Is my stick long enough!? Camp ground septic potential

Поделиться
HTML-код
  • Опубликовано: 27 сен 2024

Комментарии • 151

  • @brian7327
    @brian7327 6 месяцев назад +18

    Campground will be open for a year before we get to see it on DP history channel 😂😂😂

    • @Poppi2006
      @Poppi2006 6 месяцев назад +1

      You mean this video’s date ain’t early March 2024?

    • @nyamillennial
      @nyamillennial  4 месяца назад

      I will make sure everyone knows lol

  • @OregonBob1955
    @OregonBob1955 6 месяцев назад

    DP and Aaron are lucky to have you as a Project Manager! Keep up the good work.

  • @terryrogers1025
    @terryrogers1025 6 месяцев назад

    Oh boy, this is going to be interesting to watch this project develop. One lot of fore thought put in this project. Thanks for the project introduction, enjoyed watching, good luck to all parties concerned.

  • @heatherlane9270
    @heatherlane9270 6 месяцев назад

    This is a great precise of the tasks to be taken to make a legitimate camp ground. Many elements to cover and hope the dream can be realized.

  • @Vickie-Bligh
    @Vickie-Bligh 6 месяцев назад

    That's a nice overview of what he wants to do with the campground. Google maps have updated the picture (as you showed on your Hunt Stand app) to show the work that Mike & Aaron did 8ish months ago. I hope this works out for him. The Ohio is lovely and that's a great place to relax in a motorhome. Thanks for sharing this.
    Oh and I have to say I do miss seeing you with DP. I was watching some of his videos from a couple of years ago and it was nice seeing you working with him.

  • @Bman2020
    @Bman2020 6 месяцев назад +1

    I think we all got a great understanding of what needs to take place a big project for sure hope it goes a head 👍👋🇨🇦

  • @merleedgecomb6070
    @merleedgecomb6070 6 месяцев назад +1

    Matt, fantastic video. Being an occasional camper, I look forward to watching the upcoming videos of this project

  • @raymondgochenour8725
    @raymondgochenour8725 6 месяцев назад

    That’s cool we drove by that when we were there for Officer Hoover DOT class looking forward to watching the videos of the campground build out

  • @johnunsicker7440
    @johnunsicker7440 6 месяцев назад +1

    Nice overview of a large scale job with lots of different things going on. The only thing I would say is on the cabin is to make them bigger and do two bedrooms in them with queen beds. He will open himself up to a lot of client tell that way. You have couples that travel together or friends that travel together that want they own true bedroom.

  • @jimmyhicks1015
    @jimmyhicks1015 6 месяцев назад +3

    Good morning Matt and friends

  • @charleswelch249
    @charleswelch249 6 месяцев назад

    We're going to need a refresher course before Mike posts his so we can remember how it got started 😂😂😂. Going to be a incredibly nice place after finished.

    • @nyamillennial
      @nyamillennial  4 месяца назад +1

      Just come back and watch again 😂

  • @wilfredmicks4768
    @wilfredmicks4768 6 месяцев назад +1

    DP and MBTS did a great job on the roads cant wait to see the next part keep up the great work NYAM

  • @michaelhuhn90
    @michaelhuhn90 6 месяцев назад

    Very Grand plans Matt. I can't wait to see it grow. This may be the closest to real time Dirt Works for DP.....lol Keep up the good work Sir.

  • @mischef18
    @mischef18 6 месяцев назад

    Yep did enjoy this video bro. Safe travels. Ken.

  • @TheCritterWindow
    @TheCritterWindow 6 месяцев назад +6

    Is not 1/4" per foot at 100' be 25"?

  • @dennisroberts6698
    @dennisroberts6698 6 месяцев назад

    Poor ol DP & Aaron, what have you got them into LOL keep up the good work !

  • @stevenclaeys6252
    @stevenclaeys6252 6 месяцев назад

    Thank you for another great video. Stay safe out there. Cheers

  • @bwlyon
    @bwlyon 6 месяцев назад +3

    Oh my, now this is a major project! Gonna be some serious engineering to make it all work, and keep the state happy. Folks this kinda work is gonna cost $$$$$. I hope the owner is able to turn a decent profit with this venture/adventure! Let the spending begin!!!

  • @kevinmurray7135
    @kevinmurray7135 6 месяцев назад

    Most interesting Matt i wish the man a successful journey cause it will be a awesome camping experience when it’s complete the pond will make a added bonus for everyone nicely done Matt 👍😎🇺🇸

  • @philhammond5908
    @philhammond5908 6 месяцев назад +1

    This is going to be DP’s bealygood project ! Lots of new equipment like a super sized bubba dump!

  • @Schmendrake19395
    @Schmendrake19395 6 месяцев назад +2

    Matt poles are poles, not telephone poles. I spent 40 years in telcom and just rubs me the wrong way when people refer to all poles as “telephone poles”.
    I seldom make correcting comments, just had to this time. I really enjoy watching your progress on the castle.

    • @nyamillennial
      @nyamillennial  4 месяца назад

      We all have a tendency to call things incorrect 😂🤣. I will work on that.

  • @randydobson1863
    @randydobson1863 6 месяцев назад

    hello Matt & it's is Randy and i like yours video is cool & Thanks Matt Friends Randy

  • @MySynthDungeon
    @MySynthDungeon 6 месяцев назад +1

    Camp ground up date! Ya! Coffees on!!;-)!!

  • @dennis2376
    @dennis2376 6 месяцев назад +1

    A lot of ifs. :) Will an engineer be involve with the pond to avoid conflicts? This will be an interesting project. Road project was unbelievable. Thank you and have a great day. PS How close to your thought process was the road?

    • @nyamillennial
      @nyamillennial  4 месяца назад +1

      Yes. Road was spot on to my quote.

  • @raymondheckard234
    @raymondheckard234 6 месяцев назад +1

    So matt, you hare not running History channel 2 for Perry County Indiana. Poor Mike, we see snow in June on his channey it seems like🤣🤣🤣🤣
    Logger Wade is always up to date, likes yours.

    • @johnunsicker7440
      @johnunsicker7440 6 месяцев назад

      Don't like how DP does his channel don't watch. C&C equipment is that way as well 6 to 8 weeks out but like both DP and Clint has said it is better for them and easier for them. They still give us great video even if they don't record anything for a couple of weeks.

    • @nyamillennial
      @nyamillennial  4 месяца назад +1

      Everyone has to remember the amount of content he has lol. In order to give you all the details he gets 6 months out in 1 months.

  • @terrancesnyder9323
    @terrancesnyder9323 6 месяцев назад

    Good afternoon Matt

  • @wink9970
    @wink9970 6 месяцев назад +1

    thanks for video sans lighthouse

  • @neoman7479
    @neoman7479 6 месяцев назад +1

    very interesting video. Couldn't the ag field drain run adjacent to the new pond (to the east) rather than under it, and create a new exit point into the river?

    • @jackyoung42
      @jackyoung42 6 месяцев назад

      I thought that same thing !

    • @nyamillennial
      @nyamillennial  4 месяца назад

      Yes however we know there is a sand layer roughly 12’ down. We don’t want to penetrate it as it will make the pond leak

  • @michaelmartineau1373
    @michaelmartineau1373 6 месяцев назад

    Matt by the time the history chanell airs this job we will have forgotten you did this video just saying lol

  • @garymessina1609
    @garymessina1609 6 месяцев назад

    That's a lot of poop good luck with that Matt great video thanks

  • @mikegremlin5249
    @mikegremlin5249 6 месяцев назад

    Question, what about fresh water and power supply to the individual camp plots. Will all that be included after the sewer system is approved? Saves digging multiple trenches to each lot.

  • @michaelrobbins9679
    @michaelrobbins9679 6 месяцев назад +1

    It's one of the worst things about being the maintenance manager of a campground. You need pure flow... Super grinder lift stations all over. These new camper types use all sorts of stuff in their campers that should never be there
    Be-No also known as tampons and the damn plastic parts... The new aloe vera wipes... That are not bio degradable. I could go on and on.

  • @danielelwell2571
    @danielelwell2571 6 месяцев назад

    Nice.

  • @toddincabo
    @toddincabo 6 месяцев назад

    👍 So it doesn't help to write your findings and a location number on the flags?

    • @nyamillennial
      @nyamillennial  4 месяца назад

      Not for a first check. Only needed to confirm we could achieve fall.

    • @toddincabo
      @toddincabo 4 месяца назад

      @@nyamillennial 👍

  • @michaelmaker8169
    @michaelmaker8169 6 месяцев назад

    Bass in the corner of the pond? It's round. 🤣🤣🤣

  • @lancejohnson16
    @lancejohnson16 6 месяцев назад

    Can you fill the pond with the water from the field? Then pond overflow into the river

  • @raytalbot5890
    @raytalbot5890 6 месяцев назад +1

    114 ft or 113.9ft 👍👍🇬🇧🇬🇧

  • @billbeevers6864
    @billbeevers6864 6 месяцев назад

    You forgot the 11 cabin sites ...

  • @richardstepusin2922
    @richardstepusin2922 6 месяцев назад

    Here is a tip: When your 1st run is 150'? and your inv. @ the 1 st M.H. is -73.5" (.02' per Ft) to start (36''cover and 37.5" slope) you're wasting your time show S.S. piping. Pond work you can excel at. Until he Eng. Co. has a plan of all the buildings then you can't start the S.S. His time period might be June 2025.

    • @nyamillennial
      @nyamillennial  4 месяца назад

      He has a couple of options their in place.

  • @patrickehaynes
    @patrickehaynes 6 месяцев назад +1

    Bottom line, it's gonna be a sewage funnel job

  • @tiarnahildy
    @tiarnahildy 6 месяцев назад

    If you've got a 500' run, 0.25"/ft fall works out to 125" (or 10'5") of fall. I'm not sure where your guesstimate came from, but you seem to be off by a power of 10.

  • @chuckle1120
    @chuckle1120 6 месяцев назад

    Why not have some premium sites with full hook up and other sites water only with a dump station to usr

    • @nyamillennial
      @nyamillennial  4 месяца назад

      Full hook up is what he is hoping for.

  • @billkenosky3825
    @billkenosky3825 6 месяцев назад

    How does that work with the cabins.thanks

    • @nyamillennial
      @nyamillennial  4 месяца назад

      They connect to the septic system by pumping it up to a field bed

  • @MrMatthewDaugherty
    @MrMatthewDaugherty 6 месяцев назад

    So you’re going to try to raise the road and property by hauling in dirt so everyone else can flood more than before? I’ve had water up to my waist in the red and tan building on the property in front of that property. I’ve talked to the army corps of engineers and was told you can not change flood plain so good luck with your plan to save money

    • @nyamillennial
      @nyamillennial  4 месяца назад

      No the river floods at the same stage no matter what. And we are not changing it. Water will still go the same was it does today. Will this pond flood yes it sure will.

  • @jz1340
    @jz1340 6 месяцев назад

    What did you shoot for a benchmark? Thanks

  • @liammcgothigan2094
    @liammcgothigan2094 6 месяцев назад +2

    Hello matt an frends

  • @phud9657
    @phud9657 6 месяцев назад

    👍👍

  • @Chris...S
    @Chris...S 6 месяцев назад

    Ok, I just have to say it. This will definitely be the largest shitty job DP does😅😅😅

  • @twlyons1
    @twlyons1 6 месяцев назад

    🙂

  • @grayrlsc1
    @grayrlsc1 6 месяцев назад

    you totally lost me you need to explain yourself

  • @GoBlue79
    @GoBlue79 6 месяцев назад +8

    Always fascinating to learn just how much thought and work needs to happen before the dig begins.
    It seems I'll be able to stay at the campground before I can stay at the castle.

  • @michaelmullins1290
    @michaelmullins1290 6 месяцев назад +2

    This will be a year worth of videos for DP. Or maybe a year away, worth of videos! Lol

  • @bradfordstroud9073
    @bradfordstroud9073 6 месяцев назад +1

    I know you were just showing rough idea for the pond but had to laugh, it resembles an ape! Mark could use that shape in marketing the pond. I.E. Sasquatch pond!😂

    • @nyamillennial
      @nyamillennial  6 месяцев назад

      😂🤣😂🤣 I see it now!

  • @raymondheckard234
    @raymondheckard234 6 месяцев назад +2

    Matt, poop does not run up hill, unless it is liqufied in water, otherwise, it lays where it plopps on the ground.
    So if a cow drops it patty on a very steep hill, it does not run, it just stays put, until some one steps in it and goes a sliding, like my cousin did when she was not paying attention to where she was walking, and her feet went out from under her and she fell into another patty near by.🤣🤣🤣🤣🤣

  • @raymondheckard234
    @raymondheckard234 6 месяцев назад +2

    heck on the pond, you might be able to put a pipe in that goes to the river that will keep the pond full it you can do that.

    • @nyamillennial
      @nyamillennial  4 месяца назад +1

      Would run wrong way. Pipe is to ensure neighbor has a relieve for his surface water

  • @tomswindler64
    @tomswindler64 6 месяцев назад +2

    Quite interesting,amazing how much it takes to setup a area for septic service to maintain a campground.great content as always.nice to see customer involved in process.continue on doing what you do best.great video.😎😎😎👍👍👍

    • @nyamillennial
      @nyamillennial  4 месяца назад

      Thanks for watching! He is a great customer

  • @donash3199
    @donash3199 6 месяцев назад +3

    thanks for that fantastic overview of how to do a “rough” layout of what goes on UNDERGROUND when we go to a campsite.

  • @luludawg1
    @luludawg1 6 месяцев назад +1

    Matt why do I think I'm going to see a duck blind down by that dock?

  • @dave_n8pu
    @dave_n8pu 6 месяцев назад +1

    When I read the title, it reminded me of numerous post I see on some of the reddit 'smart watch' forums where someone has a watch on their wrist and post a picture on there and ask something like 'is this watch to big for my wrist' or the opposite of that, 'is it too small for my wrist'. Soooooo, my first thought was, that depends on 'where you stick it'. 🤣

  • @everestyeti
    @everestyeti 6 месяцев назад +2

    It's going to be great to see the whole project completed from start to finish, from Marks perspective it's going to be a great advertisement. 👍

  • @trentherring5640
    @trentherring5640 6 месяцев назад +1

    I can't wait for this campground to be completed. It will be a welcome edition. It's a little bit of a pull for me from Terre Haute, but we love going to be places.

  • @randybarber5308
    @randybarber5308 6 месяцев назад +1

    👍👍👍

  • @mayhemmayo
    @mayhemmayo 6 месяцев назад +1

  • @BornRandy62
    @BornRandy62 6 месяцев назад

    in this state it is required to build a pond for storage or stilling with a sub grade field tile under for the exit. Using non perf field tile would satisfy the pond sealing issue. Having field tile as the sourc water to the pond would be an algae habitat due to the fertilizer leaching .

  • @kenlee5509
    @kenlee5509 6 месяцев назад

    All trailer sewer connections are on the drivers side. All the connections to the campground sewer (and fresh water and electric) need to be close to the outlets on the trailers, so you may not be able to use "Double Y" connectors on the "Double drain" run. Just picture 2 sites back to back, they are _not_ mirror images of one another. They drain toward opposite corners. What you said @42:20 is what made me point this out. You may be able to use "Double Y" sweep connectors depending on the latitude you have due to being underground (except for the very end site on the left) but that would make for different drain angles for the runs from each opposing side. Double vs. Single Y sweep is a big thing because doubles mean half the connectors and work, but 1/4 inch fall per foot is what rules in drainage and doing so without making your campers run long flex line above ground line may be very hard given the above ground slope of the land. I have seen this done wrong in Mexico, it got very gross and un-healthy very quickly. Do not trust your campers to think deeply enough to creatively solve ... well ... anything, there will be children running into the flex line if it is long, there will be poop on the ground. Do not make your campers turn their flex pipe 90 degrees, they will fail, there will be poop on the ground... I am not sorry this is so long, preventing poop on the ground requires careful explanation.

  • @brucebenson9651
    @brucebenson9651 6 месяцев назад

    This was really interesting. Who knew a septic system was so fascinating. I'm looking forward to seeing this on DP's channel next fall or winter :). Thanks for taking us along!

  • @mhbpodnk
    @mhbpodnk 6 месяцев назад

    Nice project are you going to run the water and electrical conduit lines at the same time as the sewer lines

  • @Coopdaddy70
    @Coopdaddy70 6 месяцев назад

    I agree with the field pipe evacuation. I was thinking that water runoff from the field might have fertilizers in it that if dumped into the pond, might concentrate and eventually contaminate it.

  • @kenlee5509
    @kenlee5509 6 месяцев назад

    62 camp-sights and 1 shower house = a lot of people in line for a shower. I would do 1 shower per every 20 possible guests.

  • @midgoog2
    @midgoog2 6 месяцев назад

    Matt, Am I missing something ?? Why not route the field drain down the side of the pond instead of under it?
    Cheers Eric

    • @nyamillennial
      @nyamillennial  4 месяца назад

      Don’t want to penetrate the sand layer we know is there which would make the pond leak

  • @thebear5454
    @thebear5454 6 месяцев назад

    One way or another you gotta get the 💩💩out. Getting the angle right comes with experience. Good planning Matt.

  • @fullers1966
    @fullers1966 6 месяцев назад

    Basically what you're making is a mound system

    • @nyamillennial
      @nyamillennial  4 месяца назад

      Basically. But it is called sand lined presby

  • @CMDSR
    @CMDSR 6 месяцев назад

    22k subs way to go Matt. 25 is right around the corner.