Hi Madam i have a question regarding to excavation quantity of substructure. As you know mostly we have footings( which havs it's own depth and area) and at the same time we have to excavate wall trench(which have it's own depth) since these two works are depend on each how should i calculate both properly?
Why are you leaving the two centre columns when DDT and on the longer side why are you putting two beam yet practically one Long beam is always put during construction
You are my best teacher I love you NAOMI
Thank you..I love you too
Good Evening. Thanks for the good work. Did you manage to scan the plans/details and where/how can we access them ?
Hi Madam i have a question regarding to excavation quantity of substructure. As you know mostly we have footings( which havs it's own depth and area) and at the same time we have to excavate wall trench(which have it's own depth) since these two works are depend on each how should i calculate both properly?
Thanks so much for your question.I am working on a video that will explain this concept very clearly.Kindly keep tuned.
@@easyqs thanks for your reply. I'm looking forward to see that lecture soon
hello madam i hv a question how can i get ? my question is about floor finishing
Go ahead and ask please
the high of parapet wall cant be less than 500mm the one you are doing was suppose to be 750mm
That's true.There was an error in the measurement in the drawing.
Please next improve on the quality of the camera
Kindly check out our PowerPoint video on the same
Why are you leaving the two centre columns when DDT and on the longer side why are you putting two beam yet practically one Long beam is always put during construction
The beam is on top of the wall all around and passing through the centre.
Your camera is a times not clear
Sorry.I will redo this one
@@easyqs please redo