Our work: Green Street bridge lift in Wangaratta, Victoria - September 2024
HTML-код
- Опубликовано: 30 ноя 2024
- Inland Rail achieved another milestone in Victoria lifting the Green Street bridge superstructure into place in September 2024.
A 650-tonne Superlift crawler crane was used to install the 200-plus tonne steel bridge structure.
Green Street bridge is being replaced and the tracks have been lowered to allow double-stacked freight trains to use the line.
For more information visit, inlandrail.artc.com.au/b2a