Sandwich system running track construction and Artificial turf pitch laying process

Поделиться
HTML-код
  • Опубликовано: 14 окт 2021
  • Sandwich System Running Track Construction
    Primer treatment (base sealing and joint filling)
    Bottom layer construction
    Surface layer construction
    Runway line marking
    Artificial turf pitch laying process
    Install the shock-absorbing pads
    Laying the turf and coat proper volume of matched glue at the back of turf and on the surface of joint tape.
    Cut off and inlay the functional line(join the pre-cut white functional lines and green grass with joint tape).
    Infill the silica sand
    Infill the rubber granule
    Grooming
    www.greenvalleyrubber.com
  • СпортСпорт

Комментарии •