Keller Portugal Moita Stone Columns
HTML-код
- Опубликовано: 11 ноя 2020
- Keller has just finished the geotechnical works on the new logistic platform of ALDI-Portugal located in Moita, 30 kms south of Lisboa. The works include aprox. 6700 stone columns with up to 16 m depth, in an area of c.a. 50.000 m2, and have been performed with Vibrocat® rigs, these ones designed and built by Keller specifically to perform stone columns using electric depth vibrators, thus following the most suitable methodology for the performance of this soil treatment solution. Also 82 un. precast displacement piles were performed, using Juntann latest model rigs.
Subscribe: bit.ly/2ImjDkD
Every day, people around the world live, work and play on ground prepared by Keller. Used alone or in combination, our techniques solve a wide range of geotechnical challenges across the entire construction sector - from industrial and commercial to housing, infrastructure and environmental projects.
#KellerGroup #Geotechnical
Website: www.keller.com/
Twitter: bit.ly/2ShUrMC
Facebook: bit.ly/2E2SqP9
LinkedIn: bit.ly/2IrtmGU
Keller Group on RUclips:
/ kellergroup Наука
Tem vaga para operador de hélice continua monitorada. Sou operador a mais de 10 anos. Experiência em fundações
what a good video Keller, looked like the site soil is dominant sandy, what is suitable test for the stone column after the construction?
Locker site supervisor
Hi dear. I m also keller ksa employe as a machanic i need job in purtgal
Job iruka bro
Im Exs kellerIndonesia
DECE complete BE STUDYING part time