Does anyone else of knowledge see when the counter weight base plate is lifted off the trailer it is dangerously close to flipping upside down in the straps?
@@alltree78 Sounds great on paper, but when you introduce human stupidity into the equation, anything can happen lol. Murphy's Law and all that... Never underestimate the power of complacency.
Manitowoc Cranes like to see the load chart and boom length configurations.? Operating a RT 90 E and the boom seems to be very heavy at low degree angles not allowing much load capacity with 141 ft of main boom . Seems to be built to for capacities straight up at higher boom angles!
@@intellidog58 *All* cranes are built for capacities at higher boom angles. Going below 45 degrees is a real quick way to eat shit. It's not a tower-crane. By the way you're talking, I have a very hard time believing that you operate anything bigger than a pallet jack.
@@PeterAlexanderWelch your right but I said that gmk3055 gmk5130 auto swing break is necessary for that models .every other models have these swing breaks but these models have not .I request to Grove that they have to make auto sewing breaks because these are very important Thanks
Amazing how far cranes came along since I operated in the 1980's.
Tanpa crane lain menolong bahaya tuu.. apa apa pun model ni terbaik boskur
デザインが良くていいね。こういうクレーン車のラジコンをただで作ってくれる職人おりませんかね?お願いします。
自分作りたいけど、加工用の道具や仕組みや設計図も手に入れること出来ないので、ドイツのすご腕!RC模型ビルダーを見て、本格的なラジコンを欲しくなりました。
Si. Great crane
Very nice
Wonderful
I'm Crane Operator
The equivalent Liebherr looks 100% easier.
Saw the Liebherr crane & everything was done by the crane. This 1 is done by manpower👎🏾
Gd crane but grovea sensor are not very hd spoil faster than otjer crane maybe vrove R&D sgould look into it
ми күшті екен
あとカッコいい
👍👍
Класс 👍
Does anyone else of knowledge see when the counter weight base plate is lifted off the trailer it is dangerously close to flipping upside down in the straps?
Sny734, it sure looks that way. On the link belt you pick it up from the top. It looks like they could have done that here too.
Because the chains go up thtough the middle of the counter weight and there are 4 equal points of lift it supposedly lol wont flip
@@alltree78 Sounds great on paper, but when you introduce human stupidity into the equation, anything can happen lol. Murphy's Law and all that... Never underestimate the power of complacency.
@@alltree78 The base plate the base plate. No chains. It was lifted with slings
Классно
При чем минус 25 для людей сделано
What is the carrying capacity? 130 ton
Grove Left trigger ABAC Confirm lol
You'd hold your right Deadman switch for abac! Left would be babc
Gave up after 30 seconds.I saw too much handballing.
Блин, я подумал это техника без шасси, мм.как акзалос это гусеничный кран
This takes how long? Day or so?
+Jim's videos It takes roughly 2.5 - 3.5 hours depending knowledge/ experience with the equipment
Manitowoc Cranes like to see the load chart and boom length configurations.?
Operating a RT 90 E and the boom seems to be very heavy at low degree angles not allowing much load capacity with 141 ft of main boom . Seems to be built to for capacities straight up at higher boom angles!
free porn
@@intellidog58 *All* cranes are built for capacities at higher boom angles. Going below 45 degrees is a real quick way to eat shit. It's not a tower-crane. By the way you're talking, I have a very hard time believing that you operate anything bigger than a pallet jack.
INF1D3L010 Well your correct , I’m use to operating crawlers with main boom and luffer ! Dip Shit 🖕
Grove gmk 550
0
How many tan this
That’s a lot of fucking about that
No good gmk355 and gmk5130 because thees model no ato sewing breaks
I am sure the operator could take as many sewing breaks during the day as he chooses. You need to be more tolerant of others choices in life.
Peter Welch, trying to make it through the day with a torn garment can be very frustrating. The importance of sewing breaks can't be stressed enough.
@@PeterAlexanderWelch your right but I said that gmk3055 gmk5130 auto swing break is necessary for that models .every other models have these swing breaks but these models have not .I request to Grove that they have to make auto sewing breaks because these are very important
Thanks
Your right
One day looks about right, probably a little bit less.
+Kenny Wong It takes roughly 2.5 - 3.5 hours depending knowledge/ experience with the equipment
Гров кран конечно неочень