Bathroom Renovation! || STAGE 1 Floor Framing

Поделиться
HTML-код
  • Опубликовано: 21 сен 2022
  • This video is not a how too. I wanted a flush connection on my tiles and flooring so i decided to cut out the existing hardwood joist and lower them 50mm. We are turning this hallway into a master Ensuite, stage one is all about floor framing ang getting the cement sheets down so we can water proof ASAP! we used treated pine Joist as material were hard to come by..
    For more infor DM me on instagram/ tiktok / Facebook ‪@Conthebuilder‬
  • ХоббиХобби

Комментарии •