BNSF Sandpoint Idaho, New Lake Pend Oreille Bridge under construction.

Поделиться
HTML-код
  • Опубликовано: 24 янв 2025

Комментарии • 10

  • @EntertainmentWorldz
    @EntertainmentWorldz Год назад +1

    great train video sir

    • @stampbj
      @stampbj  Год назад

      Thank you very much! We really enjoyed catching trains at this location, far from home.

  • @stanfullerton8485
    @stanfullerton8485 2 года назад +2

    cool stack train pics----North Idaho beautiful

    • @stampbj
      @stampbj  2 года назад

      I agree the northern lands of Idaho are breathtaking! Thanks for watching Stan.

  • @KCTopDawg
    @KCTopDawg 2 года назад

    Awesome video Brad

    • @stampbj
      @stampbj  2 года назад +1

      Thanks for watching Darryl, I'm glad you enjoyed it!

  • @StormySkyRailProductions
    @StormySkyRailProductions 2 года назад +1

    Very cool catch Brad, I liked the perspective of this one! Sounds like the rails were recently ground, have a Great weekend! (Dave).

    • @stampbj
      @stampbj  2 года назад +1

      Thanks Dave!
      The new bridge is open as of Nov. 20 2022, ahead of schedule, and all trains are using it. However the project still requires double tracking through Sandpoint, that includes another bridge, modifications to the Northern Pacific/Amtrak depot platform and the UP diamond. As well as improving the existing 1905 NP bridge.
      BNSF expects this to be completed late summer of '23. At that point double track train traffic can truly begin through Sandpoint Idaho.

    • @StormySkyRailProductions
      @StormySkyRailProductions 2 года назад +1

      @@stampbj You are welcome. Great info!

  • @consanna
    @consanna Год назад +1

    Please get a shot of trains using both bridges at the same time. Proof the funnel has been solved.