    0:07 I went through this intersection for the final time before this piece of art comes.

  • @johnfoltz8183
    @johnfoltz8183 11 месяцев назад +5

    They placed the asphalt over compacted soil and not over a bed of compacted gravel?

    • @TeamElmers
      @TeamElmers  9 месяцев назад +3

      It's compacted road gravel in our area due to soil sub-grade type.

  • @Nothinghere0101
    @Nothinghere0101 2 года назад +7

    cool!

  • @noahroth
    @noahroth Год назад +13

    2:48 whoopsie

    • @calimio6
      @calimio6 11 месяцев назад +1

      I would love to know what actually went wrong there

    • @schmitty8225
      @schmitty8225 11 месяцев назад +3

      @@calimio6 It looks like the first time might have been too flat.

  • @railfanningmichael3970
    @railfanningmichael3970 4 месяца назад

    Whats the name of the song?

  • @JL-sm6cg
    @JL-sm6cg 2 месяца назад

    And of course, they use asphalt, pretty much guaranteeing it'll have to be fixed more of ten that necessary. That's MDOT for you.

    • @swilleh_
      @swilleh_ Месяц назад

      what do you prefer? rocks?

    • @JL-sm6cg
      @JL-sm6cg Месяц назад

      @swilleh_ how about actual concrete for a change, hmmmm?

    • @TeamElmers
      @TeamElmers  Месяц назад

      @jl-sm6cg The road was concrete (horribly potholed, never kept a patch, heaved in our freeze/thaw cycle concrete). The engineers chose asphalt for its flexibility in winter. Thanks for asking.

  • @jeremys5904
    @jeremys5904 Год назад +3

    Those lines in the sky are not clouds and they are not condensation.

  • @leafbelly
    @leafbelly 9 месяцев назад +2

    Great! Nice to see our taxpayer dollars being wasted on incorrect sidewalks.

    • @TeamElmers
      @TeamElmers  9 месяцев назад +6

      Actually the contractor pays for any errors. The MDOT inspector confirms what was installed meets the contract design and specifications of the project. If not, than it has to be redone.

    • @bcb102
      @bcb102 2 месяца назад

      I think that's a channel for water, if I'm not mistaken.

  • @TowMater603
    @TowMater603 Год назад

    Traffic Rotary *

  • @jooproos6559
    @jooproos6559 8 месяцев назад

    And what about bikers??No place for them on the round about?😠😠

    • @TeamElmers
      @TeamElmers  8 месяцев назад +1

      The white line denotes bike lane. Bikes would navigate the roundabout accordingly, using the full lane with the flow of traffic. We have some race teams that train in Grand Traverse and Leelanau County. Thanks for sharing your thoughts.