Velcourts EB Farms The 2013 Drilling Campaign
HTML-код
- Опубликовано: 16 окт 2024
- Th the 2013 Drilling campaign was a bit of a ball ache with the 2012 campaign being a disaster the decision was made to run one of the Quadtracs round the clock. After 7 weeks over half the acreage was drilled, and then came the rain. the ploughs came out and we pushed on till Christmas and got er done.