Toronto TTC/Metrolinx Line 6 Finch West LRV Testing at Sentinel & Jane and Finch Stops! 1/29/2024

Поделиться
HTML-код
  • Опубликовано: 7 янв 2025

Комментарии • 52

  • @mrxman581
    @mrxman581 11 месяцев назад +8

    You sound young, and it's great to see young people so very excited about public rail transit and trains. Those are good looking trains. Well done. Thanks.

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  11 месяцев назад +1

      Thanks very much!

    • @josephforest7605
      @josephforest7605 10 месяцев назад

      How will the trains do in a snow storm ?

    • @HughT-eg4mt
      @HughT-eg4mt 7 месяцев назад

      @@josephforest7605I am sure the line would be close and plus not much people will come on line if the conditions are bad

    • @HughT-eg4mt
      @HughT-eg4mt 7 месяцев назад

      @@josephforest7605they would close the line cause the train can’t go thought thick snow

    • @andrewisvrycool
      @andrewisvrycool 4 месяца назад

      @@josephforest7605They do fine. Kitchener has had these trains for over 5 years now and they perform pretty well

  • @fashglash
    @fashglash 5 месяцев назад +2

    This is Amazing! Thanks for sharing! As a Toronto Native (Rexdale), it’s nice to see the Finch Line come to fruition!

    • @Transit_ON
      @Transit_ON 4 месяца назад

      Idk if you noticed but I've been seeing them repave Finch so many times lately that It's actually questionable

  • @YoshitheGTAExplorer
    @YoshitheGTAExplorer 11 месяцев назад +7

    This is where I’m hoping to ride it very soon, like come on Metrolinx, get your opening dates decision to a final already…

  • @mrtransitfan647
    @mrtransitfan647 11 месяцев назад +8

    I can't wait to ride this and Line 5!

  • @Kipling688
    @Kipling688 11 месяцев назад +2

    Wow!! Nice catch!! I can’t wait to ride this and Line 5 when they open!!

  • @LuisRamirez-vv4dk
    @LuisRamirez-vv4dk 11 месяцев назад +2

    I like the slick look of these trains. I bet this line will open before the Eglingont line, lol.....Good viddeo man, thanks for sharing.

  • @Rick-C-117
    @Rick-C-117 5 месяцев назад +2

    Hopefully they’re not that SLOW when they’re fully operational. The bus that drove past was going much faster.

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  5 месяцев назад +3

      @@Rick-C-117 At the time of filming, they were testing at relatively slow speeds; they’ve recently increased as they’re operating the full length

  • @BlackHand531
    @BlackHand531 10 месяцев назад +1

    I find it funny that this might finish before the Eglinton one... 😅

  • @Dark3str3ap3rwashere
    @Dark3str3ap3rwashere 11 месяцев назад +1

    I saw an hev lfs novabus pulling into Broadview stn when I was going home today it looked like it was running on the 8 Broadview. Went out of service after tho.

  • @funvideofan1625
    @funvideofan1625 11 месяцев назад +3

    0:00 “Oh my god there it is!” It looks like your film from a building

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  11 месяцев назад

      Yeah because the street goes downward from where I was standing in the first clip

  • @my2iu
    @my2iu 11 месяцев назад +2

    I wonder if Metrolinx upgraded their Alstom trains with the same things that Ottawa needed to change to make them reliable enough for Canadian winter.

  • @jarreljones9409
    @jarreljones9409 3 месяца назад +1

    We need this in Brampton from Gateway terminal to Humber College

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  3 месяца назад

      Maybe after the Hurontario LRT opens, not a bad idea

  • @omerkayhan464
    @omerkayhan464 11 месяцев назад +4

    You should have another channel called Alex gets Around Crosstown LRT

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  11 месяцев назад +2

      Lol anything LRT-related will be incorporated here

  • @therealtransitguy
    @therealtransitguy 11 месяцев назад +1

    One time I saw a line 5 bombardier flexity testing between O'Connor (Victoria Park) & Pharmacy

    • @jaygatz4335
      @jaygatz4335 10 месяцев назад

      I saw seven trains testing on the same line recently.

  • @nickysexperience004
    @nickysexperience004 11 месяцев назад +1

    Though I don’t live near Line 6, it would be useful for me to use so that I could go places and then go to and from college without a hassle if only I didn’t flunk out all the time :(

  • @synergy8462
    @synergy8462 11 месяцев назад +2

    Great catch👍

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  11 месяцев назад

      Thanks!

    • @synergy8462
      @synergy8462 11 месяцев назад +2

      @AlexGetsAroundTO Let's hope line 6 opens up this summer.

  • @petitkruger2175
    @petitkruger2175 10 месяцев назад +1

    Anyone know why they have used a big letter 'T' for Line 6 sign posts? Why didn't they just use the TTC logo?

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  10 месяцев назад

      It’s a stupid symbol for Metrolinx’s wayfinding system

  • @TTCactiononthesubway
    @TTCactiononthesubway 11 месяцев назад +3

    I saw it on Thursday

    • @Gurtejbauer24
      @Gurtejbauer24 11 месяцев назад

      Hello Anthony

    • @TTCactiononthesubway
      @TTCactiononthesubway 11 месяцев назад

      @@Gurtejbauer24 hey Gurtej how are you?

    • @Gurtejbauer24
      @Gurtejbauer24 11 месяцев назад

      @@TTCactiononthesubway all good here 😄

    • @TTCactiononthesubway
      @TTCactiononthesubway 11 месяцев назад +1

      @@Gurtejbauer24 that's good to know Gurtej but I'm not doing that good I feel like I'm coming down with something

  • @mrxman581
    @mrxman581 11 месяцев назад +1

    How long are these kinds of trains tested? 6 months, maybe?

  • @steezyblu
    @steezyblu 11 месяцев назад +1

    it would be funny if this openes before eglinton

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  11 месяцев назад +1

      It would but that most likely won’t happen

  • @mrxman581
    @mrxman581 11 месяцев назад +1

    If you haven't already, maybe one day you'll get a chance to visit LA. We have the largest LRT system in the USA.
    We also have a lot of older buildings with cool elevators like the Bradbury Building in DTLA. Keep up the great videos.

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  11 месяцев назад

      I’ll definetley get to LA at some point and thanks!

  • @CANMONQUE
    @CANMONQUE 11 месяцев назад

    Unfortunately look very slow!

    • @AlexGetsAroundTO
      @AlexGetsAroundTO  11 месяцев назад +1

      They’re testing at slow speeds to start

    • @CANMONQUE
      @CANMONQUE 11 месяцев назад

      The projection are 36 mins for 10KM. This is beyond bad.