Our work: Green Street bridge lift in Wangaratta, Victoria - September 2024

Поделиться
HTML-код
  • Опубликовано: 30 ноя 2024
  • Inland Rail achieved another milestone in Victoria lifting the Green Street bridge superstructure into place in September 2024.
    A 650-tonne Superlift crawler crane was used to install the 200-plus tonne steel bridge structure.
    Green Street bridge is being replaced and the tracks have been lowered to allow double-stacked freight trains to use the line.
    For more information visit, inlandrail.artc.com.au/b2a

Комментарии •