NCCCO EXAMS: YOU NEED TO SEE THIS COMPLICATED LOAD CHART QUESTION!

Поделиться
HTML-код
  • Опубликовано: 20 янв 2023
  • WORK THROUGH THIS NCCCO LOAD CHART SAMPLE QUESTION WITH ME TO PREPARE FOR YOUR EXAM!
    #NCCCO #LOADCHART #crane #craneoperator #CCO
  • ХоббиХобби

Комментарии • 27

  • @Crane-1
    @Crane-1 Год назад +12

    You know I’ve been a nccco ever since since this started to be the norm
    The first thing as a operator you find out is what your heaviest load is going to be and rig the crane for that, then your path of travel for over head and underground hazards!
    Why would you 4part a block when 2 parts is all that is required
    You run the boom out with 4 part block you would assume it’s going to be a heavy load, in the real world heavy load means max boom angle 4 part block you run out of cable before your hook gets to the ground
    But in the world the people that came up with these tricky questions, you have plenty of new cable I’ve been doing hook work for over 40 years when I started the operator’s job was fun and highly respected
    I guess what I’m trying to say is for you new guys and gal’s pay attention to the questions you’re being asked and make sure you are using the right load chart
    They are trying to trick you right out of your job
    Just saying
    It’s still a good trade and most likely close to being the highest paid on the job site
    Remember this if something goes wrong it’s always the crane operator’s fault

    • @RLoose9494
      @RLoose9494 11 месяцев назад

      Agree 100%. The test really isn’t set up for learning it’s set up to trick you and fail you for a retest all about the cash.

  •  2 месяца назад

    you did 159 x all right 4

  • @noahday8642
    @noahday8642 2 месяца назад

    Fantastic thank you keep up the amazing work brother

    • @tieronecrane
      @tieronecrane  2 месяца назад

      Hey, I really appreciate that. I sure will. Thanks a lot.

  • @jeremysisk1489
    @jeremysisk1489 8 месяцев назад +1

    Do you have any practice materials to buy

  • @manuelslp7264
    @manuelslp7264 Год назад +2

    Very helpful video. I’m gonna try to get my Crain certification later this month do you know any webpage that I could go and study for my written exam

    • @tieronecrane
      @tieronecrane  Год назад

      Hello, I offer online mobile crane prep courses at tieronecrane.com you can reach me via call or text at 210-400-9868 for more details. Thank you.

  • @ArmandoGarcia-do9bz
    @ArmandoGarcia-do9bz Год назад +4

    Don't you have to deduct only two part of the main,since you are using two for the lift.

    • @tieronecrane
      @tieronecrane  Год назад +2

      Yes sir that’s correct and exactly how it was done. Go to mark 5:38 and it will show that portion.

    • @mitchescobar1060
      @mitchescobar1060 Год назад +2

      Okay confused on the parts of line? Two parts excessive, so why or where do we come up with multiplying times four is it because it’s a total of four parts per line?

    • @tieronecrane
      @tieronecrane  Год назад +2

      @@mitchescobar1060 because the rope is two pounds per foot. If the rope were one pound per foot we pile just multiply by two.

    • @RLoose9494
      @RLoose9494 11 месяцев назад +2

      By multiplying by four you just skipped a step. However in the video you fail to explain that.

  • @coachmannymh
    @coachmannymh Год назад +1

    Hi I would like to seek some professional help on the new TLL load charts?

    • @tieronecrane
      @tieronecrane  Год назад +1

      Of course. Shoot me an email at tobrien@tieronecrane.com I will be happy to assist.

  • @leesmith9942
    @leesmith9942 10 месяцев назад

    Pretty sure you were supposed to go to 160' of line in the range diagram, instead of trying to guess it. That way you know your not gonna be under weight on your calculations. That's the way it was taught in school and on most other videos.

    • @tieronecrane
      @tieronecrane  10 месяцев назад

      You definitely could do it that way. Just like to be precise!

  • @jeremysisk1489
    @jeremysisk1489 10 месяцев назад

    Can you buy practice materials with these new ncco load charts

    • @tieronecrane
      @tieronecrane  10 месяцев назад

      You sure can. All of the material is updated with the new load charts.

    • @jeremysisk1489
      @jeremysisk1489 8 месяцев назад

      Where are the study materials at to order

    • @tieronecrane
      @tieronecrane  8 месяцев назад

      @@jeremysisk1489 go to tieronecrane.com/shop/
      From there add whichever courses you need, purchase and create an account, then access the courses. You can use code osha20 for 20% off.

    • @jeremysisk1489
      @jeremysisk1489 8 месяцев назад +1

      I’m looking for the new linkbelt load charts

    • @tieronecrane
      @tieronecrane  8 месяцев назад

      @@jeremysisk1489 you can find the new generic TLL load charts on cco’s website. Just go to certifications, then written exam, then there will be a link for all of the load charts including the TLL charts you’re needing.

  •  2 месяца назад

    You deducted for 4 parts I don't understand