Offloading a million barrels of oil in 36 hours

Поделиться
HTML-код
  • Опубликовано: 14 сен 2015
  • MODEC was responsible for the engineering, procurement,
    construction, installation, commissioning and operations for
    the 2,000,000 barrel storage capacity FPSO including
    topsides processing equipment and a SOFEC external turret
    to a series of subsea manifolds. MODEC will operate the
    FPSO for ten (10) years with an additional ten (10) 1-year
    options.
    The facilities were also designed and will be installed for
    ease of future expansion of topsides capacity.
    For more information on Modec please visit: www.Modec.com

Комментарии •