Pilning - The Station That Needs Its Bridge!

Поделиться
HTML-код
  • Опубликовано: 19 янв 2025

Комментарии • 5

  • @MaryPinn-Taylor
    @MaryPinn-Taylor Месяц назад

    Perfect timing there Matt so see two trains as well as the station

  • @stanley3647
    @stanley3647 Месяц назад +1

    There is already acces at other side of track - via Station Road.
    Much cheaper and disabled friendly, will be build a acces road with new platform at loop line.
    Fast non-stopping trains to Wales still can use same route as before.
    Stopping service - switch to track 3 (loop).
    As usual needs a lot of permissions/planing to do simple thing.
    But at the end - this is better solution for long term.

    • @mattsrailwayadventures
      @mattsrailwayadventures  Месяц назад

      @@stanley3647 That would be good. Pilning would be a lot better with a good, regular service

  • @GWRNorth_Star33
    @GWRNorth_Star33 Месяц назад +1

    Sorry for photobombing your video... it is a lot better quality than what I am planning!

    • @mattsrailwayadventures
      @mattsrailwayadventures  Месяц назад +1

      @@GWRNorth_Star33 No worries. You'll get there in the end, I'm still learning the best ways