Chasing BNSF GEs on the Illinois Railnet's Streator Branch 1/28/16

Поделиться
HTML-код
  • Опубликовано: 26 янв 2025

Комментарии • 3

  • @freebrickproductions
    @freebrickproductions 9 лет назад +1

    What equipment is at the first crossing? I like those incandescents and how faded they look! Those old cantilever signals are really cool as well. Is that a signal maintainer at 4:37? The mechanical bell at the last crossing sounds really weak.

    • @TommyBNSF
      @TommyBNSF  9 лет назад +4

      +freebrickproductions 1st crossing had all 12"x20" FS/WCH frames and a WCH M Bell. Yeah, the signal maintainer was out to inspect the crossings since this track is so rarely used, and they had a rusty rail order out or something like that, so the crossings weren't guaranteed to work properly, although all the crossings I went to worked just fine.

  • @randallfunk8389
    @randallfunk8389 9 лет назад +1

    good video