Introduction to Statistical Process Control Charts (Lean Six Sigma)

Поделиться
HTML-код
  • Опубликовано: 22 дек 2024

Комментарии • 11

  • @codymbaldwin
    @codymbaldwin  3 года назад +2

    If you are interested in a free Lean Six Sigma certification (the "White Belt"), head over to www.sixsigmasociety.org/

    • @TheWayToHeaven1
      @TheWayToHeaven1 Год назад

      i TOOK WHITE BELT COURSE AND CERTIFICATE, AND IT HELPED ME ALOT AND LOOKING FORWARD TO GO TO THE NEXT STEPS UNTIL REACHES BLACK BELT

  • @simontie529
    @simontie529 Год назад +2

    This video was really helpful for understanding SPC for my interview!

  • @ankitseth100
    @ankitseth100 2 года назад

    awesome video on control charts with great example for better understanding, preparing for interview.it clear all my concepts of control charts

  • @mhelvertbaclaan6957
    @mhelvertbaclaan6957 Год назад

    Your Videos are very helpful and very organised. Amazing 🎉

  • @mari90640
    @mari90640 2 года назад +1

    Excellent job in explaining concept clearly. Thank you

  • @salahhasan1365
    @salahhasan1365 3 года назад

    Excellent illustration !

  • @EhsanIrshad
    @EhsanIrshad Год назад

    Please make videos on 12 frameworks of blue ocean stratigies.

  • @mattiasthalen
    @mattiasthalen 3 года назад

    Great video!
    I have a classification question. I have x order lines scheduled to ship per date, I know how many failed to ship and I want to track % of missed lines per day. Would that be the P chart? My reasoning is that it’s basically a defect, and since the sample size (lines per day) could vary showing it as % defects makes more sense. This leads me to the P chart.

  • @ankitseth100
    @ankitseth100 2 года назад

    thanks for the video

  • @bohdanlevko9558
    @bohdanlevko9558 2 года назад

    Top