Green Line 4/4A-South-North Metro|Patri Bhichane Ka Kaam Jald Chalu Hoga| Latest Update|

Поделиться
HTML-код
  • Опубликовано: 29 ноя 2024

Комментарии • 12

  • @dipakvanikar6254
    @dipakvanikar6254 11 месяцев назад

    बहुत सुंदर बढिया जाणकारी.अब गौ मुख से आगे भिवंडी कल्याण की ओर का भी update देना।

  • @jamesgeorge777
    @jamesgeorge777 11 месяцев назад

    0:59 "Blastless tracks" - it is Ballast-less tracks (tracks without ballast).

    • @Inframan26
      @Inframan26  11 месяцев назад +1

      Typo mistake. 🙏

    • @jamesgeorge777
      @jamesgeorge777 11 месяцев назад

      @@Inframan26 no worries. Keep up the good work!

    • @Inframan26
      @Inframan26  11 месяцев назад +1

      @@jamesgeorge777 🙏👍

  • @jamesgeorge777
    @jamesgeorge777 11 месяцев назад +2

    NOTE: Confirmed News Update few days back: MMRDA has removed Amar Mahal Metro station from Green Line (Mumbai Metro Line 4) stating there is NO space to build the metro station between the multiple bridges and traffic junction in Amar Mahal (Chembur).
    Another metro station has also been removed from Green Line, reducing total stations to 30, (2 less stations than before which was 32). MMRDA said it was a cost cutting measure.

  • @maximus6825
    @maximus6825 11 месяцев назад

    Thank you for the update🙏...
    Hi, Can u pls update progress of pending Mankhurd Junction Flyover (Chembur to Thane side arm) ?

  • @AjinkyaMayekar
    @AjinkyaMayekar 11 месяцев назад +4

    2 stations are canceled

    • @Inframan26
      @Inframan26  11 месяцев назад +1

      Yes..From Sidhartha Colony to Garodia Nagar almost 3km strech 🙏