Размер видео: 1280 X 720853 X 480640 X 360
Показать панель управления
Автовоспроизведение
Автоповтор
How long the depth and bird needed base tower 180’ toll ?How many m^3 of concrete and steel rod for 180 ‘ roll tower ? and in which angle the bar is direction connection with the structure
More information in the description under the video
Surprising😮😮😮😮
Thanks
I've worked hard jobs my whole life. That right there is a job for tough people.
Wow, that much work for a single lattice tower, no wonder most power companies are switching to monopoles and H-frames
Boa tarde
Porting to this hieght is how tough
How long the depth and bird needed base tower 180’ toll ?
How many m^3 of concrete and steel rod for 180 ‘ roll tower ?
and in which angle the bar is direction connection with the structure
More information in the description under the video
Surprising😮😮😮😮
Thanks
I've worked hard jobs my whole life. That right there is a job for tough people.
Wow, that much work for a single lattice tower, no wonder most power companies are switching to monopoles and H-frames
Boa tarde
Porting to this hieght is how tough