  • Be a fly on the wall in my training room to hear about the NG2 risks assessment project
  • ХоббиХобби

Комментарии • 15

  • @frankaspire5911
    @frankaspire5911 7 месяцев назад +2

    I'm back here after 3 months. My IG2 results came out yesterday and I passed. Thank you so much. This video was so helpful to me.

  • @powerpassionyoga6501
    @powerpassionyoga6501 5 месяцев назад

    Thank you so much for this video. I passed my IG2 and Im so grateful. That part about exclusions within the scope helped me ensure I missed nothing. A million thanks🎉❤

  • @DuncanKay
    @DuncanKay Год назад +1

    Glad to have you back at the right time a few weeks to submit mine.
    You're a wonderful teacher.
    Cheers

  • @chumaemesiani8789
    @chumaemesiani8789 4 месяца назад

    THANK YOU VERY MUCH!!! I SHOULD HAVE FOUND YOU BEFORE MY FIRST ATTEMPT.

  • @GraceKerry-mv6hj
    @GraceKerry-mv6hj 4 месяца назад

    Do we have to do it on our organization or a case study company that they give us in our practice one?

  • @rambhujel6549
    @rambhujel6549 6 месяцев назад

    Great tips

  • @frankaspire5911
    @frankaspire5911 11 месяцев назад

    Hello, when the results will be out, are they being sent together with the ig1 results? Or the results for ig1 and ig2 are sent separately

  • @KuyaMaykTV
    @KuyaMaykTV 8 месяцев назад

    How to put timescale for excessive noise coming from the concrete chipping activity ? Can we put 1 day or 1 week? Or immediately?

    • @nkhan1236
      @nkhan1236 6 месяцев назад

      write 1 week at least

  • @frankaspire7522
    @frankaspire7522 Год назад

    In the scope of risk assessment, must we include all the areas that we have in our assessment. Or just afew?

    • @safetynow5984
      @safetynow5984  Год назад

      Usually your risk assessment will cover a workplace or an area within the workplace.
      So it might cover for example the workshop and office areas but excludes the car parks.
      What ever is in the risk assessment must be within the scope of it too.
      Hope that helps

    • @frankaspire7522
      @frankaspire7522 Год назад

      Yeah thank you. Last question, in part 1 the topic. Any other relevant information must the job title of the person responsible for health and safety be mentioned as well?

    • @safetynow5984
      @safetynow5984  Год назад

      @@frankaspire7522 not necessarily. It can be anything relevant to the risk assessment or the company.
      But whatever you do , do not leave any boxes empty. If it is not relevant then that’s what you put in. “Not relevant “
      And the same with your risk controls. If something has been fully controlled then do not leave the box blank. Put “ not further controls required “ and therefore the allocated responsibility and time scale will be “ not applicable “ for both boxes.

  • @nmmedia153
    @nmmedia153 10 месяцев назад +1

    Is IG2 REPORT SCANNED FOR PLAGIARISM?