  • @satyamporte5229
    @satyamporte5229 4 года назад +1

    Sir how can I know which labour perform particularly what kind of activity ? Like bhisti, Bandhani, beldar which are given in CPWD

  • @kaushaleshsingh5725
    @kaushaleshsingh5725 Год назад

    Sir,plz explain how did calculate will labour coficient value according CPWD

  • @MohammadAli-kc1vn
    @MohammadAli-kc1vn 4 года назад +2

    Sir how much cubic meter a labor can do manual excavation in 8 hours

  • @thephysicsbyabhinav0999
    @thephysicsbyabhinav0999 4 года назад +1

    Nice lecture sir... plz make a lecture on SS staircase railing rate analysis

  • @scientificnature
    @scientificnature 3 года назад +2

    Sir please upload all the video related to rate analysis of all the work by cpwd

  • @akshaythorat5952
    @akshaythorat5952 2 года назад +1

    is this rate applicable to mumbai ?

    • @processautomationforengine875
      @processautomationforengine875 2 года назад +1

      Hi Akshay,
      The state PWD prepare their rates based on Delhi Scheduled of rates.
      If the terrain is hilly, they will suggest a premium and in other places, there can be a discount also

  • @kuldeepsinghrajput8071
    @kuldeepsinghrajput8071 4 года назад +1

    Another good lecture

    • @JSPtube
      @JSPtube  4 года назад

      Thank you so much Kuldeep.
      In this lecture, we saw how something like earthwork is computed. In the next lecture, you will see how we can compute construction materials. In particular, it will be an introduction to how to work out the requirement of Shuttering

    • @JSPtube
      @JSPtube  4 года назад

      You are one awesome follower.

    • @JSPtube
      @JSPtube  4 года назад +1

      Kuldeep, trust all is well at your end. Missed you in the last two videos I uploaded. Meanwhile, you will find this video very relevant ruclips.net/video/nxa7SFyh-eA/видео.html It deals with important considerations for rate analysis. There are also a couple more links in the description of the video that could be of help to you.
      Take care

    • @kuldeepsinghrajput8071
      @kuldeepsinghrajput8071 4 года назад +1

      @@JSPtube actually sir your all videos related to project managment & contract mangment as well as Cpm & PERT are save by me in offline mode & also new videos are i am saving hand to hand

    • @JSPtube
      @JSPtube  4 года назад

      Thanks for the compliment Kuldeep. Please let me know if you want any other topic in particular

  • @nidhi5180
    @nidhi5180 3 года назад +1

    sir please explain the work of mate

  • @zurichzurich1735
    @zurichzurich1735 2 года назад +1

    Where and how can I get the quantity 2.2,0.008?

    • @JSPtube
      @JSPtube  2 года назад

      Hi Zurich Zurich, I am not able to understand what you wish to get. Could you please point me to the source / point in the video that you are referring to.

    • @zurichzurich1735
      @zurichzurich1735 2 года назад

      Sir I’m talking about quantity of labors

    • @manikantapola5336
      @manikantapola5336 2 года назад

      @@zurichzurich1735 Those are the productivity co efficient and also this values are got by practice of that work in real world or by experience

  • @vasanthraj9682
    @vasanthraj9682 4 года назад +1

    Dear sir please explain escalation clause 10ca and 10cc in cpwd contract

    • @JSPtube
      @JSPtube  4 года назад +1

      Dear Vasantha Raj,
      Request you to please specify the specific document you are referring to with the year. The CPWD manual of works 2019 does not have the reference numbers in the format you have shared.
      Regards,
      JSP

    • @vasanthraj9682
      @vasanthraj9682 4 года назад

      @@JSPtube Dear sir please refer cpwd general conditions of contract 2019 and thanks in advance sir

    • @JSPtube
      @JSPtube  4 года назад

      Thanks for the specifics. I will do so (after the meeting I am in now :) )

    • @vasanthraj9682
      @vasanthraj9682 4 года назад

      @@JSPtube Dear sir thank you very much. The lecture is very helpful. Please continue this video series.

  • @ItsBoringChannel
    @ItsBoringChannel 3 года назад

    Banking means stockpiling

    • @JSPtube
      @JSPtube  3 года назад

      Your comment is a little vague. Banking typically in light of roads and railway is the raising of the outer edge of a curve. You can see it in racetracks also. Stockpiling is the storing of bulk material (like aggregates) for construction purposes.
      However, if your comment is in light of the financial sector, it is not relevant to this video.

    • @ItsBoringChannel
      @ItsBoringChannel 3 года назад

      @@JSPtube I meant to say that, stockpiling of suitable excavated earth for future use such as for backfill.

    • @JSPtube
      @JSPtube  3 года назад

      @@ItsBoringChannel Yes. Thank you so much for the point. If RUclips allows, please modify the comment. It will certainly help others :) Thank you so much.

  • @Ajit551kumar
    @Ajit551kumar 3 года назад +1

    Unit L.S. meaning

    • @JSPtube
      @JSPtube  3 года назад +1

      L.S stands for Lump Sum. For the supply of such a material, you will not have separate measurement done. Whatever is required will be integral in that item.

    • @Ajit551kumar
      @Ajit551kumar 3 года назад

      Thank you sir