Osor (Canal) Bridge /Between the Islands of Cres and Mali Lošinj

Поделиться
HTML-код
  • Опубликовано: 26 мар 2012
  • This bridge connects the Islands of Cres and Mali Lošinj. Bridge is opened every day at 9 AM and 5 PM to let boats pass the canal instead of sailing arround the islands (recorded on 3/22/2012.).

Комментарии • 5

  • @Iz0pen
    @Iz0pen 3 года назад +3

    LOVE the Solis state engineering of the hand crank, anyone could open it in an emergency!

  • @FlatlandMando
    @FlatlandMando 6 лет назад +3

    I see the bridge- handler manually cranks the bridge each time? They could install an electric motor but then the bridge operator would be less fit!

    • @markomrako5844
      @markomrako5844  6 лет назад

      You've got a point there :D
      Thank you for watching & stay safe ;)

    • @user-nt1gv7wi9j
      @user-nt1gv7wi9j 2 года назад

      It is electrified meanwhile. Bridge Operator is having a beer afterwards in the pub on market plane. Everyday twice...