Thanks Dave! The new bridge is open as of Nov. 20 2022, ahead of schedule, and all trains are using it. However the project still requires double tracking through Sandpoint, that includes another bridge, modifications to the Northern Pacific/Amtrak depot platform and the UP diamond. As well as improving the existing 1905 NP bridge. BNSF expects this to be completed late summer of '23. At that point double track train traffic can truly begin through Sandpoint Idaho.
great train video sir
Thank you very much! We really enjoyed catching trains at this location, far from home.
cool stack train pics----North Idaho beautiful
I agree the northern lands of Idaho are breathtaking! Thanks for watching Stan.
Awesome video Brad
Thanks for watching Darryl, I'm glad you enjoyed it!
Very cool catch Brad, I liked the perspective of this one! Sounds like the rails were recently ground, have a Great weekend! (Dave).
Thanks Dave!
The new bridge is open as of Nov. 20 2022, ahead of schedule, and all trains are using it. However the project still requires double tracking through Sandpoint, that includes another bridge, modifications to the Northern Pacific/Amtrak depot platform and the UP diamond. As well as improving the existing 1905 NP bridge.
BNSF expects this to be completed late summer of '23. At that point double track train traffic can truly begin through Sandpoint Idaho.
@@stampbj You are welcome. Great info!
Please get a shot of trains using both bridges at the same time. Proof the funnel has been solved.