HYDROTEST PIPING TEST MANIFOLD

Поделиться
HTML-код
  • Опубликовано: 10 дек 2024

Комментарии • 9

  • @TheRealFOSFOR
    @TheRealFOSFOR 3 года назад +1

    we were testing a piece of piping including some sort of a heat exchanger... there must have been hellova lot of air in the system. We tried to get all the air out but in the end, we pumped a pump just like the one in the video for over an hour non stop. I mean we filled it up at least 20 times.. and we only got up to 6bar. It was ridiculous. But it had to do because we had no time nor means to do anything about it.

  • @L_E_L_0_U_P
    @L_E_L_0_U_P Год назад

    Good ol baker pump, remember, the first hundred is the hardest lol

  • @Lifehacks23-y4o
    @Lifehacks23-y4o Год назад

    Very nice and informative

  • @tamatave11808
    @tamatave11808 2 года назад

    Unsafe ! Why there is a welding activity near in the Hydrotest area? And where is the barricade?

  • @sooona999
    @sooona999 2 года назад

    Where is this site location ?

  • @chandrakantaduarahduarah8391
    @chandrakantaduarahduarah8391 6 месяцев назад

    I am interested

  • @afzalhossain7653
    @afzalhossain7653 2 года назад

    Partex project