад +1

    Excelente

  • @williamoratajr.4365
    @williamoratajr.4365 8 месяцев назад +1

    Im running same machine..hopefully tech support will help me get through all the issues we have.

    • @williamoratajr.4365
      @williamoratajr.4365 8 месяцев назад

      At present, theres a lot that needs to improve. Looks good this video.. hoping it can do its full potential..its a good machine

    • @robertburch5233
      @robertburch5233 4 месяца назад

      3 to 5 business days..

  • @yomicuttingweldingmachine
    @yomicuttingweldingmachine 7 месяцев назад

    💪

  • @adelguefrech7806
    @adelguefrech7806 7 лет назад

    Il ya un defaut le robiot soude d'un coté l'autre coté souleve avec le chauffement .

  • @antonmursid3505
    @antonmursid3505 2 года назад

    Antonmursid🙏🙏🙏🙏🙏💝✌🙌👌👋🇮🇩🇮🇩🇮🇩🇮🇩🇮🇩💝✌🙌👌👋

    • @antonmursid3505
      @antonmursid3505 2 года назад

      Antonmursid🙏🙏🙏🙏💝✌🙌👌👋🇮🇩🇮🇩🇮🇩🇮🇩🇮🇩💝✌🙌👌👋