Hi sir, I a plan to build 2nd floor (ground and first fllor beem building) which is best AAC or interlock.Many people says go with normal bricks due to wait issue?? please suggest
Dear sir, good day. My house has been constructed of load bearing structure ,build using bricks, foundation depth 5ft . To reduce the cost of first floor construction, is it suitable to construct using solid blocks on first floor rather bricks. I am opting for solid block because, construction cost is less and it take less time to construct first floor using solid block. Pls advise.
Hi sir enag veedu asthivaram normal LA Load bearing method semman LA kattinom 1997 Semman vaithu base mateum suvar kattinom oottuveedu Apram 2003 LA molde concreet pottum Appo laft keel 2 ft laft mela 2ft cement wall vantchom Vetttoda front LA Mattum 3 column vatchu belt pottrukom front full cement Center and back without column and laft below 2ft cement and laft mela 3 ft cement 2022 ippo ground + 1 floor kattalam nu erukom concrete half part Front half back half Wait thangaumam ?
Sir, ground floor house ku roof level beam recommend panranka,, first floor house ku roof level beam potanuma,, because in future second floor varathu....
@@kgsbuilders sir, one more doubt.. ground floor la plinth beam, belt beam lintel beam, then roof beam varum .. first floor house la lintel beam then roof beam varum.... ground floor la plinth beam maari eathu first floor la varuma sir...
Hi sir we lost our money to builder he made agreement and left the building after plastering completion actually my building is 2394 square feet around 47lakhs came for all including sump septitank wheathering tiles laying we given 40 lakhs upto plastering stage now he is telling you complete the building with remaining 7 lakhs but there is lot of work pending tiles ,wood door,plumping,electrical compund wall how can I take action against him sir
Hello bro .. sorry to hear .. many suffer like this but we can't take a solid action against them ... may make a complaint against him in nearby police station but there are many such incidents which still been without any solution .. so talk to him with any influence..
Sir naga 2nd house vankunom..but eppa mati kattanum...but no rod only sengal building enna sir panna kattalama pls rep..sir 3 adi base mattam .building strongaaaa
Sir one question .if u don't mind please explain me ...na new house construction panren .. 2 floor 🏠 house.. ground floor irukura room oda walls um first floor irukura room oda walls um same ah illa .. structure eapdi plan pananum nu konjam sollunga .sir please
Sir , my house is built in clayey area... moreover house is surrounded by water during rainy season..Pile foundation is done.. water is observed in walls and it cement peels all over the house..Wat to do.. is it possible to built first floor ?
@@kgsbuilders sir one doubt ...ground floorle outer staircase le build panto ...after first floor le innerstair case steps vekka mudiuma sir...nanga plan pnito erukom plz hlp....enum home katale plz say
Hi sir, I a plan to build 2nd floor (ground and first fllor beem building) which is best AAC or interlock.Many people says go with normal bricks due to wait issue?? please suggest
Good video and it is very detail explanation.
Very useful video sir
Sir first floor 550 queare feet ku evvalavu selavu agum sir ple solluga
How much load can be kept in 1 st floor I planned to keep 6 ton above ground pool
Can it withstand
It’s placed in center of pillar and beam
We dont building approval for ground floor but can we get approval for fist floor while building??
Nic video, kept it up sir👊👊👊
Dear sir, good day. My house has been constructed of load bearing structure ,build using bricks, foundation depth 5ft . To reduce the cost of first floor construction, is it suitable to construct using solid blocks on first floor rather bricks. I am opting for solid block because, construction cost is less and it take less time to construct first floor using solid block. Pls advise.
Hi sir enag veedu asthivaram normal LA
Load bearing method semman LA kattinom 1997
Semman vaithu base mateum suvar kattinom oottuveedu
Apram 2003 LA molde concreet pottum
Appo laft keel 2 ft laft mela 2ft cement wall vantchom
Vetttoda front LA Mattum 3 column vatchu belt pottrukom front full cement
Center and back without column and laft below 2ft cement and laft mela 3 ft cement
2022 ippo ground + 1 floor kattalam nu erukom concrete half part
Front half back half
Wait thangaumam ?
சார் 400 ச.அ முதல் மாடி வீடு கட்ட எவ்வளவு செலவாகும்...
Load bearning 4.5" Parapet wall ah cement paste la 9" Wall maathitu adhu mela brick work panni 1st floor room kattalamma sir.
For first floor extension, do we need plan approval?
yes ..
Sir, ground floor house ku roof level beam recommend panranka,, first floor house ku roof level beam potanuma,, because in future second floor varathu....
Roof beam is mandatory in every case .. no matter how many floor we build .. each floor Roof Beam is must bro ..
@@kgsbuilders thankyou so much sir.....
@@kgsbuilders sir, one more doubt.. ground floor la plinth beam, belt beam lintel beam, then roof beam varum .. first floor house la lintel beam then roof beam varum.... ground floor la plinth beam maari eathu first floor la varuma sir...
@@viyakularun3948 No bro .. Lintel and roof beam alone .. you can use cut lintle also
Sir will it be possible to build 1 house in 1st floor and 2 to 3 small houses in 2nd floor for rent purpose?with framed structure building
yes sis...its depends on plot size available and planning possibilities
@@kgsbuilders thank you for ur immediate reply sir...
Can we alter the first floor plan with ground floor...
Hi bro first floor la oru room 150sqft but open terres solli 350 sqft amt kekuraga athu sari aah bro rpl me
Hi sir we lost our money to builder he made agreement and left the building after plastering completion actually my building is 2394 square feet around 47lakhs came for all including sump septitank wheathering tiles laying we given 40 lakhs upto plastering stage now he is telling you complete the building with remaining 7 lakhs but there is lot of work pending tiles ,wood door,plumping,electrical compund wall how can I take action against him sir
Hello bro .. sorry to hear .. many suffer like this but we can't take a solid action against them ... may make a complaint against him in nearby police station but there are many such incidents which still been without any solution .. so talk to him with any influence..
@@kgsbuilders thanks sir I will do
Two legeed scfoolding rate analysis
Sir already 2floor house build pannirukom 15yrs Achu next upper floorla oru kitchen 10×8 build panna evlo selavu aakum
Sir naga 2nd house vankunom..but eppa mati kattanum...but no rod only sengal building enna sir panna kattalama pls rep..sir 3 adi base mattam .building strongaaaa
Mam.. consult a local available civil Engineer to know the details .. it needs site inspection to know about building..
Sir one doubt
Concrete roof water tank best or brick water tank best
Depend on capacity we want and budget we could spend Mr.Yoganadhan ..
What is the budget
Sir one question .if u don't mind please explain me ...na new house construction panren .. 2 floor 🏠 house.. ground floor irukura room oda walls um first floor irukura room oda walls um same ah illa .. structure eapdi plan pananum nu konjam sollunga .sir please
Watch our Video Load bearing structure Vs Framed Structure ... You can change the plan for next floor if It is a framed Structure ..
@@kgsbuilders thanks
Sir , my house is built in clayey area... moreover house is surrounded by water during rainy season..Pile foundation is done.. water is observed in walls and it cement peels all over the house..Wat to do.. is it possible to built first floor ?
Kindly Contact water proofing persons mam.. they will do Nano coating in such parts ...
@@kgsbuilders sir one doubt ...ground floorle outer staircase le build panto ...after first floor le innerstair case steps vekka mudiuma sir...nanga plan pnito erukom plz hlp....enum home katale plz say
Where are from sir ? I'm from madurai.i need experts advice regarding my House
From Tirupur mam..
Sir my house have 35 yrs old (400 sq ft) also pillar rock base 3feet , can I construct one more floor on that
It needs on site inspection.. Kindly consult an Engineer..
Maadiyil toilet enga vekkanum......
Halla vai bro